Zhongwei power station (宁夏腾格里中卫电厂, 中卫热电厂) is an operating power station of at least 2020-megawatts (MW) in Shapotou, Zhongwei, Wuzhong, Ningxia, China with multiple units, some of which are not currently operating. It is also known as 国家电投宁夏能源铝业中卫热电; 国能中卫热电 (Unit 1 & 2), 宁夏中卫电厂扩建工程 (Expansion Unit 1-4).

Location

Table 1: Project-level location details

Plant name Location Coordinates (WGS 84)
Zhongwei power station Shapotou, Zhongwei, Wuzhong, Ningxia, China 37.622562, 105.235214 (exact)[1]
Loading map...

Unit-level coordinates (WGS 84):

  • Unit 1, Unit 2, Unit 3, Unit 4, Unit 5, Unit 6: 37.622562, 105.235214

Project Details

Table 2: Unit-level details

Unit name Status Fuel(s) Capacity (MW) Technology CHP Start year Emergency/Backup
Unit 1 Operating coal: unknown[2] 350 supercritical yes 2016 False
Unit 2 Operating coal: unknown[2] 350 supercritical yes 2016 False
Unit 3 Construction[3] coal: unknown[2][4] 660[1] ultra-supercritical[1] yes[5] 2025 (planned)[3] False
Unit 4 Operating[3][6] coal: unknown[2][4] 660[1] ultra-supercritical[1] yes[5] 2026[3][6] False
Unit 5 Operating[3][7] coal: unknown[2][4] 660[4] ultra-supercritical[1] yes[5] 2026[8][7] False
Unit 6 Construction[3] coal: unknown[2][4] 660[4] ultra-supercritical[1] yes[5] – False

Table 3: Unit-level ownership and operator details

Unit name Owner Parent
Unit 1 Guoneng Zhongwei Thermal Power Co Ltd [100%] China Energy Investment Corp [76.0%]; Ningxia State-owned Investment Management Co Ltd [24.0%]
Unit 2 Guoneng Zhongwei Thermal Power Co Ltd [100%] China Energy Investment Corp [76.0%]; Ningxia State-owned Investment Management Co Ltd [24.0%]
Unit 3 Guoneng Zhongwei Thermal Power Co Ltd [100%] China Energy Investment Corp [76.0%]; Ningxia State-owned Investment Management Co Ltd [24.0%]
Unit 4 Guoneng Zhongwei Thermal Power Co Ltd [100%] China Energy Investment Corp [76.0%]; Ningxia State-owned Investment Management Co Ltd [24.0%]
Unit 5 Guoneng Zhongwei Thermal Power Co Ltd [100%] China Energy Investment Corp [76.0%]; Ningxia State-owned Investment Management Co Ltd [24.0%]
Unit 6 Guoneng Zhongwei Thermal Power Co Ltd [100%] China Energy Investment Corp [76.0%]; Ningxia State-owned Investment Management Co Ltd [24.0%]

Project-level captive use details

  • Captive industry use (heat or power): both
  • Captive industry: Aluminum


Project-level coal details

  • Coal source(s): domestic

Ownership Tree

This ownership tree is part of the Global Energy Ownership Tracker, a project of Global Energy Monitor.

Background on Project

Zhongwei power station is a two-unit coal-fired power plant with a total capacity of 700 MW in Ningxia Hui Autonomous Region. It was sponsored by CPI and Ningxia Power Investment Group and scheduled to be completed in 2015,[9]. The power station was commissioned in 2016.[10]

Expansion

A 4 x 660 MW expansion project was listed in Ningxia's 14th Five-Year-Plan for the energy sector.[11] By September 2022, the project had already began the process to obtain a permit per bidding ads.[12][13] On 8 February 2023, the Development and Reform Commission of Ningxia Autonomous Region issued a document regarding the preliminary work of the expansion project, which regarded by Chinese media as a pass for permit.[14]

Unit 3 was on the Ningxia key projects list in 2023[15]. Construction ceremony of the project was held on 24 August 2023.[16][17] But bidding for project survey and design was only called in July 2023.[18] The EIA report was submitted in November 2023[19].

In 2024, tenders for air-cooled equipment, denitrification systems, and main construction were issued[20][21]. The first concrete was poured in April[22], and boiler steel hoisting for Unit 4 began in June[23].

In 2025, more tenders were issued[24], the boiler beam was hoisted in April[25], and the chimney outer cylinder was capped in June[26]. In 2026, the generator rotor was inserted in January[27], the boiler hydraulic test passed in March[28], and the unit ignited in July[29].

Unit 4 had boiler beam hoisting begin in December 2024[30]. In 2025, the main transformer was installed in August[31], and boiler acid wash and flushing were completed in November–December[32][33].

In January 2026, the unit was connected to the grid[34] and passed the 168-hour trial on January 29[35].

Unit 5 had boiler steel hoisting begin in June 2024[36].

In 2025, the generator stator was hoisted in July[37], the turbine cover was completed in October[38], and the boiler hydraulic test passed in September[39]. In December 2025, flushing was completed[40].

In March 2026, the unit was connected to the grid[41] and passed the 168-hour trial in April[42].

Unit 6 had boiler steel hoisting begin in October 2024[43].

In 2025, the boiler beam was hoisted in April[44], and the chimney steel liner was installed in October[45]. In November 2025, the generator stator was hoisted[46].

In 2026, the boiler hydraulic test passed in April[47], the plant power system was energized in May[48], and the turbine cover was completed in June[49].

Ownership

In July 2015, China Power Investment Corporation (CPI) and State Nuclear Power Technology Corporation (SNPTC) merged to become State Power Investment Corporation (国家电力投资集团), one of the five largest state-owned electricity producers in the People's Republic of China.[50]

On May 2020, State-owned Assets Supervision and Administration Commission began a pilot project in which five central government owned power enterprises reallocated their coal power assets in five northwest provinces and autonomous regions, resulting in each province or autonomous region has only one central government owned power company presented. Namely, China Huaneng presents in Gansu; China Datang presents in Shaanxi; China Huadian in Xinjiang; State Power Investment Corporation in Qinghai, and National Energy Group in Ningxia. 40 coal power stations in the 5 provinces or autonomous regions have shifted their ownership accordingly since then. [51]

In February 2021, the ownership of Zhongwei power station shifted to National Energy Investment Group Co., Ltd.[51][52]

Articles and Resources

References

  1. ↑ 1.0 1.1 1.2 1.3 1.4 1.5 1.6 http://www.nxzw.gov.cn/xwzx/tzgg/202212/t20221229_3899361.html. {{cite web}}: Missing or empty |title= (help)
  2. ↑ 2.0 2.1 2.2 2.3 2.4 2.5 https://www.gem.wiki/Coal_source_methodology_for_the_Global_Coal_Plant_Tracker. {{cite web}}: Missing or empty |title= (help)
  3. ↑ 3.0 3.1 3.2 3.3 3.4 3.5 "全国首批"沙戈荒"风光基地调峰电源主厂房首仓混凝土成功浇筑". nx.people.com.cn. 2024-04-26. Archived from the original on 2024-05-28. Retrieved 2024-05-24.
  4. ↑ 4.0 4.1 4.2 4.3 4.4 4.5 "国能中卫热电4×66万千瓦机组扩建项目获路条-北极星电力新闻网". m.bjx.com.cn. 2023-02-17. Archived from the original on 2024-01-25. Retrieved 2023-11-20.
  5. ↑ 5.0 5.1 5.2 5.3 (PDF) https://sthjt.nx.gov.cn/zwgk/hjpj_63348/hjyxpjsl/202311/P020231120341393772534.pdf. {{cite web}}: Missing or empty |title= (help)
  6. ↑ 6.0 6.1 https://news.bjx.com.cn/html/20260210/1483749.shtml. {{cite web}}: Missing or empty |title= (help)
  7. ↑ 7.0 7.1 https://news.bjx.com.cn/html/20260417/1492381.shtml. {{cite web}}: Missing or empty |title= (help)
  8. ↑ http://www.cepca.org.cn/news/show-35134.html. {{cite web}}: Missing or empty |title= (help)
  9. ↑ "中卫项目浇筑第一罐混凝土," 中卫项目部 张青海, 2014-04-22
  10. ↑ "热电联产之星:中电投宁夏青铜峡能源铝业集团," 中卫新闻网, 2016-08-20
  11. ↑ "自治区人民政府办公厅关于印发宁夏回族自治区能源发展“十四五”规划的通知," Ningxia, 2022-09-13
  12. ↑ "宁夏电力公司中卫热电国能宁夏中卫电厂4×660MW机组扩建工程环境影响评价服务项目询价公告," 电力资讯网, 2022-09-20
  13. ↑ "宁夏电力公司中卫热电4×660MW机组扩建工程可行性研究服务项目询价采购项目采购," biaozhaozhao, 2022-09-23
  14. ↑ 宁夏电力公司 冯威 (2023-02-17). "国能中卫热电4×66万千瓦机组扩建项目获路条". 北极星火力发电网. Retrieved 2023-9-7. {{cite web}}: Check date values in: |access-date= (help)CS1 maint: url-status (link)
  15. ↑ "宁夏2023年重点项目名单". 北极星电力网. 2023-05-11. Retrieved 2026-07-29.{{cite web}}: CS1 maint: url-status (link)
  16. ↑ 杨雪 (2023-08-29). "国能宁夏中卫电厂4×660兆瓦机组扩建工程开工!". 北极星电力网. Retrieved 2023-9-7. {{cite web}}: Check date values in: |access-date= (help)CS1 maint: url-status (link)
  17. ↑ 中卫发布 (2023-08-29). "国能宁夏中卫电厂4×660兆瓦机组扩建工程开工". 火电之声. Retrieved 2023-9-7. {{cite web}}: Check date values in: |access-date= (help)CS1 maint: url-status (link)
  18. ↑ "国家能源集团中卫电厂4×660MW机组扩建工程勘察设计招标". 北极星电力网. 2023-07-07. Retrieved 20239-9-7. {{cite web}}: Check date values in: |access-date= (help)CS1 maint: url-status (link)
  19. ↑ "中卫电厂4×660MW扩建EIA受理公示". 宁夏生态环境厅. 2023-11-20. Retrieved 2026-07-29.{{cite web}}: CS1 maint: url-status (link)
  20. ↑ "中卫电厂4×660MW扩建直接空冷设备采购招标". 微信公众平台. 2024-02-22. Retrieved 2026-07-29.{{cite web}}: CS1 maint: url-status (link)
  21. ↑ "中卫电厂脱硝系统EP项目中标". 北极星电力网. 2024-03-12. Retrieved 2026-07-29.{{cite web}}: CS1 maint: url-status (link)
  22. ↑ "中卫电厂4×660MW扩建第一罐混凝土浇筑". 微信公众平台. 2024-04-26. Retrieved 2026-07-29.{{cite web}}: CS1 maint: url-status (link)
  23. ↑ "中卫电厂4号机组锅炉首根钢架吊装". 微信公众平台. 2024-07-04. Retrieved 2026-07-29.{{cite web}}: CS1 maint: url-status (link)
  24. ↑ "中卫电厂3号脱硫吸收塔提前到顶". 北极星电力网. 2025-04-08. Retrieved 2026-07-29.{{cite web}}: CS1 maint: url-status (link)
  25. ↑ "中卫电厂3号锅炉首根大板梁就位". 微信公众平台. 2025-04-16. Retrieved 2026-07-29.{{cite web}}: CS1 maint: url-status (link)
  26. ↑ "中卫电厂烟囱外筒壁结顶". 微信公众平台. 2025-06-06. Retrieved 2026-07-29.{{cite web}}: CS1 maint: url-status (link)
  27. ↑ "中卫电厂3号发电机转子穿装完成". 微信公众平台. 2026-02-26. Retrieved 2026-07-29.{{cite web}}: CS1 maint: url-status (link)
  28. ↑ "中卫电厂3号锅炉水压试验一次成功". 微信公众平台. 2026-04-02. Retrieved 2026-07-29.{{cite web}}: CS1 maint: url-status (link)
  29. ↑ "中卫公司3号机组锅炉点火一次成功". 微信公众平台. 2026-07-10. Retrieved 2026-07-29.{{cite web}}: CS1 maint: url-status (link)
  30. ↑ "中卫电厂4号锅炉大板梁吊装启动". 北极星电力网. 2024-12-11. Retrieved 2026-07-29.{{cite web}}: CS1 maint: url-status (link)
  31. ↑ "中卫电厂4号机组主变压器落位". 北极星电力网. 2025-09-02. Retrieved 2026-07-29.{{cite web}}: CS1 maint: url-status (link)
  32. ↑ "中卫电厂4号机组锅炉酸洗完成". 微信公众平台. 2025-12-09. Retrieved 2026-07-29.{{cite web}}: CS1 maint: url-status (link)
  33. ↑ "中卫电厂4号机组大机吹管完成". 微信公众平台. 2025-12-09. Retrieved 2026-07-29.{{cite web}}: CS1 maint: url-status (link)
  34. ↑ "中卫电厂4号机组首次并网成功". 北极星电力网. 2026-01-09. Retrieved 2026-07-29.{{cite web}}: CS1 maint: url-status (link)
  35. ↑ "中卫电厂4号机组通过168小时试运行". 微信公众平台. 2026-03-06. Retrieved 2026-07-29.{{cite web}}: CS1 maint: url-status (link)
  36. ↑ "中卫电厂5号锅炉钢架开始吊装". 微信公众平台. 2024-07-10. Retrieved 2026-07-29.{{cite web}}: CS1 maint: url-status (link)
  37. ↑ "中卫电厂5号机组发电机定子吊装". 北极星电力网. 2025-07-29. Retrieved 2026-07-29.{{cite web}}: CS1 maint: url-status (link)
  38. ↑ "中卫电厂5号机组汽轮机扣盖完成". 微信公众平台. 2025-11-11. Retrieved 2026-07-29.{{cite web}}: CS1 maint: url-status (link)
  39. ↑ "中卫电厂5号锅炉水压试验一次成功". 微信公众平台. 2025-11-20. Retrieved 2026-07-29.{{cite web}}: CS1 maint: url-status (link)
  40. ↑ "中卫电厂5号锅炉吹管完成". 微信公众平台. 2026-01-06. Retrieved 2026-07-29.{{cite web}}: CS1 maint: url-status (link)
  41. ↑ "中卫电厂5号机组首次并网成功". 北极星电力网. 2026-03-19. Retrieved 2026-07-29.{{cite web}}: CS1 maint: url-status (link)
  42. ↑ "中卫电厂5号机组通过满负荷试运正式投产". 中国电力建设企业协会. 2026-04-15. Retrieved 2026-07-29.{{cite web}}: CS1 maint: url-status (link)
  43. ↑ "中卫电厂6号锅炉首根钢架吊装". 微信公众平台. 2024-10-17. Retrieved 2026-07-29.{{cite web}}: CS1 maint: url-status (link)
  44. ↑ "中卫电厂6号锅炉首根大板梁吊装". 北极星电力网. 2025-05-07. Retrieved 2026-07-29.{{cite web}}: CS1 maint: url-status (link)
  45. ↑ "中卫电厂烟囱4号钢内筒就位". 微信公众平台. 2025-11-20. Retrieved 2026-07-29.{{cite web}}: CS1 maint: url-status (link)
  46. ↑ "中卫电厂6号机组发电机定子吊装就位". 微信公众平台. 2026-01-06. Retrieved 2026-07-29.{{cite web}}: CS1 maint: url-status (link)
  47. ↑ "中卫电厂6号机组锅炉水压试验一次合格". 微信公众平台. 2026-06-15. Retrieved 2026-07-29.{{cite web}}: CS1 maint: url-status (link)
  48. ↑ "中卫电厂6号机组厂用电系统受电成功". 微信公众平台. 2026-06-15. Retrieved 2026-07-29.{{cite web}}: CS1 maint: url-status (link)
  49. ↑ "中卫电厂6号机组汽轮机扣盖完成". 微信公众平台. 2026-06-15. Retrieved 2026-07-29.{{cite web}}: CS1 maint: url-status (link)
  50. ↑ "Chinese nuclear giant officially launched". World Nuclear Association. 16 July 2015. Retrieved 4 May 2015.
  51. ↑ 51.0 51.1 "五大发电集团将在甘肃陕西等5省区形成"一家央企一个省区"格局". finance.sina.com.cn. 2020-05-23.{{cite web}}: CS1 maint: url-status (link)
  52. ↑ "国能中卫热电有限公司 - 企查查". www.qcc.com. Retrieved 2022-11-21.

Additional data

To access additional data, including an interactive map of coal-fired power stations, a downloadable dataset, and summary data, please visit the Global Coal Plant Tracker on the Global Energy Monitor website.