TZMS Třinecké železárny Trinec steel plant
This article is part of the Global Steel Plant Tracker, a project of Global Energy Monitor. |
Sub-articles: |
This article is part of the Global Blast Furnace Tracker, a project of Global Energy Monitor. |
Sub-articles: |
TZMS Třinecké železárny Trinec steel plant, also known as Třinec Iron and Steel Works, is a 2800 thousand tonnes per annum (TTPA) blast furnace (BF), basic oxygen furnace (BOF) and electric arc furnace (EAF) steel plant operating in Třinec, Moravia-Silesia, Czech Republic.
Location
The map below shows the location of the steel plant in Třinec, Moravia-Silesia, Czech Republic.
- Location: Průmyslová 1000, Staré Město, 739 61 Třinec, Czech Republic[1]
- Coordinates (WGS 84): 49.689053, 18.654557 (exact)
Plant Details
Table 1: General Plant Details
Plant status | Start date | Workforce size |
---|---|---|
operating[2] | 1906[3] | 6000[4] |
Table 2: Ownership and Parent Company Information
Parent company | Parent company PermID | Owner | Owner company PermID |
---|---|---|---|
Trinecke Zelezarny as [50%]; Moravia Steel as [50%][3] | 4295865795 [50%]; 4296105198 [50%] | Trinecke Zelezarny as[3] | 4295865795 |
Table 3: Process and Products
Steel product category | Steel products | ISO 14001 | ISO 50001 | Main production equipment | Detailed production equipment |
---|---|---|---|---|---|
semi-finished; finished rolled[3] | rails, wire rod, steel bars, semis, seamless tubes, drawn steel, billet[5] | 2019[6] | 2019[7] | blast furnace (BF), basic oxygen furnace (BOF) and electric arc furnace (EAF)[8] | 2 coking plants; 2 sinter plants; 2 BOF; 1 EAF[9][10][11][8] |
Table 4: Crude Steel Production Capacities (thousand tonnes per annum):
Basic oxygen furnace steelmaking capacity | Electric arc furnace steelmaking capacity | Nominal crude steel capacity (total) |
---|---|---|
2600 TTPA[9][11][12] | 200 TTPA[9][11] | 2800 TTPA |
Table 5: Crude Iron Production Capacities (thousand tonnes per annum):
Blast furnace capacity | Nominal iron capacity (total) |
---|---|
2100 TTPA[9] | 2100 TTPA |
Table 6: Upstream Products Production Capacities (thousand tonnes per annum)
Sinter | Coke |
---|---|
>0 TTPA[11] | 700 TTPA[13] |
Table 7: Actual Crude Steel Production by Year (thousand tonnes per annum):
Year | BOF Production | EAF Production | OHF Production | Total (all routes) |
---|---|---|---|---|
2020 | 2382 TTPA[11] | 199 TTPA[11] | – | 2581 TTPA |
2021 | 2400 TTPA[14] | – | – | 2400 TTPA |
Table 8: Actual Crude Iron Production by Year (thousand tonnes per annum):
Year | BF Production | DRI Production | Total (all routes) |
---|---|---|---|
2020 | 2107 TTPA[11] | – | 2107 TTPA |
Blast Furnace Details
Table 9: Blast Furnace Details:
Unit name | Status | Start date | Current size | Current capacity | Decarbonization technology |
---|---|---|---|---|---|
4 | operating[10][12] | 1965[10][12] | 8 meters (hearth diameter)[15] | 1100 TTPA[16][9] | Constructing a cold iron briquetting line for use in the blast furnaces and starting the reuse of coke oven gas throughout the plant, all with the aim of emissions reduction[17][18] |
6 | operating[10][12] | 1952[10][12] | 8 meters (hearth diameter)[15] | 1000 TTPA[10] | Constructing a cold iron briquetting line for use in the blast furnaces and starting the reuse of coke oven gas throughout the plant, all with the aim of emissions reduction[17][18] |
Articles and Resources
References
- ↑ https://web.archive.org/web/20220119162737/https://industry.eea.europa.eu/. Archived from the original on 2022-01-19.
{{cite web}}
: Missing or empty|title=
(help) - ↑ https://web.archive.org/web/20220121144439/https://www.trz.cz/articles/54/history. Archived from the original on 2022-01-21.
{{cite web}}
: Missing or empty|title=
(help) - ↑ 3.0 3.1 3.2 3.3 https://web.archive.org/web/20211121121446/https://www.trz.cz/main-page/47/intro. Archived from the original on 2021-11-21.
{{cite web}}
: Missing or empty|title=
(help) - ↑ https://web.archive.org/web/20211028214808/https://www.trz.cz/articles/72/job-seekers. Archived from the original on 2021-10-28.
{{cite web}}
: Missing or empty|title=
(help) - ↑ https://web.archive.org/web/20211207060425/https://www.steelonthenet.com/directory/steelmaking/trinecke-zelezarny.html. Archived from the original on 2021-12-07.
{{cite web}}
: Missing or empty|title=
(help) - ↑ (PDF) https://www.trz.cz/upload/1/files/EN%20ISO%2014001_A.pdf.
{{cite web}}
: Missing or empty|title=
(help) - ↑ (PDF) https://www.trz.cz/upload/1/files/EN%20ISO%2050001_A.pdf.
{{cite web}}
: Missing or empty|title=
(help) - ↑ 8.0 8.1 (PDF) https://web.archive.org/web/20211028180828/https://www.trz.cz/upload/1/files/TZ_AR_2019.pdf. Archived from the original (PDF) on 2021-10-28.
{{cite web}}
: Missing or empty|title=
(help) - ↑ 9.0 9.1 9.2 9.3 9.4 (PDF) https://web.archive.org/web/20220318115528/https://www.eurofer.eu/assets/Uploads/Map-20191113_Eurofer_SteelIndustry_Rev3-has-stainless.pdf. Archived from the original (PDF) on 2022-03-18.
{{cite web}}
: Missing or empty|title=
(help) - ↑ 10.0 10.1 10.2 10.3 10.4 10.5 https://web.archive.org/web/20211207093806/https://trz.cz/articles/81/dok445/the-blast-furnace-is-under-reconstruction-after-twenty-two-years. Archived from the original on 2021-12-07.
{{cite web}}
: Missing or empty|title=
(help) - ↑ 11.0 11.1 11.2 11.3 11.4 11.5 11.6 (PDF) https://web.archive.org/web/20220318214125/https://www.trz.cz/upload/1/files/TZ_AR_2020.pdf. Archived from the original (PDF) on 2022-03-18.
{{cite web}}
: Missing or empty|title=
(help) - ↑ 12.0 12.1 12.2 12.3 12.4 https://web.archive.org/web/20220825185936/https://www.fastmarkets.com/insights/czech-steelmaker-trinecke-zelezarny-to-upgrade-blast-furnace-to-cut-emissions. Archived from the original on 2022-08-25.
{{cite web}}
: Missing or empty|title=
(help) - ↑ (PDF) https://d9-wret.s3.us-west-2.amazonaws.com/assets/palladium/production/s3fs-public/atoms/files/myb3-2017-18_Czechia.pdf.
{{cite web}}
: Missing or empty|title=
(help) - ↑ https://web.archive.org/web/20220925050232/https://trz.cz/articles/81/dok491/trinecke-zelezarny-concluded-its-2021-financial-year. Archived from the original on 2022-09-25.
{{cite web}}
: Missing or empty|title=
(help) - ↑ 15.0 15.1 (PDF) http://www.envicomab.com/wp-content/uploads/2014/08/Lungmuss-Taphole-Clay-Brochure-Blast-Furnaces.pdf.
{{cite web}}
: Missing or empty|title=
(help) - ↑ https://www.sms-group.com/it-it/sms-newsletter-issue-012020-47/download.
{{cite web}}
: Missing or empty|title=
(help) - ↑ 17.0 17.1 https://web.archive.org/web/20230313101155/https://www.steelguru.com/steel/trinecke-zelezarny-to-cut-carbon-footprints-in-2023. Archived from the original on 2023-03-13.
{{cite web}}
: Missing or empty|title=
(help) - ↑ 18.0 18.1 https://web.archive.org/web/20230308115229/https://gmk.center/en/news/czech-trinecke-zelezarny-invests-45-2-million-in-decarbonization/. Archived from the original on 2023-03-08.
{{cite web}}
: Missing or empty|title=
(help)
Other resources
Wikipedia also has an article on TZMS Třinecké železárny Trinec steel plant. This article may use content from the Wikipedia article under the terms of the GFDL.
Additional data
To access additional data, including an interactive map of steel power plants, a downloadable dataset, and summary data, please visit the Global Steel Plant Tracker and Global Blast Furnace Tracker on the Global Energy Monitor website.