Chengdu Changfeng Iron and Steel Group Co Ltd

From Global Energy Monitor
This article is part of the
Global Steel Plant Tracker, a project of Global Energy Monitor.
Download full dataset
Report an error
Sub-articles:

Chengdu Changfeng Iron and Steel Group Co., Ltd. (成都市长峰钢铁集团有限公司), also known as Chengdu Qingcheng Iron and Steel Plant, is a 800 thousand tonnes per annum (TTPA) electric arc furnace (EAF) steel plant operating in Chengdu, Sichuan, China.

Location

The map below shows the location of the steel plant in Chengdu, Sichuan, China.

Loading map...
  • Location: No. 214, Xiangyang Street, Dujiangyan Economic Development Zone, Chengdu City,Sichuan Province[1]
  • Coordinates (WGS 84): 31.031921, 103.672956 (exact)

Background

The company is building a 50-tonne electric arc furnace and a 100-tonne electric arc furnace each, which would be put into trial production soon, and two of the four 40-tonne electric arc furnaces have been dismantled before December 31, 2021.[2][3] In April 2022, the 50-tonne electric arc furnace has been completed and put into operation, and the main equipment and supporting facilities of the 100-tonne electric arc furnace have been basically completed.[4]


Plant Details

Table 1: General Plant Details

Plant status Start date Workforce size
operating[1] 1970[5] 1020[1]

Table 2: Ownership and Parent Company Information

Parent company Parent company PermID Owner Owner company PermID
Chengdu Changfeng Iron and Steel Group Co., Ltd. [100%][1] GEM0000028 [100%] Chengdu Changfeng Iron and Steel Group Co., Ltd.[1] GEM0000028

Table 3: Process and Products

Steel product category Steel products Steel sector end users Main production equipment Detailed production equipment
finished rolled[5] Vanadium Titanium Seismic Rebar[5] building and infrastructure[5] electric arc furnace (EAF)[5][6] 2 EAF(2x40-tonne)[5][6]

Table 4: Crude Steel Production Capacities (thousand tonnes per annum):

Electric arc furnace steelmaking capacity Nominal crude steel capacity (total)
800 TTPA[7] 800 TTPA

Articles and Resources

Additional data

To access additional data, including an interactive map of steel power plants, a downloadable dataset, and summary data, please visit the Global Steel Plant Tracker on the Global Energy Monitor website.

  1. 1.0 1.1 1.2 1.3 1.4 https://web.archive.org/web/20220111134134/https://www.qcc.com/firm/54a55f21ede150068917d73e991e4385.html. Archived from the original on 2022-01-11. {{cite web}}: Missing or empty |title= (help)
  2. "成都长峰钢铁集团技改项目新建50t、100t电炉环评公示",四川省钒钛钢铁产业协会,2019-4-26
  3. "都江堰市这家钢铁加工企业投入18亿元升级改造冶炼装备!",每日都江堰,August 26, 2021
  4. "长峰钢铁100t电炉主体设备及配套设施已基本建成". 2022-04-02.
  5. 5.0 5.1 5.2 5.3 5.4 5.5 https://web.archive.org/web/20220319042435/https://www.cfgtjt.com/intro/1.html. Archived from the original on 2022-03-19. {{cite web}}: Missing or empty |title= (help)
  6. 6.0 6.1 https://web.archive.org/web/20220318140517/https://finance.sina.com.cn/money/future/indu/2022-01-06/doc-ikyakumx8647364.shtml. Archived from the original on 2022-03-18. {{cite web}}: Missing or empty |title= (help)
  7. https://www.cfgtjt.com/intro/1.html;https://info.lgmi.com/html/202201/06/3798.htm. {{cite web}}: Missing or empty |title= (help)