Milo solar farm
From Global Energy Monitor
This article is part of the Global Solar Power Tracker, a Global Energy Monitor project. |
Other names: BNGR Milo solar farm
Milo solar farm is an operating solar photovoltaic (PV) farm in Milo, Piscataquis County, Maine, United States.
Project Details
Table 1: Phase-level project details for Milo solar farm
Status | Commissioning year | Nameplate capacity | Technology | Owner | Operator |
---|---|---|---|---|---|
Operating[1] | 2021[1] | 20 MWac[2] | PV[2] | BNRG Renewables[3] | BNRG Renewables[2] |
Read more about Solar capacity ratings.
Location
Table 2: Phase-level location details for Milo solar farm
Location | Coordinates (WGS 84) |
---|---|
Milo, Piscataquis County, Maine, United States[4] | 45.2670, -68.9910 (exact)[2] |
The map below shows the exact location of the solar farm:
Articles and Resources
Additional data
To access additional data, including an interactive map of global solar farms, a downloadable dataset, and summary data, please visit the Global Solar Power Tracker on the Global Energy Monitor website.
References
- ↑ 1.0 1.1 https://www.newscentermaine.com/article/tech/maines-largest-solar-power-project-milo-solar-is-energized/97-2236dae2-aa23-4838-aa5a-48bab2001388.
{{cite web}}
: Missing or empty|title=
(help) - ↑ 2.0 2.1 2.2 2.3 "Preliminary Monthly Electric Generator Inventory - March". U.S. Energy Information Administration. May 24, 2022. Archived from the original on September, 28, 2022. Retrieved June 21, 2022.
{{cite web}}
: Check date values in:|archive-date=
(help) - ↑ https://www.dirigosolar.com/projects/bd-solar-1-llc-2/.
{{cite web}}
: Missing or empty|title=
(help) - ↑ "Form EIA-860 detailed data with previous form data". US Energy Information Administration. September 5, 2020. Archived from the original on July 1, 2022. Retrieved July 21, 2022.