Baoding cogen power station
Part of the Global Coal Plant Tracker, a Global Energy Monitor project. |
Related coal trackers: |
Baoding cogen power station (大唐保定热电厂) is an operating power station of at least 1100-megawatts (MW) in 316 Guangming Road, Xinshi District, Baoding, Hebei, China with multiple units, some of which are not currently operating. It is also known as 大唐保定华源热电 (Unit 08, Unit 09), 大唐保定热电厂九期 (Unit 12 & 13).
Location
Table 1: Project-level location details
Plant name | Location | Coordinates (WGS 84) |
---|---|---|
Baoding cogen power station | 316 Guangming Road, Xinshi District, Baoding, Hebei, China | 38.859647, 115.405195 (exact) |
Unit-level coordinates (WGS 84):
- Phase IV Unit 12, Phase IV Unit 13, Unit 10, Unit 11: 38.859647, 115.405195
- Unit 03, Unit 04, Unit 05, Unit 07, Unit 08, Unit 09: 38.876144, 115.433433
Project Details
Table 2: Unit-level details
Unit name | Status | Fuel(s) | Capacity (MW) | Technology | Start year | Retired year |
---|---|---|---|---|---|---|
Phase IV Unit 12 | Operating[1][2] | coal: unknown | 350 | supercritical | 2023[1] | – |
Phase IV Unit 13 | Operating[3] | coal: unknown | 350 | supercritical | 2024[4] | – |
Unit 03 | Retired | coal: anthracite | 50 | subcritical | 1969 | 2008 |
Unit 04 | Retired | coal: anthracite | 55 | subcritical | 1972 | 2008 |
Unit 05 | Retired | coal: anthracite | 50 | subcritical | 1981 | 2008 |
Unit 07 | Retired | coal: anthracite | 55 | subcritical | 1988 | 2008 |
Unit 08 | Retired | coal: unknown | 125 | subcritical | 2003 | 2018 |
Unit 09 | Retired | coal: unknown | 125 | subcritical | 2004 | 2018 |
Unit 10 | Operating | coal: unknown | 200 | subcritical | 2008 | – |
Unit 11 | Operating | coal: unknown | 200 | subcritical | 2008 | – |
Table 3: Unit-level ownership and operator details
Unit name | Owner | Parent |
---|---|---|
Phase IV Unit 12 | Datang Hebei Power Generation Co Ltd [100%] | Datang International Power Generation Co Ltd [100.0%] |
Phase IV Unit 13 | Datang Hebei Power Generation Co Ltd [100%] | Datang International Power Generation Co Ltd [100.0%] |
Unit 03 | Datang Hebei Power Generation Co Ltd [100%] | Datang International Power Generation Co Ltd [100.0%] |
Unit 04 | Datang Hebei Power Generation Co Ltd [100%] | Datang International Power Generation Co Ltd [100.0%] |
Unit 05 | Datang Hebei Power Generation Co Ltd [100%] | Datang International Power Generation Co Ltd [100.0%] |
Unit 07 | Datang Hebei Power Generation Co Ltd [100%] | Datang International Power Generation Co Ltd [100.0%] |
Unit 08 | Datang Baoding Worldbest Thermoelectricity Co Ltd [100%] | Datang International Power Generation Co Ltd [61.0%]; Hebei Construction & Investment Group Co Ltd [29.0%]; Baoding Guokong Group Co Ltd [10.0%] |
Unit 09 | Datang Baoding Worldbest Thermoelectricity Co Ltd [100%] | Datang International Power Generation Co Ltd [61.0%]; Hebei Construction & Investment Group Co Ltd [29.0%]; Baoding Guokong Group Co Ltd [10.0%] |
Unit 10 | Datang Hebei Power Generation Co Ltd [100%] | Datang International Power Generation Co Ltd [100.0%] |
Unit 11 | Datang Hebei Power Generation Co Ltd [100%] | Datang International Power Generation Co Ltd [100.0%] |
Background
Baoding cogen power station was founded in 1958. The first two units were commissioned in 1960 and units 6-7 in 1988. All seven units were retired between 2007 and 2008.[5] It is owned by China Datang.[6]
Units 8 and 9 were built in 2003. They were also called Baoding Huayuan Power Company. Units 10 and 11 were completed in 2008 and in a different location from other units. The four units, units 8-11, were all co-generating, supplying heat in the winter to the city of Baoding.[7]
Units 8 and 9 were retired in 2018 due to the bankruptcy of Baoding Huayuan Power Company after it failed to pay out billions of yuan in debt.[8]
Expansion
China Datang proposed to expand the power station by 2 x 350 MW units. One of the units (Unit 12) was permitted for construction by China's NRDC in December 2016, before its EIA was approved by the provincial environmental protection agency.[9][10] China Datang was planning to retire units 8 and 9 with a total capacity of 250 MW when the new unit was commissioned.[10]
Unit 13 was permitted for construction on May 31, 2019.[11] Units 12 and 13 were expected to be built next to units 10 and 11.
Based on a 2021 governmental document, the project may have been tasked with re-applying for approval of its energy-saving plan and coal consumption replacement plan due to the delay in entering construction. However, the company appeared to decide to move forward with building the units regardless.[12]
One article noted construction on the 2 x 350 MW expansion began in February 2022.[13] From satellite imagery, there were some signs of construction, including signs of a cooling tower and smoke stacks.
Articles and Resources
References
- ↑ 1.0 1.1 "大唐保定热电厂九期2×350MW热电项目12号机组正式投运-北极星火力发电网". news.bjx.com.cn. 2023-12-26. Archived from the original on 2024-02-07. Retrieved 2024-01-03.
- ↑ "大唐保定热电厂九期项目建设"加速跑"-供热新闻-中能供热网". news.58heating.com. 2023-04-13. Archived from the original on 2024-01-25. Retrieved 2023-10-27.
- ↑ "2×350MW!大唐保定热电厂九期项目13号机组通过168小时试运行-北极星火力发电网". news.bjx.com.cn. 2024-04-07. Archived from the original on 2024-04-16. Retrieved 2024-04-08.
- ↑ "大唐保定热电厂九期2×350MW热电项目12号机组成功通过168小时满负荷试运行,正式投入商业运营". Weixin Official Accounts Platform. 2023-12-27. Archived from the original on 2024-02-07. Retrieved 2024-01-03.
- ↑ 保定热电厂, Baidu Baike
- ↑ Datang Baoding Powerplant, Enipedia, accessed Sept. 2015.
- ↑ 大唐保定热电厂简介, China Datang Co, date unknown
- ↑ 河北:关于2018年煤电行业淘汰落后产能目标任务的公告 共涉及13台机组, 北极星电力网, 2018/5/14
- ↑ 核准丨大唐保定热电厂1 35万千瓦热电联产项目获核准, December 27, 2016
- ↑ 10.0 10.1 大唐保定热电厂2×350MW热电机组项目环境影响报告书的批复, 国火力发电网, 2017-3-21
- ↑ 大唐保定热电厂九期扩建项目获核准, Sina, May 13, 2019
- ↑ Archive, hbdrc.hebei.gov.cn
- ↑ 煤电建设提速,企业投资动力何来? hxny, 2022-09-14
Additional data
To access additional data, including an interactive map of coal-fired power stations, a downloadable dataset, and summary data, please visit the Global Coal Plant Tracker on the Global Energy Monitor website.