Datang Baoding cogen power station
This article is part of the CoalSwarm coverage of China and coal |
Sub-articles: |
Datang Baoding cogen power station (大唐保定热电厂) is a 400-megawatt (MW) coal-fired co-generation power plant in Hebei Province, China.
Location
The undated satellite photo below shows the unit 1-9 of the plant in Jingxiu District, Baoding Prefecture.
The undated satellite photo below shows the unit 10 and 11 of the plant in Southern suburb of Baoding Prefecture.
Background on Plant
Datang Baoding cogen power station was founded in 1958. The first two units were commissioned in 1960 and units 6-7 in 1988. All seven units were retired between 2007 and 2008.[1] It is owned by China Datang.[2]
Unit 8 and 9 were built in 2003. They are also called Baoding Huayuan Power Company. Units 10 and 11 were completed in 2008 and in different location from other units. The four units, units 8-11, are all co-generating, supplying heat in the winter to the city of Baoding.[3]
Units 8 and 9 were retired in 2018, due to the bankruptcy of Baoding Huayuan Power Company after it failed to pay out billions of yuan in debt.[4]
Proposed expansion
China Datang has proposed expanding the power station by 2 x 350 MW units. One of the units (Unit 12) was permitted for construction by China's NRDC in December 2016, before its EIA was approved by the provincial environmental protection agency.[5][6] China Datang is planning to retire units 8 and 9 with total capacity of 250MW when the new unit is commissioned.[6]
Unit 13 was permitted for construction on May 31, 2019.[7] Unit 12 and 13 will be built next to unit 10 and 11.
Plant Details
- Sponsor: Datang Hebei Power Gen Co Ltd
- Parent company: China Datang
- Location: 316 Guangming Road, Xinshi District, Baoding Prefecture, Hebei Province, China
- Coordinates: 38.876144, 115.433433 (exact)
- Status: Operating
- Gross capacity: 400 MW (Units 10 & 11: 200 MW)
- Type: Subcritical
- In service: 2008 (Units 10 & 11)
- Coal type:
- Coal source:
- Source of financing:
Project Details of expansion
- Sponsor: Datang International Power Generation Co
- Parent company: Datang
- Location: 316 Guangming Road, Xinshi District, Baoding Prefecture, Hebei Province, China
- Coordinates: 38.876144, 115.433433 (exact)
- Status: Permitted
- Gross capacity: 700 MW (Units 12 & 13: 350 MW)
- Type: Supercritical
- In service:
- Coal type:
- Coal source:
- Source of financing:
Articles and resources
References
- ↑ "保定热电厂"Baidu Baike.
- ↑ Datang Baoding Powerplant, Enipedia, accessed Sept. 2015.
- ↑ "大唐保定热电厂简介"Chian Datang Co
- ↑ "河北:关于2018年煤电行业淘汰落后产能目标任务的公告 共涉及13台机组," 北极星电力网, 2018/5/14
- ↑ "核准丨大唐保定热电厂1 35万千瓦热电联产项目获核准," Dec 27, 2016
- ↑ 6.0 6.1 "大唐保定热电厂2×350MW热电机组项目环境影响报告书的批复"国火力发电网, 2017-3-21
- ↑ "大唐保定热电厂九期扩建项目获核准," Sina, May 13, 2019