La Unión FSRU

From Global Energy Monitor
Part of the
Global Gas Infrastructure Tracker,
a Global Energy Monitor project.
Download full dataset
Report an error

La Unión FSRU, also known as El Salvador FSRU, Unidad Flotante de Almacenamiento y Regasificación (UFAR) El Salvador and Unidad Flotante de Almacenamiento y Regasificación (UFAR) El Salvador, is a cancelled (confirmed) LNG import terminal in El Salvador.

Location

Table 1: Location details

Name Location Coordinates (WGS 84)
La Unión FSRU Port of La Union, La Unión, La Unión, El Salvador[1][2] 13.336944, -87.843889 (approximate)

The map below shows the approximate location of the terminal:

Loading map...

Project Details

Table 2: Infrastructure details

mtpa = million tonnes per year
Name Facility type Status Capacity Total terminal capacity Offshore Associated infrastructure
El Salvador FSRU import[1][2][3] cancelled (confirmed)[1] 0.5 mtpa[4] 0.5 mtpa True –

Table 3: Cost

Name Facility type Cost Total known terminal costs
El Salvador FSRU import[1][2][3] US$950,000,000[5] US$950,000,000

Financing

No financing data available.

Table 4: Project timeline

FID = Final Investment Decision, used by some developers to indicate a project will move forward
Name Facility type Status Proposal year FID year Construction year Operating year Inactive year
El Salvador FSRU import[1][2][3] cancelled (confirmed)[1] 2007[6][3][7] – – –[1][2][1][2] 2014 (cancelled)[8]

Ownership

Table 5: Ownership

Name Facility type Status Owners Parent companies Operator
El Salvador FSRU import[1][2][3] cancelled (confirmed)[1] Cutuco Energy; Fonseca Energy[1][2][3][1][2][5][3] Cutuco Energy; Fonseca Energy –

Background

La Unión LNG Terminal was a proposed LNG terminal in La Unión, El Salvador.[9] The project is now cancelled. The Houston-based energy company Cutuco and Fonseca Energy announced in 2007 a planned construction of a 520 MW power plant and LNG terminal at the port of La Union, in El Salvador[10] The terminal was to contain a tank with a capacity 160,000 cubic meters and then expand in the second phase up to 320,000 cubic meters.[11] The proposal was consistently delayed and pushed back until 2016. Since then, the project has been officially cancelled due to local resistance and municipal opposition.[12]

Articles and Resources

Additional data

To access additional data, including an interactive map of LNG terminals, a downloadable dataset, and summary data, please visit the Global Gas Infrastructure Tracker on the Global Energy Monitor website.

References

  1. ↑ 1.00 1.01 1.02 1.03 1.04 1.05 1.06 1.07 1.08 1.09 1.10 1.11 (PDF) https://thedialogue.org/wp-content/uploads/2024/12/NatGAs_1.pdf. {{cite web}}: Missing or empty |title= (help)
  2. ↑ 2.0 2.1 2.2 2.3 2.4 2.5 2.6 2.7 2.8 (PDF) https://www.ppiaf.org/sites/default/files/documents/2015-01/Output_P143848_2015_11_24_15_23.pdf. {{cite web}}: Missing or empty |title= (help)
  3. ↑ 3.0 3.1 3.2 3.3 3.4 3.5 3.6 (PDF) https://media.portal.nlinbusiness.com/LN_Gterminalconstructionin_Portof_La_Union_942c172e1edcf5d86acaea091a232081_a2789255b1/LN_Gterminalconstructionin_Portof_La_Union_942c172e1edcf5d86acaea091a232081_a2789255b1.pdf. {{cite web}}: Missing or empty |title= (help)
  4. ↑ http://killajoules.wikidot.com/archive:cutuco-energy-grants-cabei-mandate-as-lead-arranger. {{cite web}}: Missing or empty |title= (help)
  5. ↑ 5.0 5.1 https://www.centralamericalink.com/noticia/cutuco-energy-lng-project-to-seek-supply-calls-in-guatemala-and-el-salvador. {{cite web}}: Missing or empty |title= (help)
  6. ↑ https://web.archive.org/web/20210924091621/http://www.gasandoil.com/news/2007/09/cnl73738. {{cite web}}: Missing or empty |title= (help)
  7. ↑ http://abarrelfull.wikidot.com/el-salvador-lng-terminal. {{cite web}}: Missing or empty |title= (help)
  8. ↑ (PDF) https://thedialogue.org/wp-content/uploads/2024/12/NatGAs_1.pdf https://thedialogue.org/wp-content/uploads/2024/12/NatGAs_1.pdf; https://thedialogue.org/wp-content/uploads/2024/12/NatGAs_1.pdf. {{cite web}}: Check |url= value (help); Missing or empty |title= (help)
  9. ↑ El Salvador LNG Terminal, A Barrel Full, accessed April 2017
  10. ↑ Cutuco Energy to begin LNG and power plant works in El Salvador, Gas & Oil Connections, accessed September 2017
  11. ↑ LNG Terminal El Salvador, BNamericas, accessed September 2017
  12. ↑ Natural Gas in Central America, Working Paper, accessed September 2017