Beijing Jingneng Guangdong Dongyuan Gas power station

From Global Energy Monitor
Part of the
Global Oil and Gas Plant Tracker,
a Global Energy Monitor project.
Download full dataset
Report an error
Related categories:

Beijing Jingneng Guangdong Dongyuan Gas power station (广东京能东源热电联产, 河源市东源县天然气热电联产项目, 东源天然气热电联产电站项目, 京能4×400MW级燃气热电联产项目) is a power station in pre-construction in Xiantang Town, Heyuan County, Guangdong, China.

Location

Table 1: Project-level location details

Plant name Location Coordinates (WGS 84)
Beijing Jingneng Guangdong Dongyuan Gas power station Xiantang Town, Heyuan County, Guangdong, China 23.837652, 114.770794 (approximate)[1]
Loading map...


Project Details

Table 2: Unit-level details

Unit name Status Fuel(s) Capacity (MW) Technology CHP
1-1 Pre-construction[2][3] fossil gas: natural gas[4][5][6][1] 400[6] combined cycle[6] yes[6]
1-2 Pre-construction[2][3] fossil gas: natural gas[4][5][6][1] 400[6] combined cycle[6] yes[6]
2-1 Pre-construction[2][3] fossil gas: natural gas[5][6][1] 400[6] combined cycle[6] yes[6]
2-2 Pre-construction[2][3] fossil gas: natural gas[5][6][1] 400[6] combined cycle[6] yes[6]

CHP is an abbreviation for Combined Heat and Power. It is a technology that produces electricity and thermal energy at high efficiencies. Coal units track this information in the Captive Use section when known.

Table 3: Unit-level ownership and operator details

Unit name Owner Parent
1-1 Beijing Energy Clean Energy and Power Shareholding Huanan Branch Co Ltd [100%][6] Beijing Energy Clean Energy and Power Shareholding Huanan Branch Co Ltd [100.0%]
1-2 Beijing Energy Clean Energy and Power Shareholding Huanan Branch Co Ltd [100%][6] Beijing Energy Clean Energy and Power Shareholding Huanan Branch Co Ltd [100.0%]
2-1 Beijing Energy Clean Energy and Power Shareholding Huanan Branch Co Ltd [100%][6] Beijing Energy Clean Energy and Power Shareholding Huanan Branch Co Ltd [100.0%]
2-2 Beijing Energy Clean Energy and Power Shareholding Huanan Branch Co Ltd [100%][6] Beijing Energy Clean Energy and Power Shareholding Huanan Branch Co Ltd [100.0%]

Ownership Tree

This ownership tree is part of the Global Energy Ownership Tracker, a project of Global Energy Monitor.

Background

Unit 1 and Unit 2 are scheduled to commence construction in March 2024 and achieve production by the end of 2025.[7]

Articles and Resources

References

  1. 1.0 1.1 1.2 1.3 1.4 https://www.sohu.com/a/716174422_121123763. {{cite web}}: Missing or empty |title= (help)
  2. 2.0 2.1 2.2 2.3 https://static.nfnews.com/content/202405/21/c8893341.html?enterColumnId=2556. {{cite web}}: Missing or empty |title= (help)
  3. 3.0 3.1 3.2 3.3 https://m.chu21.com/html/chunengy-44800.shtml. {{cite web}}: Missing or empty |title= (help)
  4. 4.0 4.1 "2024年省重点建设项目,涉及河源的有这些_腾讯新闻". new.qq.com. 2024-01-25. Archived from the original on 2024-05-08. Retrieved 2024-04-26.
  5. 5.0 5.1 5.2 5.3 http://www.gddongyuan.gov.cn/hdjl/fkyj/content/post_565344.html. {{cite web}}: Missing or empty |title= (help)
  6. 6.00 6.01 6.02 6.03 6.04 6.05 6.06 6.07 6.08 6.09 6.10 6.11 6.12 6.13 6.14 6.15 6.16 6.17 6.18 6.19 https://www.beipa.org.cn/newsinfo/4477265.html. {{cite web}}: Missing or empty |title= (help)
  7. "总投资超30亿,明年3年动工!广东京能东源2×400MW(9F改进型)热电联产工程选址东源县仙塘镇热水村". 2023-08-30. Retrieved 2023-10-18.{{cite web}}: CS1 maint: url-status (link)