30em

📝 Help us learn how people like you use GEM Wiki! Take this short survey!📝

Data will be retained following our Privacy Policy. The survey is completed in Google Forms (Privacy policy and Terms of Service)

N Baker Road 2 solar project

From Global Energy Monitor
This article is part of the
Global Solar Power Tracker, a Global Energy Monitor project.
Report an error

N Baker Road 2 solar project is a solar photovoltaic (PV) farm under construction in Stephenson County, Illinois, United States.

Project Details

Table 1: Phase-level project details for N Baker Road 2 solar project

Phase name Status Commissioning year Nameplate capacity Technology Owner
680 Construction[1] 2025 (planned)[1] 2 MWac[1] PV[1] Greenbacker Renewable Energy Corp[1]

Read more about Solar capacity ratings.

Location

Table 2: Phase-level location details for N Baker Road 2 solar project

Phase Name Location Coordinates (WGS 84)
680 Stephenson County, Illinois, United States[1] 42.4359, -89.9047 (exact)[1]

The map below shows the exact location of the solar farm:

Loading map...

Articles and Resources

Additional data

To access additional data, including an interactive map of global solar farms, a downloadable dataset, and summary data, please visit the Global Solar Power Tracker on the Global Energy Monitor website.

References

  1. 1.0 1.1 1.2 1.3 1.4 1.5 1.6 "Preliminary Monthly Electric Generator Inventory (based on Form EIA-860M as a supplement to Form EIA-860) - U.S. Energy Information Administration (EIA)". www.eia.gov. Archived from the original on 2023-05-09. Retrieved 2025-01-06.