CCC Norte IV (Lerdo) power station (Central CC Norte IV (Lerdo)) is a power station under construction in Lerdo, Durango, Mexico. It is also known as Lerdo.
Location
Table 1: Project-level location details
Plant name | Location | Coordinates (WGS 84) |
---|---|---|
CCC Norte IV (Lerdo) power station | Lerdo, Durango, Mexico | 25.5540, -103.5458 (approximate)[1] |
The map below shows the approximate location of the power station.
Project Details
Table 2: Unit-level details
Unit name | Status | Fuel(s) | Capacity (MW) | Technology | CHP | Start year | Retired year |
---|---|---|---|---|---|---|---|
Unit 1 | construction[2][3] | gas[4] | 409 MW[5] | combined cycle[6][7][8] | - | 2024-2027 (planned)[2][7][3] | - |
CHP is an abbreviation for Combined Heat and Power. It is a technology that produces electricity and thermal energy at high efficiencies. Coal units track this information in the Captive Use section when known.
Table 3: Unit-level ownership and operator details
Unit name | Operator | Owner | Parent |
---|---|---|---|
Unit 1 | Comisión Federal de Electricidad EPE[7][8] | Comisión Federal de Electricidad EPE | Comisión Federal de Electricidad EPE |
Financing
| 2023-2027 (planned)[4][5][6][7]
Background
Early estimates of the project's gross capacity ranged as high as 990 megawatts (MW)[2][9][10], though more recent reports have reduced this figure to 455 MW.[8][1] As of December 2022, the Norte IV plant was still an active project[11][12][13], listed in various government reports with expected start-up dates ranging from 2023[4][5] to 2027.[6]
Articles and Resources
References
- ↑ 1.0 1.1 https://goo.gl/maps/n3UzaM7wQd4wWKbz7.
{{cite web}}
: Missing or empty|title=
(help) Cite error: Invalid<ref>
tag; name "ref_0" defined multiple times with different content - ↑ 2.0 2.1 2.2 https://energyandcommerce.com.mx/avanza-construccion-de-central-ciclo-combinado-san-luis-potosi-de-cfe/.
{{cite web}}
: Missing or empty|title=
(help) Cite error: Invalid<ref>
tag; name "ref_1" defined multiple times with different content - ↑ 3.0 3.1 (PDF) https://infosen.senado.gob.mx/sgsp/gaceta/65/2/2023-05-03-1/assets/documentos/SEGOB_Informe_Anual_CFE_2022.pdf.
{{cite web}}
: Missing or empty|title=
(help) - ↑ 4.0 4.1 4.2 "Proyectan construirplanta de ciclo combinado este año". El Siglo. Archived from the original on May 3, 2021. Retrieved May 4, 2021. Cite error: Invalid
<ref>
tag; name "ref_3" defined multiple times with different content Cite error: Invalid<ref>
tag; name "ref_3" defined multiple times with different content - ↑ 5.0 5.1 5.2 (PDF) https://www.cfe.mx/finanzas/Documents/Plan_Negocios_2023-2027.pdf.
{{cite web}}
: Missing or empty|title=
(help) Cite error: Invalid<ref>
tag; name "ref_4" defined multiple times with different content Cite error: Invalid<ref>
tag; name "ref_4" defined multiple times with different content - ↑ 6.0 6.1 6.2 "El Papel del SUTERM frente a las actividades que hacen posible el Mercado Eléctrico" (PDF). Universidad Nacional Autonoma de Mexico, Instituto de Investigaciones Economicas. March 8, 2017. Archived (PDF) from the original on May 3, 2021. Retrieved May 4, 2021. Cite error: Invalid
<ref>
tag; name "ref_5" defined multiple times with different content Cite error: Invalid<ref>
tag; name "ref_5" defined multiple times with different content - ↑ 7.0 7.1 7.2 7.3 (PDF) https://web.archive.org/web/20221117121526/https://www.cfe.mx/finanzas/Documents/Plan%20de%20Negocios%20CFE%202021.pdf. Archived from the original (PDF) on 2022-11-17.
{{cite web}}
: Missing or empty|title=
(help) Cite error: Invalid<ref>
tag; name "ref_6" defined multiple times with different content - ↑ 8.0 8.1 8.2 (PDF) https://apps1.semarnat.gob.mx:8443/dgiraDocs/documentos/dgo/resolutivos/2019/10DU2019E0022.pdf.
{{cite web}}
: Missing or empty|title=
(help) Cite error: Invalid<ref>
tag; name "ref_7" defined multiple times with different content - ↑ "Proyecto de presupuesto de egresos de la federación 2018 - programas y proyectos de inversión (p. 36)" (PDF). CFE. September 2017.
{{cite web}}
: CS1 maint: url-status (link) - ↑ "Aplaza CFE licitación de nuevas centrales". El Norte. July 17, 2019.
{{cite web}}
: CS1 maint: url-status (link) - ↑ "Informe Anual 2020 (p 52)" (PDF). CFE. April 2021.
{{cite web}}
: CS1 maint: url-status (link) - ↑ "PROYECTO DE PRESUPUESTO DE EGRESOS DE LA FEDERACIÓN 2022 (p 17)" (PDF). Secretaría de Hacienda y Crédito Público. September 2021.
{{cite web}}
: CS1 maint: url-status (link) - ↑ "Presupuesto de Egresos de la Federación 2022 - Sector Energético (p 54)" (PDF). CMIC. 2022.
{{cite web}}
: CS1 maint: url-status (link)
Additional data
To access additional data, including an interactive map of gas-fired power stations, a downloadable dataset, and summary data, please visit the Global Oil and Gas Plant Tracker on the Global Energy Monitor website.