Dalia Phase 3 Oil Field (Angola)

From Global Energy Monitor
This article is part of the Global Oil and Gas Extraction Tracker, a Global Energy Monitor project.
Report an error
Related categories:

Dalia Phase 3 Oil Field is an in development oil field in Angola.

Dalia Phase 3 is a part of the Dalia complex.

Project Details

Main Data

Table 1: Field-level project details for Dalia Phase 3 Oil Field

*Final Investment Decision
Unit name Status Operator Owner Discovery year FID* year Production start year
Dalia Phase 3 In development[1] TotalEnergies[1][2] TotalEnergies (38.0%); Equinor (22.16%); ExxonMobil (19.0%); BP (15.84%); Sonangol Pesquisa e Produção (5.0%)[1] 2022 (expected)[1]

Production and Reserves

Table 2: Production from Dalia Phase 3 Oil Field

million bbl/y = million barrels of oil per year
Category Fuel Description Quantity Units Data Year Source
production design capacity oil 10.95 million bbl/y 2021 [3]

Location

Table 3: field-level location details for Dalia Phase 3 Oil Field

Concession/Block Location Coordinates (WGS 84)
Block 17[1] Offshore, Angola[3] -7.4363, 11.636 (approximate)[3]

The map below shows the approximate location of the field(s) within the Dalia complex:

Loading map...

Articles and Resources

Additional data

To access additional data, including an interactive map of oil and gas extraction sites, a downloadable dataset, and summary data, please visit the Global Oil and Gas Extraction Tracker on the Global Energy Monitor website.

References

  1. 1.0 1.1 1.2 1.3 1.4 https://web.archive.org/web/20221209135456/https://www.offshore-technology.com/marketdata/dalia-conventional-oil-field-angola/. Archived from the original on 09 December 2022. {{cite web}}: Check date values in: |archive-date= (help); Missing or empty |title= (help)
  2. https://www.sec.gov/Archives/edgar/data/879764/000163462118000029/ex994.htm. {{cite web}}: Missing or empty |title= (help)
  3. 3.0 3.1 3.2 https://web.archive.org/web/20220818222819/https://totalenergies.com/media/news/press-releases/angola-total-inaugurates-kaombo-project-and-reiterates-its-commitment-country-new-investments. Archived from the original on 18 August 2022. {{cite web}}: Missing or empty |title= (help)