Auras wind farm

From Global Energy Monitor
(Redirected from Auras Süd III wind farm)
This article is part of the
Global Wind Power Tracker, a Global Energy Monitor project.
Report an error

Other names: Auras Encavis

Auras wind farm is an operating wind farm in Neuhausen/Spree, Spree-Neiße, Brandenburg, Germany.

Project Details

Table 1: Phase-level project details for Auras wind farm

Status Commissioning year Nameplate capacity Type Owner Operator
Operating[1] 2022[1] 22 MW[2] Onshore[1] Encavis AG[2] UGE International[1]

Location

Table 2: Phase-level location details for Auras wind farm

Location Coordinates (WGS 84)
Neuhausen/Spree, Spree-Neiße, Brandenburg, Germany[1] 51.6494, 14.2919 (exact)[1]

The map below shows the exact location of the wind farm:

Loading map...

Articles and Resources

Additional data

To access additional data, including an interactive map of global wind farms, a downloadable dataset, and summary data, please visit the Global Wind Power Tracker on the Global Energy Monitor website.

References

  1. 1.0 1.1 1.2 1.3 1.4 1.5 Germany Federal Network Agency (February 2023). "Marktstammdatenregister (Market master data register)". Marktstammdatenregister (Market master data register). Archived from the original on January 23, 2023. Retrieved February 2023. {{cite web}}: Check date values in: |access-date= (help)
  2. 2.0 2.1 https://www.taylorwessing.com/en/insights-and-events/news/media-centre/press-releases/2022/07/taylor-wessing-advises-encavis-asset-management-ag-on-acquisition-of-german-wind-farm-auras-from-uka. {{cite web}}: Missing or empty |title= (help)