Ningde power station (大唐宁德发电厂) is an operating power station of at least 2520-megawatts (MW) in Hong'an Road, Fu'an, Ningde, Fujian, China with multiple units, some of which are not currently operating.

Location

Table 1: Project-level location details

Plant name Location Coordinates (WGS 84)
Ningde power station Hong'an Road, Fu'an, Ningde, Fujian, China 26.7574469, 119.7353942 (exact)

The map below shows the exact location of the power station.

Loading map...


Unit-level coordinates (WGS 84):

  • Phase I Unit 1, Phase I Unit 2, Phase II Unit 3, Phase II Unit 4, Phase III Unit 5, Phase III Unit 6: 26.7574469, 119.7353942

Project Details

Table 2: Unit-level details

Unit name Status Fuel(s) Capacity (MW) Technology Start year Retired year
Phase I Unit 1 operating coal - bituminous 600 supercritical 2006
Phase I Unit 2 operating coal - bituminous 600 supercritical 2006
Phase II Unit 3 operating coal - bituminous 660 supercritical 2009
Phase II Unit 4 operating coal - bituminous 660 supercritical 2008
Phase III Unit 5 cancelled coal - bituminous 1000 supercritical
Phase III Unit 6 cancelled coal - bituminous 1000 supercritical

Table 3: Unit-level ownership and operator details

Unit name Owner
Phase I Unit 1 Fujian Datang International Ningde POWER Generation Co Ltd [100.0%]
Phase I Unit 2 Fujian Datang International Ningde POWER Generation Co Ltd [100.0%]
Phase II Unit 3 Fujian Datang International Ningde POWER Generation Co Ltd [100.0%]
Phase II Unit 4 Fujian Datang International Ningde POWER Generation Co Ltd [100.0%]
Phase III Unit 5 Fujian Datang International Ningde POWER Generation Co Ltd [100.0%]
Phase III Unit 6 Fujian Datang International Ningde POWER Generation Co Ltd [100.0%]

Project-level coal details

  • Permit(s): August 1, 2005

Background

The four existing coal-fired units of Datang Ningde power station, totaling 2,520 MW, were brought online between 2006 and 2009.The plant is owned by China Datang.[1]

Description of Expansion

China Datang was planning to build two additional coal-fired units at this plant, with a total planned capacity of 2,000 MW.[2][3]

However, there have been no developments on the units since at least 2013, and they appear to be abandoned.

2016: Nationwide Restrictions Imposed on Development of Coal-Fired Power Capacity

Due to new restrictions announced during 2016 by the National Energy Administration and the National Development and Reform Commission, further capacity expansions at this location appear to be on hold or cancelled. For details, see China's 2016 Restrictions on Development of Coal-Fired Power Capacity.

Plant Details for Existing Phases I & II

  • Sponsor: Datang International Power Generation Co
  • Parent company: Datang
  • Location: Baima port, Fu'an City, Ningde Prefecture, Fujian Province, China
  • Coordinates: 26.7574469, 119.7353942 (exact)
  • Status: Operating
  • Gross capacity: 2,520 MW (Units 1 & 2: 600 MW; Units 3 & 4: 660 MW)
  • Type: Supercritical
  • In service: 2006-09
  • Coal type:
  • Coal source:
  • Source of financing: ¥10.3 billion ($1.5 billion)

Articles and Resources

References

  1. “福建大唐国际宁德发电有限责任公司简介 ,” 中国大唐集团公司 accessed September 2014
  2. Ailun Yang and Yiyun Cui, "Global Coal Risk Assessment: Data Analysis and Market Research," World Resources Institute working paper, November 2012
  3. "福建大唐国际宁德电厂三期(2×1000MW)工程," accessed June 2013

Additional data

To access additional data, including an interactive map of coal-fired power stations, a downloadable dataset, and summary data, please visit the Global Coal Plant Tracker on the Global Energy Monitor website.