Shanxi Zhongsheng Iron and Steel Co Ltd (山西中升钢铁有限公司) is a basic oxygen furnace (BOF) steel plant operating in Linfen, Shanxi, China.

Location

The map below shows the exact location of the plant in Linfen, Shanxi, China:

Loading map...
  • Location: Yonggu Township, Xiangfen County, Linfen City, Shanxi Province
  • Coordinates (WGS 84): 35.727776, 111.330122 (exact)

Background

The company has announced the construction of the capacity replacement, upgrade, and renovation project for a 1×155-ton steelmaking converter. This project is located in Yonggu Township, Xiangfen County, Linfen City, within the existing factory area. The main construction includes the dismantling of the existing 2×60-ton steelmaking converters and the replacement with one 155-ton top-bottom blowing converter, one 155-ton LF steel refining furnace, one 12-machine 12-strand billet continuous casting machine, and a 25,000 Nm3/h oxygen production facility. The total investment in the project is 794.7 million yuan, with an environmental protection investment of 28.4 million yuan.[1]

Plant Details

Table 1: General Plant Details

Phase Plant status Announced date Construction date Start date Pre-retirement announcement date Workforce size
Main plant Operating[2] 2007[3] 788[2]
Expansion Construction[4] 2021-11-05[5] 2022-08-05[4]
Closure Operating pre-retirement[5] 2021-11-05[5]

Table 2: Ownership and Parent Company Information

Phase Parent company Parent company GEM ID Owner Owner company GEM ID
Main plant Shanxi Zhongsheng Iron and Steel Co Ltd [100%] E100000123261 [100%] Shanxi Zhongsheng Iron and Steel Co., Ltd.[2] E100000127019

Table 3: Process and Products

Phase Steel product category Steel products Steel sector end users ISO 14001 Main production equipment Detailed production equipment
Main plant semi-finished; finished rolled[6] high-quality carbon structural steel billets, bars, high-speed wire rods[6] building and infrastructure; transport[6] 2023[7] BF, BOF[8] 2 BOF (2x60-tonne)[8]
Expansion semi-finished; finished rolled[6] high-quality carbon structural steel billets, bars, high-speed wire rods[6] building and infrastructure; transport[6] BOF[5] 1 BOF (1x155-tonne)[5]
Closure semi-finished; finished rolled[6] high-quality carbon structural steel billets, bars, high-speed wire rods[6] building and infrastructure; transport[6] BOF[5] 2 BOF (2x60-tonne)[5]

Table 4: Crude Steel Production Capacities (thousand tonnes per annum)

*Please see our Frequently Asked Questions page for an explanation of the different capacity operating statuses.
Phase Capacity operating status* Basic oxygen furnace steelmaking capacity Nominal crude steel capacity (total)
Main plant operating
Expansion construction 1650 TTPA[5] 1650 TTPA[5]
Closure operating pre-retirement 1700 TTPA[5][5] 1700 TTPA[5][5]

Table 5: Crude Iron Production Capacities (thousand tonnes per annum)

*Please see our Frequently Asked Questions page for an explanation of the different capacity operating statuses.
Phase Capacity operating status* Blast furnace capacity Nominal iron capacity (total)
Main plant operating 1130 TTPA[9] 1130 TTPA[9]
Expansion construction
Closure operating pre-retirement

Blast Furnace Details

Table 6: Blast Furnace Details

Unit name Status Announced date Construction date Start date Current size Current capacity (ttpa) Decarbonization technology Most recent relining
unknown operating[8] unknown unknown 2014-04-01 00:00:00[10] 1200 m³[8] 1130[9] unknown unknown

Articles and Resources

Additional data

To access additional data, including an interactive map of steel power plants, a downloadable dataset, and summary data, please visit the Global Steel Plant Tracker on the Global Energy Monitor website.

References

  1. "关于山西中升钢铁有限公司产能置换升级改造建设1×155t炼钢转炉项目环境影响报告书的批复". 新浪财经. 2022-01-11.
  2. 2.0 2.1 2.2 https://web.archive.org/web/20220110223713/https://www.qcc.com/firm/423656dcc3a236b0e35166d0616b7f6f.html. Archived from the original on 10 January 2022. {{cite web}}: Missing or empty |title= (help)
  3. https://web.archive.org/web/20210420020003/http://yaxin-group.com/danye.aspx?NRID=18&LanMuId=15&lanType=ch. Archived from the original on 20 April 2021. {{cite web}}: Missing or empty |title= (help)
  4. 4.0 4.1 https://web.archive.org/web/20240123174038/http://www.hbyjjt.cn/wzgyfb.asp?ID=386. Archived from the original on 23 January 2024. {{cite web}}: Missing or empty |title= (help)
  5. 5.00 5.01 5.02 5.03 5.04 5.05 5.06 5.07 5.08 5.09 5.10 5.11 5.12 https://www.fm086.com/Article/Article?id=259195&typeid=9. {{cite web}}: Missing or empty |title= (help)
  6. 6.0 6.1 6.2 6.3 6.4 6.5 6.6 6.7 6.8 http://www.yaxin-group.com/liebiao_show.aspx?lieId=222&idd=21&LanMuId=15&lanType=ch. {{cite web}}: Missing or empty |title= (help)
  7. http://cx.cnca.cn/CertECloud/result/skipResultList?certNumber=&orgName=%E5%B1%B1%E8%A5%BF%E4%B8%AD%E5%8D%87%E9%92%A2%E9%93%81%E6%9C%89%E9%99%90%E5%85%AC%E5%8F%B8&fromIndex=true. {{cite web}}: Missing or empty |title= (help)
  8. 8.0 8.1 8.2 8.3 https://web.archive.org/web/20220207192044/https://finance.sina.com.cn/money/future/indu/2020-03-02/doc-iimxxstf5776330.shtml. Archived from the original on 07 February 2022. {{cite web}}: Check date values in: |archive-date= (help); Missing or empty |title= (help)
  9. 9.0 9.1 9.2 (PDF) https://web.archive.org/web/20220224072927/http://www.gov.cn/zhengce/zhengceku/2021-05/07/5605092/files/4362a77483354513be0fc81be53a4a64.pdf. Archived from the original (PDF) on 24 February 2022. {{cite web}}: Missing or empty |title= (help)
  10. http://slt.shanxi.gov.cn/zxfw/sgszl/202108/t20210830_3148309.html. {{cite web}}: Missing or empty |title= (help)

Resources