Jawa-7 power station

From Global Energy Monitor
(Redirected from Serang power station)

Jawa-7 power station is a 1,982-megawatt (MW) coal-fired power plant in Banten Province, Indonesia.

Location

The satellite photo below shows the project, located in Desa Terate, Kecamatan Kramatwatu, Serang Regency, Banten Province.

Loading map...

Background on Plant

The project was proposed by Pembangkitan Jawa Bali, a division of state-owned PLN. The sponsor hoped to attract other co-sponsors, eventually owning only 30 percent of the project.[1]

The project is shown on PLN's long-range plan. It comprises two 1000 MW units, one targeted for 2019 and the other targeted for 2020. Further details are not provided.[2]

In December 2014, PLN opened bidding for the construction contract for Jawa-7. The company plans to begin construction in the first half of 2016, and have the plant completed by 2020.[3] The plant is slated to cost 72 trillion rupiahs, or about US$5 billion.[4]

In December 2015, PLN Director of Corporate Planning Nicke Widyawati said that the project will begin construction in April 2016. The project was awarded to a consortium whose members are PT Pembankitan Jawa Bali (PJB) and China Shenhua Energy.[5]

In May 2017, PLN announced that the project would be completed in 2019, sooner than expected.[6] The Indonesia Electricity Supply Business Plan (RUPTL) for 2018-2027 gives a completion date of 2020 for the plant and gives a capacity of 991 MW for Unit 1 and 991 MW for Unit 2.[7]

Satellite imagery from Planet shows construction progress from April 2016 to March 2018.

In March 2019, state power company PT PLN Persero estimated that the plant would be commissioned in October 2019, ahead of schedule.[8] In December 2019, Unit 1 was commissioned.[9]

In March 2020, the project's sponsor declared force majeure and stated that development would be delayed as a result of the COVID-19 pandemic.[10] Unit 2 was commissioned in September 2020.[11]

Financing

In September 2015, state-run builder Wijaya Karya (WIKA) said the company would likely request a credit facility from China Development Bank (CDB) to fund development of the Jawa-5 power station and Jawa-7 power station. WIKA said it would work with China Nuclear Group Engineering Corporation (CNEC) and a local firm, Sumber Segara Primadaya, for the Java plants.[12]

In December 2015, it was reported China Shenhua Energy had been awarded the development and operation contract. The company will sign a 25-year power purchase and sales contract with PLN, then will be handed over to PLN.[13]

In September 2016, China Shenhua Energy and China Development Bank signed the financial closure for the project for a loan of US$1.8 billion. HSBC acted as financial adviser for the agreement.[14] According to PLN, the project cost is US$1.8 billion. The consortium has formed a special purpose vehicle for the project under the name Shenhua Guohua Power Jawa Bali.[15]

Project Details

  • Sponsor: Shenhua Guohua Power Jawa Bali
  • Parent: China National Energy Investment Group, 70%; PT Pembangkitan Jawa Bali (PJB), 30%
  • Location: Desa Terate, Kecamatan Kramatwatu, Serang Regency, Banten Province, Java, Indonesia
  • Coordinates: -5.9916943, 106.1008005 (exact)
  • Status: Unit 1: Operating; Unit 2: Operating
  • Gross Capacity: 1,982 MW (2 x 991 MW)
  • Type: Supercritical
  • In service: Unit 1: 2019; Unit 2: 2020
  • Coal Type:
  • Coal Source:
  • Source of financing: US$1.8 billion in debt from China Development Bank[14]

Articles and resources

References

  1. "PT Pembangkitan Jawa Bali, a division of SOE power generator PLN, plans to build 2x1GW coal fired power plant in Serang, Banten commencing 2016," Saham.WS, April 23, 2015
  2. “PLN Long Term Electricity Plan (2013-2023),” presentation by Moch. Sofyan, Head of New & Renewable Division of PT PLN (Persero), 06 March 2014
  3. PLN Tenderkan PLTU Jawa 7, PT PLN press release, 2 Dec. 2014.
  4. PLN Buka Tender PLTU Jawa 7 untuk Swasta, Tambang, 1 Dec. 2014.
  5. "PLN expects to soon start construction of PLTU Jawa 7, PLTU Cilacap, PLTU Cirebon," RambuEnergy, March 1, 2016
  6. PLTU Java 7 Targeted To Be Completed A Year Faster, CNN Indonesia, May 10, 2017
  7. Rencana Usaha Penyediaan Tenaga Listrik (RUPTL) 2018-2027, PT PLN Persero
  8. PLTU Jawa 7 Beroperasi Lebih Cepat, PLN Bisa Hemat Rp 1 Triliun, Katadata, Mar. 29, 2019
  9. Indonesia's biggest thermal power plant is operational, Antara News, Dec. 16, 2019
  10. Jadwal operasional pembangkit terganggu wabah corona, ini tanggapan PLN, Kontan, Mar. 8, 2020
  11. Dilengkapi Teknologi Desalinasi air Laut, PLTU Jawa-7 berkapasitas Megawatt telah beroperasi, Radar Bangsa, Oct. 20, 2020
  12. "WIKA may use Chinese loans to build power plants," The Jakarta Post, September 17 2015
  13. "China Shenhua Energy to Gain Jawa-7 Project in Indonesia," 4-traders, 12/30/15
  14. 14.0 14.1 "Preview of Java-7 Coal-Fired Power Plant (2000MW) IPP | Transaction | IJGlobal". ijglobal.com. Retrieved 2020-11-05.
  15. Michael Agustinus, "PLTU 'Raksasa' 2.000 MW di Banten Mulai Dibangun," Detik Finance, 16 October 2016

Related GEM.wiki articles

External resources