Barethi Super Thermal Power Project

From Global Energy Monitor
(Redirected from Barethi power station)
Part of the
Global Coal Plant Tracker,
a Global Energy Monitor project.
Download full dataset
Report an error
Related coal trackers:

Barethi Super Thermal Power Project is a cancelled power station in Barethi, Rajnagar, Chhatarpur, Madhya Pradesh, India.

Location

Table 1: Project-level location details

Plant name Location Coordinates (WGS 84)
Barethi Super Thermal Power Project Barethi, Rajnagar, Chhatarpur, Madhya Pradesh, India 24.783333, 79.9 (exact)

The map below shows the exact location of the power station.

Loading map...


Unit-level coordinates (WGS 84):

  • Unit 1, Unit 2, Unit 3, Unit 4: 24.783333, 79.9

Project Details

Table 2: Unit-level details

Unit name Status Fuel(s) Capacity (MW) Technology Start year Retired year
Unit 1 cancelled coal - unknown 660 supercritical
Unit 2 cancelled coal - unknown 660 supercritical
Unit 3 cancelled coal - unknown 660 supercritical
Unit 4 cancelled coal - unknown 660 supercritical

Table 3: Unit-level ownership and operator details

Unit name Owner
Unit 1 NTPC Ltd [100.0%]
Unit 2 NTPC Ltd [100.0%]
Unit 3 NTPC Ltd [100.0%]
Unit 4 NTPC Ltd [100.0%]

Project-level coal details

  • Coal source(s): Raigarh, Chhattisgarh
  • Permit(s): Terms of Reference: 2010-09-09; Terms of Reference extension: 2014-07-25

Financing

Source of financing:

Background

The project has been proposed by NTPC. NPTC has signed a Power Purchase Agreement (PPA) to sell the power from the plant to the Madhya Pradesh State Power Trading Company.[1]

The 2010 terms of reference (ToR) for the project listed the size of the plant as 3,960 MW (6 x 660 MW); however, media reports in 2014 list the project as 2,640 MW (4 x 660 MW). According to a March 2014 report, the foundation stone for the plant was laid by Power Minister Jyotiraditya Scindia on March 3, 2014.[2]

NTPC requested an extension on its terms of reference for the 4x660 MW project in May 2014,[3] which was granted in July 2014.[4] An EIA was submitted in May 2015. Coal is planned to be supplied from coal mines at Raigarh, Chhattisgarh.[5]

In a revised May 2016 EIA, NTPC informed the MoEF&CC that Coal India had accorded in-principle approval for grant of bridge linkage for the project from South Eastern Coalfield mines in the Korba/Riagarh field and the Korea Rewa field.[6][7]

In its June 2016 meeting, the Union environment ministry's Expert Appraisal Committee (EAC) deferred giving green clearance to the project due to concerns about the effect on the Khajuraho temple (20-30 km distant) and the nearby Panna Tiger Reserve (12 km distant) and Ken Crocodile Sanctuary (20-30 km distant). The EAC sought assurance that there will be downstream water withdrawal during non-monsoon periods.[8] The review process was ongoing as of February 2017.[9]

As of January 2020 there have been no further developments, and the project appears to be deferred or abandoned.

Articles and Resources

References

Additional data

To access additional data, including an interactive map of coal-fired power stations, a downloadable dataset, and summary data, please visit the Global Coal Plant Tracker on the Global Energy Monitor website.