Huaneng Songyuan Cogen power station
| Part of the Global Coal Plant Tracker, a Global Energy Monitor project. |
| Related coal trackers: |
Huaneng Songyuan Cogen power station (华能松原热电厂) is an operating power station of at least 150-megawatts (MW) in Ningjiang, Songyuan, Jilin, China. It is also known as CNPC Jilin power station, 中石油吉林油田热电厂.
Location
Table 1: Project-level location details
| Plant name | Location | Coordinates (WGS 84) |
|---|---|---|
| Huaneng Songyuan Cogen power station | Ningjiang, Songyuan, Jilin, China | 45.14332, 124.787718 (exact) |
Unit-level coordinates (WGS 84):
- Unit 1, Unit 2, Unit 3: 45.14332, 124.787718
Project Details
Table 2: Unit-level details
| Unit name | Status | Fuel(s) | Capacity (MW) | Technology | CHP | Start year | Emergency/Backup |
|---|---|---|---|---|---|---|---|
| Unit 1 | Operating | coal: bituminous[1] | 50 | subcritical | yes | 2000 | False |
| Unit 2 | Operating | coal: bituminous[1] | 50 | subcritical | yes | 2001 | False |
| Unit 3 | Operating | coal: bituminous[1] | 50 | subcritical | yes | 2007 | False |
Table 3: Unit-level ownership and operator details
| Unit name | Owner | Parent |
|---|---|---|
| Unit 1 | Huaneng Songyuan Thermal Power Co Ltd [100%] | China Huaneng Group Co Ltd [100.0%] |
| Unit 2 | Huaneng Songyuan Thermal Power Co Ltd [100%] | China Huaneng Group Co Ltd [100.0%] |
| Unit 3 | Huaneng Songyuan Thermal Power Co Ltd [100%] | China Huaneng Group Co Ltd [100.0%] |
Project-level coal details
- Coal source(s): domestic
Ownership Tree
This ownership tree is part of the Global Energy Ownership Tracker, a project of Global Energy Monitor.
Background
The coal plant consists of 3 x 50 MW coal-fired units that began operating in 2000-2007. It was owned by the China National Petroleum Corporation (CNPC) Jilin Oil Field Company and provided electricity and power to the Jilin Oilfield.[2] [3] It was fined by National Environmental Protection Ministry for its abnormal operation of its desulfurization and denitrification facilities.[3] The plant was shut down in 2016.[4][5]
Ownership shift
In 2018, the coal plant was acquired by China Huaneng and the name changed to Huaneng Songyuan Cogen power station (华能松原热电厂).[6] The coal plant restarted operations to supply heating to the surrounding area in the winter season.[7] Huaneng Jilin Power plans to invest 67 million RMB into adjustments and improvements for the current three units after the 2020-2021 heating season is over.[8]
Carbon accounting
In 2019, Huaneng Jilin Power Generation opened a bid for the carbon emission accounting of the plant; Huaneng Carbon Assets won the bid for 296,000 RMB.[9]
Articles and Resources
References
- ↑ 1.0 1.1 1.2 https://www.gem.wiki/Coal_source_methodology_for_the_Global_Coal_Plant_Tracker.
{{cite web}}: Missing or empty|title=(help) - ↑ "良好审核案例——吉林石油集团有限责任公司热电厂," 北京三星九千认证中心, 2013-06-20
- ↑ 3.0 3.1 "关于对2014年脱硫脱硝设施存在突出问题企业予以处罚的公告" MEPC, 2015-6-22
- ↑ "吉林:挖潜增效开拓电力市场 超前布局省内增量售电市场," 北极星售电网, 2016/5/6
- ↑ "吉林电力关停自备电厂推动清洁替代," 中国储能网新闻中心, 2016-5-12
- ↑ "华能松原热电有限公司召开2020-2021供暖季新闻发布会_澎湃新闻-The Paper". www.thepaper.cn. 2020-10-19. Retrieved 2021-06-08.
{{cite web}}: CS1 maint: url-status (link) - ↑ "华能松原热电有限公司召开2020-2021供暖季新闻发布会_供热". Sohu. 2020-10-19. Retrieved 2021-05-28.
{{cite web}}: CS1 maint: url-status (link) - ↑ "华能松原热电有限公司召开2020-2021供暖季新闻发布会". The Paper. October 19, 2020. Retrieved May 28, 2021.
{{cite web}}: CS1 maint: url-status (link) - ↑ "华能碳资产中标华能松原热电有限公司碳排放核算及碳交易咨询服务项目". Idea Carbon. August 13, 2019. Retrieved May 28, 2021.
{{cite web}}: CS1 maint: url-status (link)
Additional data
To access additional data, including an interactive map of coal-fired power stations, a downloadable dataset, and summary data, please visit the Global Coal Plant Tracker on the Global Energy Monitor website.
