Hejin power station

From Global Energy Monitor
(Redirected from Hejin-2 power station)
Part of the
Global Coal Plant Tracker,
a Global Energy Monitor project.
Download full dataset
Report an error
Related coal trackers:

Hejin power station (晋能控股漳泽电力河津发电厂) is an operating power station of at least 1300-megawatts (MW) in Yangcun Town, Hejin, Yuncheng, Shanxi, China with multiple units, some of which are not currently operating. It is also known as 河津三期“上大压小” (Unit 5, Unit 6).

Location

Table 1: Project-level location details

Plant name Location Coordinates (WGS 84)
Hejin power station Yangcun Town, Hejin, Yuncheng, Shanxi, China 35.613056, 110.655833 (exact)

The map below shows the exact location of the power station.

Loading map...


Unit-level coordinates (WGS 84):

  • Unit 2, Unit 3, Unit 4, Unit 5, Unit 6: 35.613056, 110.655833
  • Unit 1: 36.330829, 113.102622

Project Details

Table 2: Unit-level details

Unit name Status Fuel(s) Capacity (MW) Technology Start year Retired year
Unit 1 operating coal - bituminous 350 subcritical 2000
Unit 2 operating coal - bituminous 350 subcritical 2000
Unit 3 operating coal - bituminous 300 subcritical 2005
Unit 4 operating coal - bituminous 300 subcritical 2005
Unit 5 announced coal - unknown 1000 ultra-supercritical
Unit 6 announced coal - unknown 1000 ultra-supercritical

Table 3: Unit-level ownership and operator details

Unit name Owner
Unit 1 Hejin Power Generation Branch Co [100.0%]
Unit 2 Hejin Power Generation Branch Co [100.0%]
Unit 3 Hejin Power Generation Branch Co [100.0%]
Unit 4 Hejin Power Generation Branch Co [100.0%]
Unit 5 Hejin Power Generation Branch Co [100.0%]
Unit 6 Hejin Power Generation Branch Co [100.0%]

Background

Hejin consists of two coal-fired power station phases. Hejin-1 is a 2x350 MW plant commissioned in 2000. Hejin-2 is a 2x300 MW plant commissioned in 2005. They are owned by Datong Coal Mining Group.[1]

In June 2021, an additional 2,000 expansion (Hejin-3) was referenced.[2]

Articles and Resources

References

  1. "河津发电厂," Baidu, accessed July 2016
  2. 山西首家百万发电机组晋能控股集团长治发电公司双机投产, (原标题:【做好“六稳” 落实“六保”】我省首家百万发电机组晋能控股集团长治发电公司双机投产), xinhuanet, June 25, 2021

Additional data

To access additional data, including an interactive map of coal-fired power stations, a downloadable dataset, and summary data, please visit the Global Coal Plant Tracker on the Global Energy Monitor website.