Asap/Merah/Kido (AMK) Project is an oil and gas project in development in Indonesia.[1][2]
Location
The map below shows the approximate location of the project in Indonesia.[3]
Project Details
- Status: In development[1][2]
- Coordinates: -2.4861, 133.2282 (approximate)[3]
- Operator: Genting Oil Kasuri Pty. Ltd[4][2]
- Owner: Genting Oil Kasuri Pty. Ltd (100%)[5][2]
- Parent: Genting Berhad (100%)[6][2]
- Discovery year:
- Production start year: 2025 (expected)[7]
- Basin:
- Concession/Block: Kasuri Block[5]
- Project/Complex: Asap/Merah/Kido (AMK)
Production and Reserves
Table 1: Production and Reserves - Asap/Merah/Kido (AMK) Project
Category | Fuel Description | Reserve Classification | Quantity | Units | Data Year | Source |
---|---|---|---|---|---|---|
production | condensate | Not applicable | 0.27 | million bbl/y | 2018 | [8] |
reserves | gas | reserves | 48 138 | million m³ | 2018 | [9] |
reserves | crude oil and condensate | Remaining recoverable reserves | 6.8 | million bbl | 2023 | [7] |
reserves | gas | Remaining recoverable reserves | 47 319 | million m³ | 2023 | [7]Nick Ferris (44404). "Exclusive natural gas data reveals trillions of dollars of upcoming projects". Energy Monitor. Archived from the original on 44974. Retrieved 44974. {{cite web}} : Check date values in: |access-date= , |date= , and |archive-date= (help)
|
production design capacity | crude oil and condensate | Not applicable | 0.26 | million bbl/y | 2025 | [7] |
reserves | gas | gas initially in place | 73 623 | million m³ | 2023 | [2] |
production design capacity | gas | Not applicable | 1 757 | million m³/y | 2025 | [7] |
- million bbl = million barrels
- million m³ = million cubic meters
- million bbl/y = million barrels per year
- million m³/y = million cubic meters per year
Articles and Resources
References
- ↑ 1.0 1.1 "Oil, gas reserves found in 2018 higher than target: Official". The Jakarta Post. Archived from the original on August 31, 2021. Retrieved September 27, 2021.
- ↑ 2.0 2.1 2.2 2.3 2.4 2.5 https://www.genting.com/wp-content/uploads/2023/04/GENTING_AR22_FINAL.pdf
- ↑ 3.0 3.1 https://indonesiansupplies.com/en/projects_indonesia/asap-merah-kido-field-development-project-amk/
- ↑ Kurniawan, Roffie. "Indonesia energy ministry approves PoD of 5 blocks". Rambu Energy. Archived from the original on August 31, 2021. Retrieved September 27, 2021.
- ↑ 5.0 5.1 "www.genting.com/wp-content/uploads/2021/04/GENT-Annual-Report-2020.pdf" (PDF). Archived from the original (PDF) on August 31, 2021. Retrieved September 27, 2021.
- ↑ "Energy". Archived from the original on August 31, 2021. Retrieved September 27, 2021.
- ↑ 7.0 7.1 7.2 7.3 7.4 https://www.offshore-technology.com/marketdata/oil-gas-field-profile-asap-kido-merah-complex-conventional-gas-field-indonesia/
- ↑ "www.skkmigas.go.id/assets/skk-migas-ar-2018-english.pdf" (PDF). Archived from the original (PDF) on August 31, 2021. Retrieved September 27, 2021.
- ↑ "Indonesian Government Approves the First Phase Plan of Development for Kasuri Block - Development". www.gulfoilandgas.com. Archived from the original on August 31, 2021. Retrieved September 27, 2021.