| This article is part of the Global Solar Power Tracker, a Global Energy Monitor project. |
Other names: West Bali solar farm (Phase 2), PLTS Bali-2 solar power project, East Bali solar farm (Phase 1)
East Bali solar farm is an operating solar photovoltaic (PV) farm in Jembrana, Bali, Indonesia.
Project Details
Table 1: Phase-level project details for East Bali solar farm
| Phase name | Status | Commissioning year | Nameplate capacity | Technology | Owner |
|---|---|---|---|---|---|
| 1 | Operating[1] | 2025[1] | 25 MWp/dc[2] | PV[2] | PT Medco Power Indonesia; Solar Philippines[3] |
| 2 | Shelved (inferred July 2025) | – | 25 MWp/dc[2] | PV[2] | PT Medco Power Indonesia; Solar PPA Philippines[4] |
Read more about Solar capacity ratings.
Location
Table 2: Phase-level location details for East Bali solar farm
| Phase Name | Location | Coordinates (WGS 84) |
|---|---|---|
| 1 | Jembrana, Bali, Indonesia[5] | -8.3621, 114.6488 (approximate)[5] |
| 2 | Bali, Indonesia[6] | -8.4560, 115.2704 (approximate)[6] |
The map below shows the approximate locations of the solar farm phases:
Articles and Resources
Additional data
To access additional data, including an interactive map of global solar farms, a downloadable dataset, and summary data, please visit the Global Solar Power Tracker on the Global Energy Monitor website.
References
- ↑ 1.0 1.1 https://medcopower.co.id/project/medco-solar-bali-timur/.
{{cite web}}: Missing or empty|title=(help) - ↑ 2.0 2.1 2.2 2.3 https://web.archive.org/web/20240201112918/https://medcopower.co.id/medco-power-signs-bali-solar-pv-2x25-mwp/. Archived from the original on 2024-02-01.
{{cite web}}: Missing or empty|title=(help) - ↑ (PDF) https://assets.bbhub.io/professional/sites/24/BNEF-IESR-Scaling-Up-Solar-in-Indonesia_FINAL.pdf https://medcopower.co.id/project/medco-solar-bali-timur/, https://assets.bbhub.io/professional/sites/24/BNEF-IESR-Scaling-Up-Solar-in-Indonesia_FINAL.pdf.
{{cite web}}: Check|url=value (help); Missing or empty|title=(help) - ↑ (PDF) https://assets.bbhub.io/professional/sites/24/BNEF-IESR-Scaling-Up-Solar-in-Indonesia_FINAL.pdf https://assets.bbhub.io/professional/sites/24/BNEF-IESR-Scaling-Up-Solar-in-Indonesia_FINAL.pdf, https://assets.bbhub.io/professional/sites/24/BNEF-IESR-Scaling-Up-Solar-in-Indonesia_FINAL.pdf.
{{cite web}}: Check|url=value (help); Missing or empty|title=(help) - ↑ 5.0 5.1 https://web.archive.org/web/20220421214855/https://katadata.co.id/arnold/berita/5e9a56239554c/pln-gandeng-perusahaan-prancis-bangun-3-pembangkit-ebt.
{{cite web}}: Check|archive-url=value (help); Missing or empty|title=(help) - ↑ 6.0 6.1 (PDF) https://web.archive.org/web/20240201113017/https://assets.bbhub.io/professional/sites/24/BNEF-IESR-Scaling-Up-Solar-in-Indonesia_FINAL.pdf. Archived from the original (PDF) on 2024-02-01.
{{cite web}}: Missing or empty|title=(help)
