BM-C-33 Oil and Gas Project (Rio de Janeiro, Brazil)
From Global Energy Monitor
| This article is part of the Global Oil and Gas Extraction Tracker, a Global Energy Monitor project. |
| Related categories: |
BM-C-33 Oil and Gas Project is an in-development oil and gas project in Rio de Janeiro, Brazil.
The project consists of the following units:
- Pao De Acucar Oil and Gas Field (Rio de Janeiro, Brazil)
- Raia Manta Gas Field (Rio de Janeiro, Brazil)
- Raia Pintada Gas Field (Rio de Janeiro, Brazil)
Project Details
Main Data
Table 1: Project-level project details for BM-C-33 Oil and Gas Project
| Unit name | Status | Operator | Owner | Discovery year | FID1 year | Production start year | Production type |
|---|---|---|---|---|---|---|---|
| BM-C-33 | in-development[1][2] | Equinor[3] | Repsol SA [35%]; Petróleo Brasileiro SA [30%]; Equinor ASA [35%][4][4][4] | 2010[4] | 2023[5] | – | conventional[5][6] |
Production and Reserves
Table 2: Reserves of BM-C-33 Oil and Gas Project
| Fuel description | Reserves classification | Quantity | Units | Data year | Source |
|---|---|---|---|---|---|
| hydrocarbons | recoverable reserves | 1000.0 | million boe | 2023 | [3][4] |
Table 3: Production from BM-C-33 Oil and Gas Project
| Category | Fuel description | Quantity | Units | Data year | Source |
|---|---|---|---|---|---|
| production design capacity | gas | 5840.0 | million m³/y | 2028 | [4] |
| production design capacity | oil | 45.99 | million bbl/y | 2028 | [3] |
Location
Table 4: Project-level location details for BM-C-33 Oil and Gas Project
| Concession/Block | Location | Onshore/Offshore | Coordinates (WGS 84) |
|---|---|---|---|
| BM-C-33[5] | Rio de Janeiro, Brazil[7][4] | offshore[5] | -23.3356, -40.0259 (exact)[7][4] |
The map below shows the exact location of the project:
Articles and Resources
Additional Data
To access additional data, including an interactive map of oil and gas extraction sites, a downloadable dataset, and summary data, please visit the Global Oil and Gas Extraction Tracker on the Global Energy Monitor website.
References
- ↑ https://web.archive.org/web/20230512042533/https://www.nsenergybusiness.com/news/equinor-takes-fid-9bn-bm-c-33-gas-and-condensate-project-brazil/. Archived from the original on 12 May 2023.
{{cite web}}: Missing or empty|title=(help) - ↑ https://www.offshore-energy.biz/new-pipeline-milestone-for-natural-gas-project-in-brazilian-waters/.
{{cite web}}: Missing or empty|title=(help) - ↑ 3.0 3.1 3.2 https://web.archive.org/web/20240108222321/https://www.equinor.com.br/noticias/equinor-submete-declaracoes-de-comercialidade-para-dois-campos-na-area-do-bm-c-33-na-bacia-de-campos. Archived from the original on 08 January 2024.
{{cite web}}: Check date values in:|archive-date=(help); Missing or empty|title=(help) - ↑ 4.0 4.1 4.2 4.3 4.4 4.5 4.6 4.7 https://web.archive.org/web/20230922230944/https://jpt.spe.org/partners-sanction-9-billion-project-off-brazil. Archived from the original on 22 September 2023.
{{cite web}}: Missing or empty|title=(help) - ↑ 5.0 5.1 5.2 5.3 https://web.archive.org/web/20230531111754/https://www.equinor.com/news/20230508-final-investment-decision-bm-c-33-brazil. Archived from the original on 31 May 2023.
{{cite web}}: Missing or empty|title=(help) - ↑ https://web.archive.org/web/20240108222808/https://www.offshore-technology.com/marketdata/oil-gas-field-profile-pao-de-acucar-conventional-gas-field-brazil/. Archived from the original on 08 January 2024.
{{cite web}}: Check date values in:|archive-date=(help); Missing or empty|title=(help) - ↑ 7.0 7.1 (PDF) https://web.archive.org/web/20240108222102/https://www.equinor.com/news/archive/2012/02/27/downloads/PaodeAcucar_high_impact_discovery_b.pdf.pdf. Archived from the original (PDF) on 08 January 2024.
{{cite web}}: Check date values in:|archive-date=(help); Missing or empty|title=(help)
