Cordoba–Campo Major Pipeline

From Global Energy Monitor
Part of the
Global Gas Infrastructure Tracker,
a Global Energy Monitor project.
Download full dataset
Report an error

Córdoba–Campo Major Pipeline, also known as Extremadura pipeline, is a gas pipeline between Spain and Portugal.[1]

Location

The pipeline runs from Córdoba to Campo Major, Portugal.[2][3][4]

Loading map...

Pipeline Details

  • Operator: Enagás, S.A.
  • Owner: Enagás, S.A.
  • Parent Company: Enagás, S.A.
  • Capacity: 6.1 bcm/year[5]
  • Length: 251 km[6]
  • Diameter: 28, 32 inches[7]
  • Status: Operating
  • Start Year:

Identifiers

The SciGRID_gas combined IGG gas transmission network data set refers to the pipeline as INET_PL_7, INET_PL_127, INET_PL_1293.[2]

Articles and resources

References

  1. ↑ "Cordoba - Campo Major Pipeline," Enipedia. (Retrieved from Internet archive)
  2. ↑ 2.0 2.1 Diettrich, Pluta, Medrjoubi (July 23, 2020). "The combined IGG gas transmission network data set". DLR Institute for Networked Energy Systems. {{cite journal}}: Cite journal requires |journal= (help)CS1 maint: multiple names: authors list (link)
  3. ↑ European Network of Transmission System Operators for Gas (October 2020). "TYNDP 2020 - MAP – Transmission" (PDF). ENTSOG. Retrieved December 4, 2020.{{cite web}}: CS1 maint: url-status (link)
  4. ↑ Enagas (May, 2022). "2021 Spanish Gas System Report" (PDF). Enagas. Retrieved Aug 4th, 2022. {{cite web}}: Check date values in: |access-date= and |date= (help)CS1 maint: url-status (link)
  5. ↑ "Natural gas - Supply and trading | Galp". www.galp.com. Retrieved 2020-01-15.
  6. ↑ Enagás. "Gas Pipelines - Energy Infrastructure - Enagás". www.enagas.es. Retrieved 2022-08-04.
  7. ↑ "United Kingdom and Ireland Pipelines map - Crude Oil (petroleum) pipelines - Natural Gas pipelines - Products pipelines". The Odora. Retrieved 30 January 2020.{{cite web}}: CS1 maint: url-status (link)

Related GEM.wiki articles

External resources

External articles