TZMS Třinecké železárny Trinec steel plant

From Global Energy Monitor

TZMS Třinecké železárny Trinec steel plant, also known as Třinec Iron and Steel Works, is a 2800 thousand tonnes per annum (TTPA) blast furnace (BF), basic oxygen furnace (BOF) and electric arc furnace (EAF) steel plant operating in Třinec, Moravia-Silesia, Czech Republic.

Location

The map below shows the location of the steel plant in Třinec, Moravia-Silesia, Czech Republic.

Loading map...
  • Location: Průmyslová 1000, Staré Město, 739 61 Třinec, Czech Republic[1]
  • Coordinates (WGS 84): 49.689053, 18.654557 (exact)


Plant Details

Table 1: General Plant Details

Plant status Start date Workforce size
operating[2] 1906[3] 6000[4]

Table 2: Ownership and Parent Company Information

Parent company Parent company PermID Owner Owner company PermID
Trinecke Zelezarny as [50%]; Moravia Steel as [50%][3] 4295865795 [50%]; 4296105198 [50%] Trinecke Zelezarny as[3] 4295865795

Table 3: Process and Products

Steel product category Steel products ISO 14001 ISO 50001 Main production equipment Detailed production equipment
semi-finished; finished rolled[3] rails, wire rod, steel bars, semis, seamless tubes, drawn steel, billet[5] 2019[6] 2019[7] blast furnace (BF), basic oxygen furnace (BOF) and electric arc furnace (EAF)[8] 2 coking plants; 2 sinter plants; 2 BOF; 1 EAF[9][10][11][8]

Table 4: Crude Steel Production Capacities (thousand tonnes per annum):

Basic oxygen furnace steelmaking capacity Electric arc furnace steelmaking capacity Nominal crude steel capacity (total)
2600 TTPA[9][11][12] 200 TTPA[9][11] 2800 TTPA

Table 5: Crude Iron Production Capacities (thousand tonnes per annum):

Blast furnace capacity Nominal iron capacity (total)
2100 TTPA[9] 2100 TTPA

Table 6: Upstream Products Production Capacities (thousand tonnes per annum)

Sinter Coke
>0 TTPA[11] 700 TTPA[13]

Table 7: Actual Crude Steel Production by Year (thousand tonnes per annum):

Year BOF Production EAF Production OHF Production Total (all routes)
2020 2382 TTPA[11] 199 TTPA[11] 2581 TTPA
2021 2400 TTPA[14] 2400 TTPA

Table 8: Actual Crude Iron Production by Year (thousand tonnes per annum):

Year BF Production DRI Production Total (all routes)
2020 2107 TTPA[11] 2107 TTPA


Blast Furnace Details

Table 9: Blast Furnace Details:

Unit name Status Start date Current size Current capacity Decarbonization technology
4 operating[10][12] 1965[10][12] 8 meters (hearth diameter)[15] 1100 TTPA[16][9] Constructing a cold iron briquetting line for use in the blast furnaces and starting the reuse of coke oven gas throughout the plant, all with the aim of emissions reduction[17][18]
6 operating[10][12] 1952[10][12] 8 meters (hearth diameter)[15] 1000 TTPA[10] Constructing a cold iron briquetting line for use in the blast furnaces and starting the reuse of coke oven gas throughout the plant, all with the aim of emissions reduction[17][18]

Articles and Resources

References

  1. https://web.archive.org/web/20220119162737/https://industry.eea.europa.eu/. Archived from the original on 2022-01-19. {{cite web}}: Missing or empty |title= (help)
  2. https://web.archive.org/web/20220121144439/https://www.trz.cz/articles/54/history. Archived from the original on 2022-01-21. {{cite web}}: Missing or empty |title= (help)
  3. 3.0 3.1 3.2 3.3 https://web.archive.org/web/20211121121446/https://www.trz.cz/main-page/47/intro. Archived from the original on 2021-11-21. {{cite web}}: Missing or empty |title= (help)
  4. https://web.archive.org/web/20211028214808/https://www.trz.cz/articles/72/job-seekers. Archived from the original on 2021-10-28. {{cite web}}: Missing or empty |title= (help)
  5. https://web.archive.org/web/20211207060425/https://www.steelonthenet.com/directory/steelmaking/trinecke-zelezarny.html. Archived from the original on 2021-12-07. {{cite web}}: Missing or empty |title= (help)
  6. (PDF) https://www.trz.cz/upload/1/files/EN%20ISO%2014001_A.pdf. {{cite web}}: Missing or empty |title= (help)
  7. (PDF) https://www.trz.cz/upload/1/files/EN%20ISO%2050001_A.pdf. {{cite web}}: Missing or empty |title= (help)
  8. 8.0 8.1 (PDF) https://web.archive.org/web/20211028180828/https://www.trz.cz/upload/1/files/TZ_AR_2019.pdf. Archived from the original (PDF) on 2021-10-28. {{cite web}}: Missing or empty |title= (help)
  9. 9.0 9.1 9.2 9.3 9.4 (PDF) https://web.archive.org/web/20220318115528/https://www.eurofer.eu/assets/Uploads/Map-20191113_Eurofer_SteelIndustry_Rev3-has-stainless.pdf. Archived from the original (PDF) on 2022-03-18. {{cite web}}: Missing or empty |title= (help)
  10. 10.0 10.1 10.2 10.3 10.4 10.5 https://web.archive.org/web/20211207093806/https://trz.cz/articles/81/dok445/the-blast-furnace-is-under-reconstruction-after-twenty-two-years. Archived from the original on 2021-12-07. {{cite web}}: Missing or empty |title= (help)
  11. 11.0 11.1 11.2 11.3 11.4 11.5 11.6 (PDF) https://web.archive.org/web/20220318214125/https://www.trz.cz/upload/1/files/TZ_AR_2020.pdf. Archived from the original (PDF) on 2022-03-18. {{cite web}}: Missing or empty |title= (help)
  12. 12.0 12.1 12.2 12.3 12.4 https://web.archive.org/web/20220825185936/https://www.fastmarkets.com/insights/czech-steelmaker-trinecke-zelezarny-to-upgrade-blast-furnace-to-cut-emissions. Archived from the original on 2022-08-25. {{cite web}}: Missing or empty |title= (help)
  13. (PDF) https://d9-wret.s3.us-west-2.amazonaws.com/assets/palladium/production/s3fs-public/atoms/files/myb3-2017-18_Czechia.pdf. {{cite web}}: Missing or empty |title= (help)
  14. https://web.archive.org/web/20220925050232/https://trz.cz/articles/81/dok491/trinecke-zelezarny-concluded-its-2021-financial-year. Archived from the original on 2022-09-25. {{cite web}}: Missing or empty |title= (help)
  15. 15.0 15.1 (PDF) http://www.envicomab.com/wp-content/uploads/2014/08/Lungmuss-Taphole-Clay-Brochure-Blast-Furnaces.pdf. {{cite web}}: Missing or empty |title= (help)
  16. https://www.sms-group.com/it-it/sms-newsletter-issue-012020-47/download. {{cite web}}: Missing or empty |title= (help)
  17. 17.0 17.1 https://web.archive.org/web/20230313101155/https://www.steelguru.com/steel/trinecke-zelezarny-to-cut-carbon-footprints-in-2023. Archived from the original on 2023-03-13. {{cite web}}: Missing or empty |title= (help)
  18. 18.0 18.1 https://web.archive.org/web/20230308115229/https://gmk.center/en/news/czech-trinecke-zelezarny-invests-45-2-million-in-decarbonization/. Archived from the original on 2023-03-08. {{cite web}}: Missing or empty |title= (help)

Other resources

Wikipedia also has an article on TZMS Třinecké železárny Trinec steel plant. This article may use content from the Wikipedia article under the terms of the GFDL.



Additional data

To access additional data, including an interactive map of steel power plants, a downloadable dataset, and summary data, please visit the Global Steel Plant Tracker and Global Blast Furnace Tracker on the Global Energy Monitor website.