Qinzhou-III power station (国投钦州发电厂) is an operating power station of at least 660-megawatts (MW) in 3 Guoying Ave, Qinnan, Qinzhou, Guangxi, China with multiple units, some of which are not currently operating. It is also known as SDIC Qinzhou-III power station, 国投广西钦州电厂三期.

Location

Table 1: Project-level location details

Plant name Location Coordinates (WGS 84)
Qinzhou-III power station 3 Guoying Ave, Qinnan, Qinzhou, Guangxi, China 21.752169, 108.625584 (exact)

The map below shows the exact location of the power station.

Loading map...


Unit-level coordinates (WGS 84):

  • Phase III Unit 1, Phase III Unit 2, Phase III Unit 3, Phase III Unit 4: 21.752169, 108.625584

Project Details

Table 2: Unit-level details

Unit name Status Fuel(s) Capacity (MW) Technology Start year Retired year
Phase III Unit 1 operating[1] coal - bituminous 660 ultra-supercritical 2023[1]
Phase III Unit 2 construction coal - bituminous 660 ultra-supercritical 2024
Phase III Unit 3 permitted coal - bituminous 660 ultra-supercritical 2025
Phase III Unit 4 permitted coal - bituminous 660 ultra-supercritical 2025

Table 3: Unit-level ownership and operator details

Unit name Owner
Phase III Unit 1 SDIC Qinzhou No.2 Power Generation Co Ltd [100.0%]
Phase III Unit 2 SDIC Qinzhou No.2 Power Generation Co Ltd [100.0%]
Phase III Unit 3 SDIC Qinzhou No.2 Power Generation Co Ltd [100.0%]
Phase III Unit 4 SDIC Qinzhou No.2 Power Generation Co Ltd [100.0%]

Project-level coal details

  • Permit(s): December 5, 2020, January 17, 2022, August 23, 2022

Background

The site is the third phase of the Qinzhou power station and was relocated nearby.

Phase III

In March 2020, a 2 x 1,000MW coal-fired expansion at the Qinzhou power station was listed as a preliminary project in the Guangxi "Energy Network Infrastructure Plan 2020-2022" (《广西“能源网”基础设施建设大会战实施方案(2020-2022年)》).[2]

In December 2020, one new 660 MW unit was permitted for construction at the power station. Another 660 MW unit was proposed.[3]

The ceremony for construction beginning was held in December 2020, but did not mark the start of actual construction.[4]

The ceremony for the first load of construction was then held December 21, 2021. The ceremony was now for 4 x 660 MW power station phase, even though only one unit was previously permitted for construction. The news noted the estimated commissioning date for unit one (unit 5 of the Qinzhou power station) was November 2023, and February 2024 for unit two (unit 6 of the SDIC Qinzhou power station). The proposal was relocated to approximately 7 km away from the first and second phases.[5]

Unit 2 of Phase III was permitted on January 17, 2022.[6]

Units 3 and 4 were permitted in August 2022.[7]

Planet satellite imagery from 2020 to 2022 show development at the site.

Articles and Resources

References

  1. 1.0 1.1 https://web.archive.org/web/20240207002036/https://news.bjx.com.cn/html/20240102/1353424.shtml. Archived from the original on 07 February 2024. {{cite web}}: Check date values in: |archive-date= (help); Missing or empty |title= (help)
  2. "总投资445.6亿元!广西2020-2022年将推进7个煤电项目," Sohu, 2020-03-04
  3. "国投钦州电厂三期1号机组项目获得核准批复 - 北极星火力发电网". news.bjx.com.cn. 2020-12-31. Retrieved 2021-01-05.{{cite web}}: CS1 maint: url-status (link)
  4. "国投钦州电厂三期项目动工仪式," 中国火力发电网, 2020-12-29
  5. "开工!国投钦州电厂三期项目举行奠基暨主厂房第一罐混凝土浇筑仪式," 中国(广西)自由贸易试验区钦州港片区协调指导局, 2021-12-22
  6. "660MW!国投钦州电厂三期2号机组项目获核准批复," china5e, SDIC online, 2022-01-21
  7. "2×660MW!国投钦州电厂三期3、4号机组项目获核准," BJX News, 2022-08-23