Xutang power station (大唐徐塘发电厂) is an operating power station of at least 1200-megawatts (MW) in Xutang, Pizhou, Xuzhou, Jiangsu, China with multiple units, some of which are not currently operating.

Location

Table 1: Project-level location details

Plant name Location Coordinates (WGS 84)
Xutang power station Xutang, Pizhou, Xuzhou, Jiangsu, China 34.348611, 117.931944 (exact)
Loading map...

Unit-level coordinates (WGS 84):

  • Phase I Unit 1, Phase I Unit 2, Phase II Unit 3, Phase II Unit 4, Phase III Unit 5, Phase III Unit 6: 34.348611, 117.931944

Project Details

Table 2: Unit-level details

Unit name Status Fuel(s) Capacity (MW) Technology CHP Start year Emergency/Backup
Phase I Unit 1 Operating coal: bituminous[1] 300 subcritical yes 2001 False
Phase I Unit 2 Operating coal: bituminous[1] 300 subcritical yes 2001 False
Phase II Unit 3 Operating coal: bituminous[1] 300 subcritical yes 2004 False
Phase II Unit 4 Operating coal: bituminous[1] 300 subcritical yes 2004 False
Phase III Unit 5 Announced[2] coal: bituminous[2][1] 1000[2] ultra-supercritical[2] – – False
Phase III Unit 6 Announced[2] coal: bituminous[2][1] 1000[2] ultra-supercritical[2] – – False

Table 3: Unit-level ownership and operator details

Unit name Owner Parent
Phase I Unit 1 Jiangsu Xutang Power Generation Co Ltd [100%] China Datang Corp Ltd [50.0%]; Jiangsu Guoxin Investment Group Ltd [45.0%]; Pizhou Price Identification Center [5.0%]
Phase I Unit 2 Jiangsu Xutang Power Generation Co Ltd [100%] China Datang Corp Ltd [50.0%]; Jiangsu Guoxin Investment Group Ltd [45.0%]; Pizhou Price Identification Center [5.0%]
Phase II Unit 3 Jiangsu Xutang Power Generation Co Ltd [100%] China Datang Corp Ltd [50.0%]; Jiangsu Guoxin Investment Group Ltd [45.0%]; Pizhou Price Identification Center [5.0%]
Phase II Unit 4 Jiangsu Xutang Power Generation Co Ltd [100%] China Datang Corp Ltd [50.0%]; Jiangsu Guoxin Investment Group Ltd [45.0%]; Pizhou Price Identification Center [5.0%]
Phase III Unit 5 Jiangsu Xutang Power Generation Co Ltd [100%] China Datang Corp Ltd [50.0%]; Jiangsu Guoxin Investment Group Ltd [45.0%]; Pizhou Price Identification Center [5.0%]
Phase III Unit 6 Jiangsu Xutang Power Generation Co Ltd [100%] China Datang Corp Ltd [50.0%]; Jiangsu Guoxin Investment Group Ltd [45.0%]; Pizhou Price Identification Center [5.0%]

Project-level coal details

  • Coal source(s): domestic

Ownership Tree

This ownership tree is part of the Global Energy Ownership Tracker, a project of Global Energy Monitor.

Background

The four existing coal-fired units of Xutang power station, totaling 1,200 MW, were brought online between 2001 and 2004. The plant is owned by China Datang.[3][4]

Description of Expansion

Datang is currently planning to build two additional coal-fired units at this plant, with a total planned capacity of 2,000 MW.[5]

However, with no developments since May 2015, the project appears to be cancelled.

Phase III Unit 5 was on Jiangsu's 15th Five-Year Plan project list in January 2025[6], and the preliminary feasibility report review passed on January 3[7]. No significant news emerged in 2026[8].

Plant Details for Existing Units 1-4

  • Sponsor: Datang International Power Generation Co
  • Parent company: Datang
  • Location: Xutang Community, Pizhou City, Xuzhou Prefecture, Jiangsu Province, China
  • Coordinates: 34.348611, 117.931944 (exact)
  • Status: Operating
  • Gross capacity: 1,200 MW (Units 1-4: 300 MW)
  • Type: Subcritical
  • In service: 2001 (Units 1 & 2); 2004 (Units 3 & 4)
  • Coal type:
  • Coal source:
  • Source of financing:

Articles and Resources

References

  1. ↑ 1.0 1.1 1.2 1.3 1.4 1.5 https://www.gem.wiki/Coal_source_methodology_for_the_Global_Coal_Plant_Tracker. {{cite web}}: Missing or empty |title= (help)
  2. ↑ 2.0 2.1 2.2 2.3 2.4 2.5 2.6 2.7 https://mp.weixin.qq.com/s/Q3iz2mkJQZYJfEHnJYzgyQ. {{cite web}}: Missing or empty |title= (help)
  3. ↑ "江苏徐塘发电有限责任公司2×1000MW燃煤机组三期扩建工程可行性研究招标公告", 电力招标网, 2013-11-18
  4. ↑ "江苏徐塘发电有限责任公司上大压小扩建2×1000MW高效超超临界机组工", 阿里巴巴商友圈, 2014-03-08
  5. ↑ "徐塘发电公司召开三期2×1000WM地质勘探工作会议," Datang Jiangsu Power Generation, 2015-5-22
  6. ↑ "江苏省十五五煤电项目优选排序结果公示". 江苏省发改委. 2025-01-20. Retrieved 2026-07-29.{{cite web}}: CS1 maint: url-status (link)
  7. ↑ "徐塘发电2×1000MW三期扩建项目可研评审通过". 微信公众平台. 2025-02-03. Retrieved 2026-07-29.{{cite web}}: CS1 maint: url-status (link)
  8. ↑ "徐塘电厂三期项目无新进展". 北极星电力网. 2026-06-10. Retrieved 2026-07-29.{{cite web}}: CS1 maint: url-status (link)

Additional data

To access additional data, including an interactive map of coal-fired power stations, a downloadable dataset, and summary data, please visit the Global Coal Plant Tracker on the Global Energy Monitor website.