This article is part of the Global Solar Power Tracker, a Global Energy Monitor project. |
Other names: Al Shakaaya Solar II PV 3, Al-Shagaya Solar, Al-Shegaya Solar, Al Shakaaya Solar, Shagaya Renewable Energy Park Phase 1, Shagaya New, Al Shakaaya Solar II PV 2, Al-Dabdaba PV, Dibdibah PV
Al Shagaya Solar Energy Park (الشقايا للطاقات المتجددة ٢، محطة الدبدبة للطاقة الشمسية, مجمع الشقايا للطاقات المتجددة, الشقايا للطاقات المتجددة ٣) is an operating solar photovoltaic (PV) and solar thermal farm in Shagaya Renewable Energy Park, Kuwait.
Project Details
Table 1: Phase-level project details for Al Shagaya Solar Energy Park
Phase name | Status | Commissioning year | Nameplate capacity | Technology | Owner | Operator |
---|---|---|---|---|---|---|
1-CSP | Operating[1] | 2018[1] | 50 MWac[1] | Solar Thermal[1] | Kuwait Institute for Scientific Research (معهد الكويت للأبحاث العلمية)[2] | TSK[2] |
1-PV | Operating[3] | 2017[4][5] | 10 MWac[5] | PV[5] | Kuwait Institute for Scientific Research (معهد الكويت للأبحاث العلمية)[1][6] | – |
2023-02-01 00:00:00 | Pre-construction[7] | 2027 (planned)[8] | 300 MW[8][9][10][10] | PV[11] | Kuwait Authority for Partnership Projects (KAPP) (هيئة مشروعات الشراكة بين القطاعين العام والخاص)[12] | – |
2023-02-02 00:00:00 | Pre-construction[7] | – | 300 MW[9][10][10] | PV[10] | Kuwait Authority for Partnership Projects (KAPP) (هيئة مشروعات الشراكة بين القطاعين العام والخاص)[12] | – |
2023-02-03 00:00:00 | Pre-construction[7] | – | 300 MW[9][10][10] | PV[10] | Kuwait Authority for Partnership Projects (KAPP) (هيئة مشروعات الشراكة بين القطاعين العام والخاص)[12] | – |
2023-02-04 00:00:00 | Pre-construction[7] | – | 300 MW[10] | PV[10] | Kuwait Authority for Partnership Projects (KAPP) (هيئة مشروعات الشراكة بين القطاعين العام والخاص)[12] | – |
2023-02-05 00:00:00 | Pre-construction[7] | – | 300 MW[10] | PV[10] | Kuwait Authority for Partnership Projects (KAPP) (هيئة مشروعات الشراكة بين القطاعين العام والخاص)[12] | – |
3-CSP | Announced[13] | 2030 (planned)[8] | 220 MWac[14][13][15] | Solar Thermal[14][13] | Kuwait Authority for Partnership Projects (KAPP) (هيئة مشروعات الشراكة بين القطاعين العام والخاص)[10] | – |
3-PV | Announced[8] | 2030 (planned)[8] | 1200 MW[15] | PV[11] | Kuwait Authority for Partnership Projects (KAPP) (هيئة مشروعات الشراكة بين القطاعين العام والخاص)[10] | – |
More information on this solar thermal project can be found at csp.guru.
Location
Table 2: Phase-level location details for Al Shagaya Solar Energy Park
Phase Name | Location | Coordinates (WGS 84) |
---|---|---|
1-CSP | Jahra, Kuwait[16] | 29.1987, 47.0465 (exact)[16] |
1-PV | Shagaya Renewable Energy Park, Kuwait[17][18][5] | 29.2055, 47.0524 (exact)[14] |
2023-02-01 00:00:00 | Shagaya Renewable Energy Park, Kuwait[17][18] | 29.2285, 47.0624 (exact)[19] |
2023-02-02 00:00:00 | Shagaya Renewable Energy Park, Kuwait[17][18] | 29.2285, 47.0624 (exact)[19] |
2023-02-03 00:00:00 | Shagaya Renewable Energy Park, Kuwait[17][18] | 29.2285, 47.0624 (exact)[19] |
2023-02-04 00:00:00 | Shagaya Renewable Energy Park, Kuwait[17][18] | 29.2285, 47.0624 (exact)[19] |
2023-02-05 00:00:00 | Shagaya Renewable Energy Park, Kuwait[17][18] | 29.2285, 47.0624 (exact)[19] |
3-CSP | Shagaya Renewable Energy Park, Kuwait[17][18][5] | 29.2025, 47.0708 (approximate)[14] |
3-PV | Shagaya Renewable Energy Park, Kuwait[17][18][5] | 29.2025, 47.0708 (approximate)[14] |
The map below shows the locations of the solar farm phases:
Articles and Resources
Additional data
To access additional data, including an interactive map of global solar farms, a downloadable dataset, and summary data, please visit the Global Solar Power Tracker on the Global Energy Monitor website.
References
- ↑ 1.0 1.1 1.2 1.3 1.4 https://www.kisr.edu.kw/en/gi/5/details/.
{{cite web}}
: Missing or empty|title=
(help) - ↑ 2.0 2.1 Johan Lilliestam, Richard Thonig, Chuncheng Zang, Alina Gilmanova (2021). "CSP.guru". CSP guru. Archived from the original on April 6, 2022. Retrieved May 1, 2022.
{{cite web}}
: CS1 maint: multiple names: authors list (link) - ↑ https://www.kisr.edu.kw/ar/gi/3/details/.
{{cite web}}
: Missing or empty|title=
(help) - ↑ https://www.kisr.edu.kw/ar/gi/3/details/.
{{cite web}}
: Missing or empty|title=
(help) - ↑ 5.0 5.1 5.2 5.3 5.4 5.5 https://www.kisr.edu.kw/en/news/162/details/.
{{cite web}}
: Missing or empty|title=
(help) - ↑ http://arabic.news.cn/2019-02/20/c_137837535.htm.
{{cite web}}
: Missing or empty|title=
(help) - ↑ 7.0 7.1 7.2 7.3 7.4 https://energy-utilities.com/kuwait-invites-consultants-to-bid-for-major-news112410.html.
{{cite web}}
: Missing or empty|title=
(help) - ↑ 8.0 8.1 8.2 8.3 8.4 https://www.aljarida.com/ext/articles/print/1618413645249845100/.
{{cite web}}
: Missing or empty|title=
(help) - ↑ 9.0 9.1 9.2 https://www.alraimedia.com/article/1603533/%D9%85%D8%AD%D9%84%D9%8A%D8%A7%D8%AA/%D8%A3%D8%AE%D8%A8%D8%A7%D8%B1-%D9%85%D8%AD%D9%84%D9%8A%D8%A9/%D8%A7%D9%84%D8%B4%D8%B1%D8%A7%D9%83%D8%A9-%D9%88%D9%82%D8%B9%D8%AA-%D8%B9%D9%82%D8%AF%D8%A7-%D9%85%D8%B9-%D8%A7%D8%B3%D8%AA%D8%B4%D8%A7%D8%B1%D9%8A-%D8%B9%D8%A7%D9%84%D9%85%D9%8A-%D9%84%D8%A5%D8%B9%D8%AF%D8%A7%D8%AF-%D9%88%D8%AB%D8%A7%D8%A6%D9%82-%D8%A7%D9%84%D8%AF%D8%A8%D8%AF%D8%A8%D8%A9.
{{cite web}}
: Missing or empty|title=
(help) - ↑ 10.00 10.01 10.02 10.03 10.04 10.05 10.06 10.07 10.08 10.09 10.10 10.11 10.12 10.13 https://www.scpd.gov.kw/Default23.aspx?id=43.
{{cite web}}
: Missing or empty|title=
(help) - ↑ 11.0 11.1 https://web.archive.org/web/20220325212018/https://www.aljarida.com/ext/articles/print/1618413645249845100/.
{{cite web}}
: Missing or empty|title=
(help) - ↑ 12.0 12.1 12.2 12.3 12.4 https://energy-utilities.com/kuwait-to-procure-1-5gw-dibdibah-solar-scheme-as-news084229.html.
{{cite web}}
: Missing or empty|title=
(help) - ↑ 13.0 13.1 13.2 http://www.kapp.gov.kw/home/project_details/87.
{{cite web}}
: Missing or empty|title=
(help) - ↑ 14.0 14.1 14.2 14.3 14.4 https://aip.scitation.org/doi/pdf/10.1063/1.5117583.
{{cite web}}
: Missing or empty|title=
(help) - ↑ 15.0 15.1 https://www.pv-magazine.com/2021/09/13/proposals-received-for-latest-version-of-delayed-kuwaiti-gigasolar-project/.
{{cite web}}
: Missing or empty|title=
(help) - ↑ 16.0 16.1 https://goo.gl/maps/jwQnrvR2SrhgUVWm8.
{{cite web}}
: Missing or empty|title=
(help) - ↑ 17.0 17.1 17.2 17.3 17.4 17.5 17.6 17.7 https://goo.gl/maps/DqpXVEfsLVoQd94L8.
{{cite web}}
: Missing or empty|title=
(help) - ↑ 18.0 18.1 18.2 18.3 18.4 18.5 18.6 18.7 https://renewablesnow.com/news/kuwait-scraps-plans-for-15-gw-solar-project-as-covid-19-takes-toll-706406/.
{{cite web}}
: Missing or empty|title=
(help) - ↑ 19.0 19.1 19.2 19.3 19.4 https://goo.gl/maps/9Qe5qE8ZsPs1mutS7.
{{cite web}}
: Missing or empty|title=
(help)