Branston Solar Park Extension

From Global Energy Monitor
This article is part of the Global Solar Power Tracker, a Global Energy Monitor project.

Branston Solar Park Extension is a solar farm under construction in North Kesteven, Lincolnshire, East Midlands, England, United Kingdom.


Project Details

The solar farm has one phase that is at least 20 MW. (Read more about solar capacity ratings.)

Table 1: Phase-level project details for Branston Solar Park Extension

Status Commissioning year Nameplate capacity Owner
Construction[1] 2020[2] 40 MWp/dc[1] Ethical Power[1]

Location

Table 2: Phase-level location details for Branston Solar Park Extension

Location Coordinates (WGS 84)
North Kesteven, Lincolnshire, East Midlands, England, United Kingdom[1] 53.1837, -0.4658 (exact)[1]

The map below shows the exact location of the solar farm:

Loading map...

Background

Articles and Resources

Additional data

To access additional data, including an interactive map of global solar farms, a downloadable dataset, and summary data, please visit the Global Solar Power Tracker on the Global Energy Monitor website.

References

  1. 1.0 1.1 1.2 1.3 1.4 "Renewable Energy Planning Database". United Kingdom Government. March, 2021. Retrieved May 24, 2021. Check date values in: |date= (help)
  2. "Ethical Power Connections Have Commenced Works On The 132Kv, 50Mw Capacity Solar Park Branston". Ethical Power. September 17, 2019. Archived from the original on October 15, 2021. Retrieved December 14, 2021.