Beihai Bebuwan power station (广西投资集团北海发电厂) is an operating power station of at least 640-megawatts (MW) in Shitoubu, Tieshangang, Beihai, Guangxi, China with multiple units, some of which are not currently operating.

Location

Table 1: Project-level location details

Plant name Location Coordinates (WGS 84)
Beihai Bebuwan power station Shitoubu, Tieshangang, Beihai, Guangxi, China 21.5821851, 109.5816259 (exact)

The map below shows the exact location of the power station.

Loading map...


Unit-level coordinates (WGS 84):

  • Phase I Unit 1, Phase I Unit 2, Phase II Unit 3, Phase II Unit 4: 21.5821851, 109.5816259

Project Details

Table 2: Unit-level details

Unit name Status Fuel(s) Capacity (MW) Technology Start year Retired year
Phase I Unit 1 operating coal - anthracite 320 subcritical 2004
Phase I Unit 2 operating coal - anthracite 320 subcritical 2005
Phase II Unit 3 construction coal - anthracite 660 supercritical 2024
Phase II Unit 4 construction coal - anthracite 660 supercritical 2024

Table 3: Unit-level ownership and operator details

Unit name Owner
Phase I Unit 1 Guotou Beibuwan Power Generation Co Ltd [100.0%]
Phase I Unit 2 Guotou Beibuwan Power Generation Co Ltd [100.0%]
Phase II Unit 3 Guotou Beibuwan Power Generation Co Ltd [100.0%]
Phase II Unit 4 Guotou Beibuwan Power Generation Co Ltd [100.0%]

Project-level coal details

  • Permit(s): January 13, 2022

Background

The two existing coal-fired units of Beihai Bebuwan power station, totaling 640 MW, were brought online between 2004 and 2005.[1] The plant is owned by SDIC (55%), Guangxi Investment Group (27%), and National Energy Investment Group (18%).[2]

Ownership

The plant was owned by SDIC (55%), Guangxi Investment Group (27%), and National Energy Investment Group (18%). In November 2019, SDIC sold its 55% share to Guangxi Investment Group as part of SDIC's exit from coal, leaving the ownership shares as Guangxi Investment Group (82%) and National Energy Investment Group (18%).[3]

Description of Expansion

In 2012, the owners were planning to build two additional coal-fired units at this plant, with a total capacity of 1,320 MW.[4][5][6][7]

There were no further developments on the proposed units until April 2020, when the sponsor power company publicized the Environmental Impact Assessment report and the Social Stability Risk Report for public opinions, indicating the revival of the project.[8] [9]

The plant was permitted in January 2022[10] and began construction soon after according to May 2022 reporting.[11] Various construction biddings were reported.[12][13][14][15] Construction was undergoing. The generator stator of unit 4 was installed on 20 July 2023.[16]

Plant Details for Existing Phase I

  • Sponsor: Beibuwan Electric Power Co.
  • Parent company: Guangxi Investment Group (82%), National Energy Investment Group (18%)
  • Location: Shitoubu, Tieshangang District, Beihai Prefecture, Guangxi Zhuang Autonomous Region, China
  • Coordinates: 21.5821851, 109.5816259 (exact)
  • Status: Operating
  • Gross capacity: 640 MW (Units 1 & 2: 320 MW)
  • Type: Subcritical
  • Start year: 2004-05
  • Coal type:
  • Coal source:
  • Source of financing:

Articles and Resources

References

  1. "国投北部湾发电公司北海电厂一期工程竣工庆典隆重举行," SDIC, 2005-4-20
  2. "Coal-Fired Plants in China - Guangxi," Power plants around the world, accessed November 2014
  3. "国投电力关于挂牌转让部分子公司股权的进展公告," ifeng, 2019-11-13
  4. "北海电厂二期(2×660MW机组)扩建工程水资源论证报告》顺利通过水利部珠江水利委员会审查" accessed June 2013
  5. "《北海电厂二期(2×660MW机组)扩建工程水资源论证报告》顺利通过水利部珠江水利委员会审查",国投北部湾发电有限公司, 2012-05-23
  6. "北海电厂二期扩建工程可行性研究报告审查会成功召开(图)",国投北部湾发电有限公司, September 7, 2005
  7. Ailun Yang and Yiyun Cui, "Global Coal Risk Assessment: Data Analysis and Market Research," World Resources Institute working paper, November 2012
  8. "广西投资集团北海发电二期(2×660MW)扩建工程环境影响评价一次公示 文章来源: 广西投资集团北海发电有限公司, 2020-04-08
  9. 广西投资集团北海发电有限公司二期(2×660MW)扩建工程社会稳定风险征询意见的公告文章来源:浙江经纬工程项目管理有限公司. 2020-04-17
  10. 正式核准!北海电厂二期(2×660MW)扩建工程!, BJX, 2022-01-13
  11. 广投北海电厂二期扩建工程项目顺利推进 - 自治区北部湾办, gxzf.gov, May 18, 2022
  12. "疯狂煤电!14x1000MW!国家能源集团7家百万千瓦级燃煤电厂25项招标!". 能源电力新观察. 2023-05-25. Retrieved 2023-9-5. {{cite web}}: Check date values in: |access-date= (help)CS1 maint: url-status (link)
  13. "【招标】火电|5个2×1000MW!国家能源集团火电工程相关12项招标". 能源电力新观察. 2023-07-05. Retrieved 2023-9-5. {{cite web}}: Check date values in: |access-date= (help)CS1 maint: url-status (link)
  14. "【开标】火电|4x1000MW!煤电工程12项招标,谁中了?". 能源电力新观察. 2023-07-25. Retrieved 2023-9-5. {{cite web}}: Check date values in: |access-date= (help)CS1 maint: url-status (link)
  15. "国能北海电厂二期2×1000MW扩建工程海水脱硫EPC招标". 北极星电力网. 2023-07-18. Retrieved 2023-9-7. {{cite web}}: Check date values in: |access-date= (help)CS1 maint: url-status (link)
  16. "2×660MW!广投北海二期扩建工程4号机组定子就位!". 能源电力新观察. 2023-07-26. Retrieved 2023-9-7. {{cite web}}: Check date values in: |access-date= (help)CS1 maint: url-status (link)