Shanxi Anyu power station
| Part of the Global Coal Plant Tracker, a Global Energy Monitor project. |
| Related coal trackers: |
Shanxi Anyu power station (晋煤大唐安峪热电) is a shelved power station in Anyu Xiang Sunwang village, Jiang, Yuncheng, Shanxi, China. It is also known as Datang Shanxi Anyu power station.
Location
Table 1: Project-level location details
| Plant name | Location | Coordinates (WGS 84) |
|---|---|---|
| Shanxi Anyu power station | Anyu Xiang Sunwang village, Jiang, Yuncheng, Shanxi, China | 35.573757, 111.667306 (exact) |
Unit-level coordinates (WGS 84):
- Unit 1, Unit 2: 35.573757, 111.667306
Project Details
Table 2: Unit-level details
| Unit name | Status | Fuel(s) | Capacity (MW) | Technology | CHP | Emergency/Backup |
|---|---|---|---|---|---|---|
| Unit 1 | Shelved | coal: unknown[1] | 350 | supercritical | yes | False |
| Unit 2 | Shelved | coal: unknown[1] | 350 | supercritical | yes | False |
Table 3: Unit-level ownership and operator details
| Unit name | Owner | Parent |
|---|---|---|
| Unit 1 | Shanxi Jinmei Datang Anyu Thermal Power Co Ltd [100%] | China Datang Corp Ltd [44.0%]; Shanxi State-Owned Capital Investment and Operation Co Ltd [29.0%]; China Development Bank Corp [11.5%]; China Cinda Asset Management Co Ltd [6.3%]; Jiangxian Jinxin Construction Investment Co Ltd [4.8%]; Jinneng Holding Group Co Ltd [3.2%]; Jiang County Water Supply Service Station [1.2%] |
| Unit 2 | Shanxi Jinmei Datang Anyu Thermal Power Co Ltd [100%] | China Datang Corp Ltd [44.0%]; Shanxi State-Owned Capital Investment and Operation Co Ltd [29.0%]; China Development Bank Corp [11.5%]; China Cinda Asset Management Co Ltd [6.3%]; Jiangxian Jinxin Construction Investment Co Ltd [4.8%]; Jinneng Holding Group Co Ltd [3.2%]; Jiang County Water Supply Service Station [1.2%] |
Project-level coal details
- Coal source(s): domestic
Ownership Tree
This ownership tree is part of the Global Energy Ownership Tracker, a project of Global Energy Monitor.
Background
China Datang and partners have proposed a power station of two units of 350 MW each. The project was approved by the National Development and Reform Commission in 2014.[2]
Land clearing and prep work began in 2015.[3][4]
Nationwide Restrictions Imposed on Development of Coal-Fired Power Capacity
In January 2017 China's National Energy Administration suspended over 100 planned and under-construction coal power projects with a total capacity of over 100GW in 13 provinces, including Datang Shanxi Anyu. It is unclear when or if the projects will be revived.[5]
For details, see China's 2016 Restrictions on Development of Coal-Fired Power Capacity.
2018: Project advancing
In July 2018 China Energy Construction Shanxi won the bid for the survey and design of the plant, with construction expected to begin soon.[6]
In November 2019, the project's Environmental Impact Assessment was reposted.[7] As of December 2023, the proposal was still active.[8]
The project was shelved in 2024 after years of inactivity.[9] No further news was reported.
Articles and Resources
References
- ↑ 1.0 1.1 https://www.gem.wiki/Coal_source_methodology_for_the_Global_Coal_Plant_Tracker.
{{cite web}}: Missing or empty|title=(help) - ↑ "中信机电电厂“上大压小”项目获得国家发改委核准批复," CITIC Machinery website, April 8, 2014
- ↑ "新常态新作为:绛县大唐安峪热电厂项目启动," 山西法制报(太原), 2015-05-28
- ↑ "晋煤集团与大唐合作建设安峪热电项目," 中国煤炭资源, 2015年09月02日
- ↑ "能源局下发13省市新建火电机组停建清单(附文件)," Polaris, Jan 16, 2017
- ↑ "中国能建山西院中标大唐安峪热电厂2×350MW“上大压小”勘测设计工程," 山西院, 2018-07-24
- ↑ "山西晋煤大唐安峪热电有限公司2×350MW热电项目环境影响评价公众参与信息公告," jiangxian.gov, November 6, 2019
- ↑ "大唐安峪热电厂项目简介," jiangxian.gov, December 22, 2023
- ↑ "大唐安峪热电厂项目情况". 绛县人民政府. 2021-05-24. Retrieved 2026-07-30.
{{cite web}}: CS1 maint: url-status (link)
Additional data
To access additional data, including an interactive map of coal-fired power stations, a downloadable dataset, and summary data, please visit the Global Coal Plant Tracker on the Global Energy Monitor website.