Changzhou power station
| Part of the Global Coal Plant Tracker, a Global Energy Monitor project. |
| Related coal trackers: |
Changzhou power station (国能常州发电厂) is an operating power station of at least 3260-megawatts (MW) in Chunjiang, Xinbei, Changzhou, Jiangsu, China. It is also known as 江苏常州电厂2×100万千瓦燃煤发电机组扩建项目 (Phase II Unit 3 & 4).
Location
Table 1: Project-level location details
| Plant name | Location | Coordinates (WGS 84) |
|---|---|---|
| Changzhou power station | Chunjiang, Xinbei, Changzhou, Jiangsu, China | 31.7640014, 120.1241254 (exact)[1] |
Unit-level coordinates (WGS 84):
- Phase II Unit 3, Phase II Unit 4: 31.7640014, 120.1241254
- Phase I Unit 1, Phase I Unit 2: 31.9583333, 119.9925
Project Details
Table 2: Unit-level details
| Unit name | Status | Fuel(s) | Capacity (MW) | Technology | CHP | Start year | Emergency/Backup |
|---|---|---|---|---|---|---|---|
| Phase I Unit 1 | Operating | coal: unknown[2] | 630 | supercritical | yes | 2006 | False |
| Phase I Unit 2 | Operating | coal: unknown[2] | 630 | supercritical | yes | 2006 | False |
| Phase II Unit 3 | Operating[3] | coal: unknown[2][4] | 1000[4] | ultra-supercritical[3] | – | 2025[3] | False |
| Phase II Unit 4 | Operating[5] | coal: unknown[2][4] | 1000[4] | ultra-supercritical[5] | – | 2025[5] | False |
Table 3: Unit-level ownership and operator details
| Unit name | Owner | Parent |
|---|---|---|
| Phase I Unit 1 | Guodian Changzhou Power Generating Co Ltd [100%] | GD POWER Development Co Ltd [39.6%]; China Shenhua Energy Co Ltd [29.3%]; Jiangsu Guoxin Investment Group Ltd [27.0%]; unknown [4.0%] |
| Phase I Unit 2 | Guodian Changzhou Power Generating Co Ltd [100%] | GD POWER Development Co Ltd [39.6%]; China Shenhua Energy Co Ltd [29.3%]; Jiangsu Guoxin Investment Group Ltd [27.0%]; unknown [4.0%] |
| Phase II Unit 3 | Guodian Changzhou Power Generating Co Ltd [100%] | GD POWER Development Co Ltd [39.6%]; China Shenhua Energy Co Ltd [29.3%]; Jiangsu Guoxin Investment Group Ltd [27.0%]; unknown [4.0%] |
| Phase II Unit 4 | Guodian Changzhou Power Generating Co Ltd [100%] | GD POWER Development Co Ltd [39.6%]; China Shenhua Energy Co Ltd [29.3%]; Jiangsu Guoxin Investment Group Ltd [27.0%]; unknown [4.0%] |
Project-level coal details
- Coal source(s): domestic
Ownership Tree
This ownership tree is part of the Global Energy Ownership Tracker, a project of Global Energy Monitor.
Background
The two existing coal-fired units of Changzhou power station, totaling 1,260 MW, were brought online in 2006.[6]
Description of Expansion
China Guodian was planning to add two additional coal-fired units at this plant, with a total capacity of 1,320 MW.[7]
With no development since July 2014, the proposal appeared to be shelved or cancelled.
However, in 2022, the proposal was revived. It was expanded from 2 x 660 MW to 2 x 1,000 MW.[8]
The project was permitted in October 2022 and construction ceremony was held in November 2022 but concrete was poured into the main structure foundation of unit 3 at the end of June 2023[9][10][11] and unit 4 at the end of August 2023.[12][13]
In March 2024, Unit 3's first beam was hoisted. In November 2024, the generator stator was placed. In January 2025, the boiler hydrostatic test succeeded, followed by boiler ignition in May 2025. Unit 3 completed its 168-hour trial run in July 2025[14].
In September 2023, the first concrete pour for Phase II Unit 4 occurred. In October 2023, the boiler installation ceremony was held.
In March 2024, the deaerator was placed, followed by beam hoisting in April 2024. In November 2024, the DCS system was energized.
In January 2025, the plant power system was energized. In July 2025, the boiler ignition and steam blowing were completed. Unit 4 achieved grid connection in August 2025[15] and commenced commercial operation in September 2025[16].
In January 2026, the project was listed among eight new-generation coal power pilot projects[17].
Ownership
On August 28 2017, China's State-owned Assets Supervision and Administration Commission of the State Council (SASAC) announced that China Guodian Corporation and Shenhua Group will be jointly restructured. Shenhua Group will become China National Energy Investment Group and will absorb China Guodian Corporation. It will be the largest power company in the world by installed capacity, as well as the world's largest coal producer.[18][19] The merger was completed on November 28, 2017.[20]
Articles and Resources
References
- ↑ https://news.bjx.com.cn/html/20230703/1316591.shtml.
{{cite web}}: Missing or empty|title=(help) - ↑ 2.0 2.1 2.2 2.3 https://www.gem.wiki/Coal_source_methodology_for_the_Global_Coal_Plant_Tracker.
{{cite web}}: Missing or empty|title=(help) - ↑ 3.0 3.1 3.2 https://news.bjx.com.cn/html/20250715/1451159.shtml.
{{cite web}}: Missing or empty|title=(help) - ↑ 4.0 4.1 4.2 4.3 https://news.bjx.com.cn/html/20221128/1272273.shtml.
{{cite web}}: Missing or empty|title=(help) - ↑ 5.0 5.1 5.2 https://news.bjx.com.cn/html/20250916/1461113.shtml.
{{cite web}}: Missing or empty|title=(help) - ↑ "国电常州电厂二期可行性研究报告评审会召开", 中国发电网, 2007-06-05
- ↑ "武俊在江苏公司2014年年中工作会上作工作报告", 国电江苏电力有限公司, 2014-07-27
- ↑ 关于“先立后改”建设清洁高效支撑性电源项目规划建设实施方案的公示, Jiangsu Gov, 2022-09-19
- ↑ 常州电厂2×100万千瓦燃煤发电机组扩建项目冷却塔桩基工程公开招标, BJX, 2022-10-18
- ↑ 总投资80亿元!国能常州支撑性电源项目开工, BJX, 2022-11-28
- ↑ "国能常州2×100万千瓦机组扩建项目正式开工". 北极星电力网. 2023-07-03. Retrieved 2023-8-15.
{{cite web}}: Check date values in:|access-date=(help)CS1 maint: url-status (link) - ↑ "国能常州2×100万千瓦项目4号机组主厂房第一罐混凝土浇筑完成". 北极星电力网. 2023-09-11. Retrieved 2023-9-14.
{{cite web}}: Check date values in:|access-date=(help)CS1 maint: url-status (link) - ↑ "国能常州2×100万千瓦机组扩建项目4号机组主厂房第一罐混凝土浇筑顺利完成". 火电之声. 2023-09-10. Retrieved 2023-9-14.
{{cite web}}: Check date values in:|access-date=(help)CS1 maint: url-status (link) - ↑ "国家能源集团江苏常州公司二期扩建工程3号机组完成168小时满负荷试运行". 北极星电力网. 2025-07-15. Retrieved 2025-07-30.
{{cite web}}: CS1 maint: url-status (link) - ↑ "国能常州2×100万千瓦机组扩建工程4号机组首次并网一次性成功". 北极星电力网. 2025-08-22. Retrieved 2025-08-26.
{{cite web}}: CS1 maint: url-status (link) - ↑ "国能常州电厂4号机组投产发电". 微信公众平台. 2025-09-16. Retrieved 2025-09-22.
{{cite web}}: CS1 maint: url-status (link) - ↑ "国家能源局公示8个新一代煤电试点项目". 北极星电力网. 2026-01-09. Retrieved 2026-01-09.
{{cite web}}: CS1 maint: url-status (link) - ↑ "Factbox: Shenhua and Guodian - China's latest state marriage". Reuters. 29 August 2017. Retrieved 30 August 2017.
- ↑ "China Is Creating the World's Largest Power Company". Bloomberg News. 28 August 2017. Retrieved 29 August 2017.
- ↑ "China’s Newly-Established National Energy Investment Group Sets World Records in Its Sector, With Assets of Over CNY1.8 Trillion," Yicai Global, 11-28-2017
Additional data
To access additional data, including an interactive map of coal-fired power stations, a downloadable dataset, and summary data, please visit the Global Coal Plant Tracker on the Global Energy Monitor website.