Umag-Plovanija-Koper Gas Pipeline

From Global Energy Monitor
This article is part of the Global Fossil Infrastructure Tracker, a project of Global Energy Monitor.
Sub-articles:

Umag-Plovanija-Koper Gas Pipeline, also known as Umag (Kovri)-Koper pipeline, is a proposed gas pipeline in Croatia and Slovenia.[1]

Location

The pipeline would run from Umag, Croatia to Plovanija, Croatia to Koper, Slovenia.

Loading map...

Project Details

  • Operator: Plinacro Ltd
  • Owner: Plinacro Ltd
  • Parent: Plinacro Ltd
  • Current capacity: 0.59 billion cubic meters/year
  • Length: 8 km
  • Diameter: 11.8 inches / 300 mm
  • Status: Proposed
  • Start Year: 2030
  • Associated Infrastructure:

Background

The European Network of Transmission System Operators for Gas assigned this pipeline the project code "TRA-N-336". This project is also featured in the EE-NGP catalog of potential Eastern European natural gas investments in support of the Three Seas Initiative.[2]

Articles and resources

References

  1. ENTSOG TYNDP 2020 - Annex A - Projects Tables, 12 Nov 2019
  2. "Catalog of Potential Eastern European Natural Gas Investment Projects in Support of the Three Seas Initiative" (PDF). Usea. May 26th, 2021. Retrieved Jul 13th, 2022. {{cite web}}: Check date values in: |access-date= and |date= (help); line feed character in |title= at position 50 (help)CS1 maint: url-status (link)

Related GEM.wiki articles

External resources

External articles