Shangqiu Minsheng power station (中电国际商丘民生热电厂) is an operating power station of at least 700-megawatts (MW) in Yangguanmiao Village, Liangyuan District, Shangqiu, Henan, China.

Location

Table 1: Project-level location details

Plant name Location Coordinates (WGS 84)
Shangqiu Minsheng power station Yangguanmiao Village, Liangyuan District, Shangqiu, Henan, China 34.469434, 115.707177 (exact)

The map below shows the exact location of the power station.

Loading map...


Unit-level coordinates (WGS 84):

  • Unit 1, Unit 2: 34.469434, 115.707177

Project Details

Table 2: Unit-level details

Unit name Status Fuel(s) Capacity (MW) Technology Start year Retired year
Unit 1 operating coal - unknown 350 supercritical 2018
Unit 2 operating coal - unknown 350 supercritical 2019

Table 3: Unit-level ownership and operator details

Unit name Owner
Unit 1 Shangqiu Minsheng Thermal Power Co Ltd [100.0%]
Unit 2 Shangqiu Minsheng Thermal Power Co Ltd [100.0%]

Project-level coal details

  • Permit(s): November 27, 2015

Background

China Power International has proposed the 2 x 350MW Minsheng coal plant in Yangguanmiao Village, Liangyuan District. The project was permitted in 2015.[1]

As of 2016 the power station is under construction.[2]

Unit 1 was commissioned in November 2018.[3] Unit 2 was commissioned in January 2019.[4]

Ownership

In July 2015, China Power Investment Corporation (CPI) and State Nuclear Power Technology Corporation (SNPTC) merged to become State Power Investment Corporation (国家电力投资集团), one of the five largest state-owned electricity producers in the People's Republic of China.[5]

Articles and Resources

References

  1. "商丘民生2×350兆瓦“上大压小”热电工程获得河南省发改委的核准批复," 中国火力发电网 , 2015-12-11
  2. "中电投商丘民生热电办公临建施工招标," 中国招投标网, 2016-04-14
  3. "中国能建安徽电建一公司承建商丘热电1号机组投运," 安徽电建一公司, 2018-11-27
  4. "国家电投中电商丘热电2号机组通过168小时满负荷试运行," BJX, January 24, 2019
  5. "Chinese nuclear giant officially launched". World Nuclear Association. 16 July 2015. Retrieved 4 May 2015.

Additional data

To access additional data, including an interactive map of coal-fired power stations, a downloadable dataset, and summary data, please visit the Global Coal Plant Tracker on the Global Energy Monitor website.