SCM Coal Mine

From Global Energy Monitor
This article is part of the
Global Coal Mine Tracker, a project of Global Energy Monitor.
Download full dataset
Report an error
Sub-articles:
Related-articles:

SCM Coal Mine is an operating coal mine in South Kalimantan, Indonesia.

Location

Table 1: Project-level location details

Mine Name Location Coordinates (WGS 84)
SCM Coal Mine South Kalimantan, Indonesia -2.354545, 115.604525 (exact)

The map below shows the exact location of the coal mine:

Loading map...

Project Details

Table 2: Project status

Status Status Detail Opening Year Closing Year
Operating

Table 3: Operation details

Note: The asterisk (*) signifies that the value is a GEM estimated figure.
Capacity (Mtpa) Production (Mtpa) Year of Production Mine Type Mining Method Mine Size (km2) Mine Depth (m) Workforce Size
2.23[1] 2021[1] Surface[2] Open Pit[2] 50* 509*

Table 4: Coal resources and destination

Total Reserves (Mt) Year of Total Reserves Recorded Total Resources (Mt) Coalfield Coal Type Coal Grade Primary Consumer/ Destination
36.9[3] 2021[4] 64.6[5] Subbituminous Thermal

Table 5: Ownership and parent company

Owner Parent Company Headquarters
PT Semesta Centramas[6] Adaro Energy Indonesia [75%] Indonesia

Note: The above section was automatically generated and is based on data from the GEM April 2024 Global Coal Mine Tracker dataset.

Articles and Resources

Additional data

To access additional data, including an interactive map of world coal mines, a downloadable dataset, and summary data, please visit the Global Coal Mine Tracker on the Global Energy Monitor website.

References

  1. 1.0 1.1 https://www.petromindo.com/products/detail?id=473. {{cite web}}: Missing or empty |title= (help)
  2. 2.0 2.1 (PDF) https://adaro.com/files/news/berkas_eng/2198/AR%20BOOK%20ADARO%20ENERGY%202022%20Final.pdf. {{cite web}}: Missing or empty |title= (help)
  3. AR BOOK ADARO ENERGY 2022 Final.pdf
  4. AR BOOK ADARO ENERGY 2022 Final.pdf
  5. AR BOOK ADARO ENERGY 2022 Final.pdf
  6. (PDF) https://web.archive.org/web/20240125043215/https://www.adaro.com/files/news/berkas_eng/2198/AR%20BOOK%20ADARO%20ENERGY%202022%20Final.pdf. Archived from the original (PDF) on 25 January 2024. {{cite web}}: Missing or empty |title= (help)