SCM Coal Mine
From Global Energy Monitor
This article is part of the Global Coal Mine Tracker, a project of Global Energy Monitor. |
Sub-articles: |
Related-articles: |
SCM Coal Mine is an operating coal mine in South Kalimantan, Indonesia.
Location
Table 1: Project-level location details
Mine Name | Location | Coordinates (WGS 84) |
---|---|---|
SCM Coal Mine | South Kalimantan, Indonesia | -2.354545, 115.604525 (exact) |
The map below shows the exact location of the coal mine:
Project Details
Table 2: Project status
Status | Status Detail | Opening Year | Closing Year |
---|---|---|---|
Operating | – | – | – |
Table 3: Operation details
Capacity (Mtpa) | Production (Mtpa) | Year of Production | Mine Type | Mining Method | Mine Size (km2) | Mine Depth (m) | Workforce Size |
---|---|---|---|---|---|---|---|
– | 2.23[1] | 2021[1] | Surface[2] | Open Pit[2] | – | 50* | 509* |
Table 4: Coal resources and destination
Total Reserves (Mt) | Year of Total Reserves Recorded | Total Resources (Mt) | Coalfield | Coal Type | Coal Grade | Primary Consumer/ Destination |
---|---|---|---|---|---|---|
36.9[3] | 2021[4] | 64.6[5] | – | Subbituminous | Thermal | – |
Table 5: Ownership and parent company
Owner | Parent Company | Headquarters |
---|---|---|
PT Semesta Centramas[6] | Adaro Energy Indonesia [75%] | Indonesia |
Note: The above section was automatically generated and is based on data from the GEM April 2024 Global Coal Mine Tracker dataset.
Articles and Resources
Additional data
To access additional data, including an interactive map of world coal mines, a downloadable dataset, and summary data, please visit the Global Coal Mine Tracker on the Global Energy Monitor website.
References
- ↑ 1.0 1.1 https://www.petromindo.com/products/detail?id=473.
{{cite web}}
: Missing or empty|title=
(help) - ↑ 2.0 2.1 (PDF) https://adaro.com/files/news/berkas_eng/2198/AR%20BOOK%20ADARO%20ENERGY%202022%20Final.pdf.
{{cite web}}
: Missing or empty|title=
(help) - ↑ AR BOOK ADARO ENERGY 2022 Final.pdf
- ↑ AR BOOK ADARO ENERGY 2022 Final.pdf
- ↑ AR BOOK ADARO ENERGY 2022 Final.pdf
- ↑ (PDF) https://web.archive.org/web/20240125043215/https://www.adaro.com/files/news/berkas_eng/2198/AR%20BOOK%20ADARO%20ENERGY%202022%20Final.pdf. Archived from the original (PDF) on 25 January 2024.
{{cite web}}
: Missing or empty|title=
(help)