Colíder Es Participacoes Mato Grossense solar project
From Global Energy Monitor
| This article is part of the Global Solar Power Tracker, a Global Energy Monitor project. |
Colíder Es Participacoes Mato Grossense solar project is an operating solar photovoltaic (PV) farm in Colíder, Mato Grosso, Brazil.
Project Details
Table 1: Phase-level project details for Colíder Es Participacoes Mato Grossense solar project
| Phase name | Status | Commissioning year | Nameplate capacity | Technology |
|---|---|---|---|---|
| 1 | Operating[1] | 2024[1] | 2.5 MW[1] | PV[1] |
| 2 | Operating[1] | 2025[1] | 2.5 MW[1] | PV[1] |
Read more about Solar capacity ratings.
Location
Table 2: Phase-level location details for Colíder Es Participacoes Mato Grossense solar project
| Phase Name | Location | Coordinates (WGS 84) |
|---|---|---|
| 1 | Colíder, Mato Grosso, Brazil[1] | -15.0000, -56.0000 (approximate)[1] |
| 2 | Colíder, Mato Grosso, Brazil[1] | -15.0000, -56.0000 (approximate)[1] |
The map below shows the approximate locations of the solar farm phases: