Topas solar farm is a solar photovoltaic (PV) farm in Santiz, Salamanca, Castilla y León, Spain.

Project Details

Table 1: Phase-level project details for Topas solar farm

Phase name Status Nameplate capacity Technology Owner
1 Shelved (inferred March 2024) 54 MWp/dc[1] PV[1] Solaria Energía y Medio Ambiente SA [100%][1]
10 Shelved (inferred March 2024) 54 MWp/dc[1] PV[1] Solaria Energía y Medio Ambiente SA [100%][1]
11 Shelved (inferred March 2024) 54 MWp/dc[1] PV[1] Solaria Energía y Medio Ambiente SA [100%][1]
12 Shelved (inferred March 2024) 54 MWp/dc[1] PV[1] Solaria Energía y Medio Ambiente SA [100%][1]
2 Shelved (inferred March 2024) 54 MWp/dc[1] PV[1] Solaria Energía y Medio Ambiente SA [100%][1]
3 Shelved (inferred March 2024) 54 MWp/dc[1] PV[1] Solaria Energía y Medio Ambiente SA [100%][1]
4 Shelved (inferred March 2024) 54 MWp/dc[1] PV[1] Solaria Energía y Medio Ambiente SA [100%][1]
5 Shelved (inferred March 2024) 54 MWp/dc[1] PV[1] Solaria Energía y Medio Ambiente SA [100%][1]
6 Shelved (inferred March 2024) 54 MWp/dc[1] PV[1] Solaria Energía y Medio Ambiente SA [100%][1]
7 Shelved (inferred March 2024) 54 MWp/dc[1] PV[1] Solaria Energía y Medio Ambiente SA [100%][1]
8 Shelved (inferred March 2024) 54 MWp/dc[1] PV[1] Solaria Energía y Medio Ambiente SA [100%][1]
9 Shelved (inferred March 2024) 54 MWp/dc[1] PV[1] Solaria Energía y Medio Ambiente SA [100%][1]

Read more about Solar capacity ratings.

Location

Table 2: Phase-level location details for Topas solar farm

Phase Name Location Coordinates (WGS 84)
1 Santiz, Salamanca, Castilla y León, Spain[1] 41.2059, -5.896 (approximate)[1]
10 Santiz, Salamanca, Castilla y León, Spain[1] 41.2059, -5.896 (approximate)[1]
11 Santiz, Salamanca, Castilla y León, Spain[1] 41.2059, -5.896 (approximate)[1]
12 Santiz, Salamanca, Castilla y León, Spain[1] 41.2059, -5.896 (approximate)[1]
2 Santiz, Salamanca, Castilla y León, Spain[1] 41.2059, -5.896 (approximate)[1]
3 Santiz, Salamanca, Castilla y León, Spain[1] 41.2059, -5.896 (approximate)[1]
4 Santiz, Salamanca, Castilla y León, Spain[1] 41.2059, -5.896 (approximate)[1]
5 Santiz, Salamanca, Castilla y León, Spain[1] 41.2059, -5.896 (approximate)[1]
6 Santiz, Salamanca, Castilla y León, Spain[1] 41.2059, -5.896 (approximate)[1]
7 Santiz, Salamanca, Castilla y León, Spain[1] 41.2059, -5.896 (approximate)[1]
8 Santiz, Salamanca, Castilla y León, Spain[1] 41.2059, -5.896 (approximate)[1]
9 Santiz, Salamanca, Castilla y León, Spain[1] 41.2059, -5.896 (approximate)[1]

The map below shows the approximate locations of the solar farm phases:

Loading map...

Articles and Resources

Additional data

To access additional data, including an interactive map of global solar farms, a downloadable dataset, and summary data, please visit the Global Solar Power Tracker on the Global Energy Monitor website.

References

  1. 1.00 1.01 1.02 1.03 1.04 1.05 1.06 1.07 1.08 1.09 1.10 1.11 1.12 1.13 1.14 1.15 1.16 1.17 1.18 1.19 1.20 1.21 1.22 1.23 1.24 1.25 1.26 1.27 1.28 1.29 1.30 1.31 1.32 1.33 1.34 1.35 1.36 1.37 1.38 1.39 1.40 1.41 1.42 1.43 1.44 1.45 1.46 1.47 1.48 1.49 1.50 1.51 1.52 1.53 1.54 1.55 1.56 1.57 1.58 1.59 https://web.archive.org/web/20240201221302/https://www.pv-magazine.es/2021/07/16/lluvia-de-gigawatios-en-tramitacion-seis-empresas-suman-36-gw/. Archived from the original on 01 February 2024. {{cite web}}: Check date values in: |archive-date= (help); Missing or empty |title= (help)