Qinzhou-III power station
Part of the Global Coal Plant Tracker, a Global Energy Monitor project. |
Related coal trackers: |
Qinzhou-III power station (国投钦州发电厂) is an operating power station of at least 660-megawatts (MW) in 3 Guoying Ave, Qinnan, Qinzhou, Guangxi, China with multiple units, some of which are not currently operating. It is also known as SDIC Qinzhou-III power station, 国投广西钦州电厂三期.
Location
Table 1: Project-level location details
Plant name | Location | Coordinates (WGS 84) |
---|---|---|
Qinzhou-III power station | 3 Guoying Ave, Qinnan, Qinzhou, Guangxi, China | 21.752169, 108.625584 (exact) |
The map below shows the exact location of the power station.
Unit-level coordinates (WGS 84):
- Phase III Unit 1, Phase III Unit 2, Phase III Unit 3, Phase III Unit 4: 21.752169, 108.625584
Project Details
Table 2: Unit-level details
Unit name | Status | Fuel(s) | Capacity (MW) | Technology | Start year | Retired year |
---|---|---|---|---|---|---|
Phase III Unit 1 | operating[1] | coal - bituminous | 660 | ultra-supercritical | 2023[1] | – |
Phase III Unit 2 | construction | coal - bituminous | 660 | ultra-supercritical | 2024 | – |
Phase III Unit 3 | permitted | coal - bituminous | 660 | ultra-supercritical | 2025 | – |
Phase III Unit 4 | permitted | coal - bituminous | 660 | ultra-supercritical | 2025 | – |
Table 3: Unit-level ownership and operator details
Unit name | Owner |
---|---|
Phase III Unit 1 | SDIC Qinzhou No.2 Power Generation Co Ltd [100.0%] |
Phase III Unit 2 | SDIC Qinzhou No.2 Power Generation Co Ltd [100.0%] |
Phase III Unit 3 | SDIC Qinzhou No.2 Power Generation Co Ltd [100.0%] |
Phase III Unit 4 | SDIC Qinzhou No.2 Power Generation Co Ltd [100.0%] |
Project-level coal details
- Permit(s): December 5, 2020, January 17, 2022, August 23, 2022
Background
The site is the third phase of the Qinzhou power station and was relocated nearby.
Phase III
In March 2020, a 2 x 1,000MW coal-fired expansion at the Qinzhou power station was listed as a preliminary project in the Guangxi "Energy Network Infrastructure Plan 2020-2022" (《广西“能源网”基础设施建设大会战实施方案(2020-2022年)》).[2]
In December 2020, one new 660 MW unit was permitted for construction at the power station. Another 660 MW unit was proposed.[3]
The ceremony for construction beginning was held in December 2020, but did not mark the start of actual construction.[4]
The ceremony for the first load of construction was then held December 21, 2021. The ceremony was now for 4 x 660 MW power station phase, even though only one unit was previously permitted for construction. The news noted the estimated commissioning date for unit one (unit 5 of the Qinzhou power station) was November 2023, and February 2024 for unit two (unit 6 of the SDIC Qinzhou power station). The proposal was relocated to approximately 7 km away from the first and second phases.[5]
Unit 2 of Phase III was permitted on January 17, 2022.[6]
Units 3 and 4 were permitted in August 2022.[7]
Planet satellite imagery from 2020 to 2022 show development at the site.
Articles and Resources
References
- ↑ 1.0 1.1 https://web.archive.org/web/20240207002036/https://news.bjx.com.cn/html/20240102/1353424.shtml. Archived from the original on 07 February 2024.
{{cite web}}
: Check date values in:|archive-date=
(help); Missing or empty|title=
(help) - ↑ "总投资445.6亿元!广西2020-2022年将推进7个煤电项目," Sohu, 2020-03-04
- ↑ "国投钦州电厂三期1号机组项目获得核准批复 - 北极星火力发电网". news.bjx.com.cn. 2020-12-31. Retrieved 2021-01-05.
{{cite web}}
: CS1 maint: url-status (link) - ↑ "国投钦州电厂三期项目动工仪式," 中国火力发电网, 2020-12-29
- ↑ "开工!国投钦州电厂三期项目举行奠基暨主厂房第一罐混凝土浇筑仪式," 中国(广西)自由贸易试验区钦州港片区协调指导局, 2021-12-22
- ↑ "660MW!国投钦州电厂三期2号机组项目获核准批复," china5e, SDIC online, 2022-01-21
- ↑ "2×660MW!国投钦州电厂三期3、4号机组项目获核准," BJX News, 2022-08-23