Baoding cogen power station (大唐保定热电厂) is an operating power station of at least 400-megawatts (MW) in 316 Guangming Road, Xinshi District, Baoding, Hebei, China with multiple units, some of which are not currently operating. It is also known as 大唐保定华源热电.
Location
Table 1: Project-level location details
Plant name | Location | Coordinates (WGS 84) |
---|---|---|
Baoding cogen power station | 316 Guangming Road, Xinshi District, Baoding, Hebei, China | 38.8761, 115.4334 (exact) |
The map below shows the exact location of the power station.
Unit-level coordinates (WGS 84):
- Unit 03: 38.876144, 115.433433
- Unit 04: 38.876144, 115.433433
- Unit 05: 38.876144, 115.433433
- Unit 07: 38.876144, 115.433433
- Unit 08: 38.876144, 115.433433
- Unit 09: 38.876144, 115.433433
- Unit 10: 38.859647, 115.405195
- Unit 11: 38.859647, 115.405195
- Unit 12: 38.859647, 115.405195
- Unit 13: 38.859647, 115.405195
Project Details
Table 2: Unit-level details
Unit name | Status | Fuel(s) | Capacity (MW) | Technology | Start year | Retired year |
---|---|---|---|---|---|---|
Unit 03 | retired | coal - anthracite | 50 MW | subcritical | 1969 | 2008 |
Unit 04 | retired | coal - anthracite | 55 MW | subcritical | 1972 | 2008 |
Unit 05 | retired | coal - anthracite | 50 MW | subcritical | 1981 | 2008 |
Unit 07 | retired | coal - anthracite | 55 MW | subcritical | 1988 | 2008 |
Unit 08 | retired | - | 125 MW | subcritical | 2003 | 2018 |
Unit 09 | retired | - | 125 MW | subcritical | 2004 | 2018 |
Unit 10 | operating | - | 200 MW | subcritical | 2008 | - |
Unit 11 | operating | - | 200 MW | subcritical | 2008 | - |
Unit 12 | construction | - | 350 MW | supercritical | - | - |
Unit 13 | construction | - | 350 MW | supercritical | - | - |
Table 3: Unit-level ownership and operator details
Unit name | Owner | Parent |
---|---|---|
Unit 03 | Datang Hebei Power Generation Co Ltd | Datang International Power Generation Co Ltd |
Unit 04 | Datang Hebei Power Generation Co Ltd | Datang International Power Generation Co Ltd |
Unit 05 | Datang Hebei Power Generation Co Ltd | Datang International Power Generation Co Ltd |
Unit 07 | Datang Hebei Power Generation Co Ltd | Datang International Power Generation Co Ltd |
Unit 08 | Datang Baoding Worldbest Thermoelectricity Co Ltd | Datang International Power Generation Co Ltd [61.00%]; Hebei Construction & Investment Group Co Ltd [29.00%]; Baoding Guokong Group Co Ltd [10.00%] |
Unit 09 | Datang Baoding Worldbest Thermoelectricity Co Ltd | Datang International Power Generation Co Ltd [61.00%]; Hebei Construction & Investment Group Co Ltd [29.00%]; Baoding Guokong Group Co Ltd [10.00%] |
Unit 10 | Datang Hebei Power Generation Co Ltd | Datang International Power Generation Co Ltd |
Unit 11 | Datang Hebei Power Generation Co Ltd | Datang International Power Generation Co Ltd |
Unit 12 | Datang Hebei Power Generation Co Ltd | Datang International Power Generation Co Ltd |
Unit 13 | Datang Hebei Power Generation Co Ltd | Datang International Power Generation Co Ltd |
Project-level coal details
- Permits: 2016-12-27, 2019-5-13, 1999-2-23
Financing
- Source of financing:
Background on Plant
Baoding cogen power station was founded in 1958. The first two units were commissioned in 1960 and units 6-7 in 1988. All seven units were retired between 2007 and 2008.[1] It is owned by China Datang.[2]
Units 8 and 9 were built in 2003. They were also called Baoding Huayuan Power Company. Units 10 and 11 were completed in 2008 and in a different location from other units. The four units, units 8-11, were all co-generating, supplying heat in the winter to the city of Baoding.[3]
Units 8 and 9 were retired in 2018 due to the bankruptcy of Baoding Huayuan Power Company after it failed to pay out billions of yuan in debt.[4]
Expansion
China Datang proposed to expand the power station by 2 x 350 MW units. One of the units (Unit 12) was permitted for construction by China's NRDC in December 2016, before its EIA was approved by the provincial environmental protection agency.[5][6] China Datang was planning to retire units 8 and 9 with a total capacity of 250 MW when the new unit was commissioned.[6]
Unit 13 was permitted for construction on May 31, 2019.[7] Units 12 and 13 were expected to be built next to units 10 and 11.
Based on a 2021 governmental document, the project may have been tasked with re-applying for approval of its energy-saving plan and coal consumption replacement plan due to the delay in entering construction. However, the company appeared to decide to move forward with building the units regardless.[8]
One article noted construction on the 2 x 350 MW expansion began in February 2022.[9] From satellite imagery, there were some signs of construction, including signs of a cooling tower and smoke stacks.
Articles and Resources
References
- ↑ 保定热电厂, Baidu Baike
- ↑ Datang Baoding Powerplant, Enipedia, accessed Sept. 2015.
- ↑ 大唐保定热电厂简介, China Datang Co, date unknown
- ↑ 河北:关于2018年煤电行业淘汰落后产能目标任务的公告 共涉及13台机组, 北极星电力网, 2018/5/14
- ↑ 核准丨大唐保定热电厂1 35万千瓦热电联产项目获核准, December 27, 2016
- ↑ 6.0 6.1 大唐保定热电厂2×350MW热电机组项目环境影响报告书的批复, 国火力发电网, 2017-3-21
- ↑ 大唐保定热电厂九期扩建项目获核准, Sina, May 13, 2019
- ↑ Archive, hbdrc.hebei.gov.cn
- ↑ 煤电建设提速,企业投资动力何来? hxny, 2022-09-14