Somiani–Nawabshah Gas Pipeline

From Global Energy Monitor

Somiani–Nawabshah Gas Pipeline is a proposed gas pipeline in Pakistan.[1]

Location

The pipeline starts in Sonmiani, Balochistan and ends in Nawabshah, Sindh.[1]

Loading map...

Project Details

  • Operator: Inter State Gas Systems (Private) Ltd[2]
  • Capacity: 700 to 1200 MMCFD[1]
  • Length: 310 km / 192.63 miles[2]
  • Status: Proposed[2]
  • Start Year: 2018[2]

Background

The pipeline will connect the planned Bahria Foundation LNG re-gasification terminal at Sonmiani with Nawabshah. The initial part of the pipeline (158 km) will follow Dureji Road until it meets Iran Pakistan Gas pipeline near Dureji. From Dureji to Nawabshah (152km), it will follow the Iran Pakistan Gas pipeline route.[1][2]

Articles and resources

References

  1. 1.0 1.1 1.2 1.3 "Govt to lay 310km pipeline to connect LNG terminal with Nawabshah". The Nation. 2018-06-19. Retrieved 2021-08-10.
  2. 2.0 2.1 2.2 2.3 2.4 "Prime Minister's Office, Islamabad, Pakistan". pmo.gov.pk. Retrieved 2021-08-10.

Related SourceWatch articles

External resources

External articles