Zhezkazgan-2 power station

From Global Energy Monitor
Part of the
Global Coal Plant Tracker,
a Global Energy Monitor project.
Download full dataset
Report an error
Related coal trackers:

Zhezkazgan-2 power station (ТЭЦ Жезказгана, Жезказганская ТЭЦ-2) is an announced power station in Kengir, Jezkazgan (Zhezkazgan), Ulytau, Kazakhstan.

Location

Table 1: Project-level location details

Plant name Location Coordinates (WGS 84)
Zhezkazgan-2 power station Kengir, Jezkazgan (Zhezkazgan), Ulytau, Kazakhstan 47.8402877, 67.6137144 (approximate)[1]

The map below shows the approximate location of the power station.

Loading map...


Project Details

Table 2: Unit-level details

Unit name Status Fuel(s) Capacity (MW) Technology Start year Retired year
Unit 1 announced coal - unknown, fossil gas - natural gas 500[2] unknown 2029[2]

Table 3: Unit-level ownership and operator details

Unit name
Unit 1

Background

The plan to build Zhezkazgan-2 power station was announced in February 2024 and confirmed in the government order on the 'Program for power sector development until 2035' released in February 2024.[3][4] Target completion date is 2029 and the plant would be built in the village of Kengir, close to Zhezkazgan city.[3]

The plant would be either coal-fired or gas-fired.[3] The government order does not specify the fuel type.[4] As of April 2024 it was assumed that the plant will be mostly coal-fired.

The plant would be built using investors' funds, not from the state budget funds.[3]

Articles and Resources

References

  1. https://vlast.kz/novosti/59023-novuu-tec-v-oblasti-ulytau-postroat-za-scet-investorov.html. {{cite web}}: Missing or empty |title= (help)
  2. 2.0 2.1 https://web.archive.org/web/20240417003056/https://www.gov.kz/memleket/entities/energo/documents/details/611688?lang=ru. Archived from the original on 17 April 2024. {{cite web}}: Missing or empty |title= (help)
  3. 3.0 3.1 3.2 3.3 "Новую ТЭЦ в области Улытау построят за счет инвесторов". vlast.kz. February 2024.{{cite web}}: CS1 maint: url-status (link)
  4. 4.0 4.1 "Приказ "Об утверждении Плана мероприятий по развитию электроэнергетической отрасли до 2035 года"" (PDF). /www.gov.kz. February 2024.{{cite web}}: CS1 maint: url-status (link)

Additional data

To access additional data, including an interactive map of coal-fired power stations, a downloadable dataset, and summary data, please visit the Global Coal Plant Tracker on the Global Energy Monitor website.