Tangshan Delong Iron & Steel Co Ltd

From Global Energy Monitor

Tangshan Delong Iron & Steel Co., Ltd. (唐山市德龙钢铁有限公司), also known as Tangshan Hengan Industrial Co., Ltd. and Tangshan Lefeng Steel Co., Ltd., is a 2400 thousand tonnes per annum (TTPA) blast furnace (BF) and basic oxygen furnace (BOF) steel plant operating in Tangshan, Hebei, China.

Location

The map below shows the location of the steel plant in Tangshan, Hebei, China.

Loading map...
  • Location: No. 1 Linchang Lingang Road, Xiangyun Island, Leting County, Tangshan City, Hebei Province[1]
  • Coordinates (WGS 84): 39.19256, 118.899533 (exact)

Background

The existing equipment capacity has been transferred and will be phased out in 2023.[2]

On May 30, 2023, the company ceased to accept scrap steel. On the afternoon of May 31, the blast furnace and converters were successively shut down, marking the end of operations for the steel mill that had been operating in Tangshan for 23 years. Equipment dismantling is set to be completed by September 30, 2023. This move has led to the closure of the major steel factory, resulting in unemployment for 3,000 employees.[3]



Plant Details

Table 1: General Plant Details

Plant status Start date Closed date Workforce size
operating[4] 2000[4] 2023[5][6] 3243[7]

Table 2: Ownership and Parent Company Information

Parent company Parent company PermID Owner Owner company PermID
Qian'an Jiujiang Wire Co., Ltd. [51%]; British-Asia Pan Ruogen International Limited [49%][7] GEM0000177 [51%]; GEM0000285 [49%] Tangshan Delong Iron & Steel Co., Ltd.[7] GEM0000216

Table 3: Process and Products

Steel product category Steel products ISO 14001 Main production equipment Detailed production equipment
finished rolled[1] high-speed wire rod, hot rolled strip[1] yes[8] blast furnace (BF) and basic oxygen furnace (BOF)[9] 2 BOF (2x80-tonne)[9]

Table 4: Crude Steel Production Capacities (thousand tonnes per annum):

Basic oxygen furnace steelmaking capacity Nominal crude steel capacity (total)
2400 TTPA[1] 2400 TTPA

Table 5: Crude Iron Production Capacities (thousand tonnes per annum):

Blast furnace capacity Nominal iron capacity (total)
2400 TTPA[1] 2400 TTPA


Blast Furnace Details

Table 6: Blast Furnace Details:

Unit name Status Stop date Current size Current capacity
1 operating[5] September 2023[5] 1080 m³[9] 1200 TTPA[1]
2 operating[5] September 2023[5] 1080 m³[9] 1200 TTPA[1]

Articles and Resources

Additional data

To access additional data, including an interactive map of steel power plants, a downloadable dataset, and summary data, please visit the Global Steel Plant Tracker and Global Blast Furnace Tracker on the Global Energy Monitor website.

  1. 1.0 1.1 1.2 1.3 1.4 1.5 1.6 https://web.archive.org/web/20220112174033/http://www.tsdelong.com/webpage/content.html?bankuai. Archived from the original on 2022-01-12. {{cite web}}: Missing or empty |title= (help)
  2. 迁安市九江线材有限责任公司整合重组减量置换项目产能置换方案公告,河北省工业和信息化厅,December 23, 2021
  3. "全面停止生产!唐山23年的大厂宣告退出,3000员工或面临失业". 陈市观察. 2023-06-03.
  4. 4.0 4.1 http://finance.eastmoney.com/a/201912171326896353.html. {{cite web}}: Missing or empty |title= (help)
  5. 5.0 5.1 5.2 5.3 5.4 https://finance.sina.com.cn/money/future/indu/2022-09-07/doc-imqmmtha6377112.shtml. {{cite web}}: Missing or empty |title= (help)
  6. http://gxt.hebei.gov.cn/hbgyhxxht/xwzx32/tzgg83/895054/index.html. {{cite web}}: Missing or empty |title= (help)
  7. 7.0 7.1 7.2 https://www.qcc.com/firm/9811bb6ca1737e6f7bd1da2dd880f9ba.html. {{cite web}}: Missing or empty |title= (help)
  8. https://web.archive.org/web/20220319174236/http://www.tsdelong.com/webpage/honor.html. Archived from the original on 2022-03-19. {{cite web}}: Missing or empty |title= (help)
  9. 9.0 9.1 9.2 9.3 https://web.archive.org/web/20220207192044/https://finance.sina.com.cn/money/future/indu/2020-03-02/doc-iimxxstf5776330.shtml. Archived from the original on 2022-02-07. {{cite web}}: Missing or empty |title= (help)