Huainan Luohe power station (大唐淮南洛河发电厂) is an operating power station of at least 1900-megawatts (MW) in Luohe, Datong, Huainan, Anhui, China with multiple units, some of which are not currently operating.

Location

Table 1: Project-level location details

Plant name Location Coordinates (WGS 84)
Huainan Luohe power station Luohe, Datong, Huainan, Anhui, China 32.68455, 117.07511 (exact)
Loading map...

Unit-level coordinates (WGS 84):

  • Phase I Unit 1, Phase I Unit 2, Phase II Unit 3, Phase II Unit 4, Phase III Unit 5, Phase III Unit 6, Phase IV Unit 7, Phase IV Unit 8, Phase V Unit 10, Phase V Unit 9: 32.68455, 117.07511

Project Details

Table 2: Unit-level details

Unit name Status Fuel(s) Capacity (MW) Technology Start year Retired year
Phase I Unit 1 Retired[1] coal: bituminous 320 subcritical 1985 2024[1]
Phase I Unit 2 Retired[1] coal: bituminous 320 subcritical 1986 2024[1]
Phase II Unit 3 Operating coal: bituminous 320 subcritical 1998
Phase II Unit 4 Operating coal: bituminous 320 subcritical 1999
Phase III Unit 5 Operating coal: bituminous 630 supercritical 2007
Phase III Unit 6 Operating coal: bituminous 630 supercritical 2007
Phase IV Unit 7 Construction[2] coal: bituminous[3] 1000[3] ultra-supercritical[3]
Phase IV Unit 8 Construction[2] coal: unknown[3] 1000[4] ultra-supercritical[4]
Phase V Unit 10 Announced[5] coal: bituminous[5] 1000[5] ultra-supercritical[5]
Phase V Unit 9 Announced[5] coal: bituminous[5] 1000[5] ultra-supercritical[5]

Table 3: Unit-level ownership and operator details

Unit name Owner Parent
Phase I Unit 1 Datang Anhui Power Generation Co Ltd [100%] Datang International Power Generation Co Ltd [100.0%]
Phase I Unit 2 Datang Anhui Power Generation Co Ltd [100%] Datang International Power Generation Co Ltd [100.0%]
Phase II Unit 3 Anhui Huainan Luoneng Power Generation Co Ltd [100%] Datang International Power Generation Co Ltd [52.8%]; An Hui Wenergy Co Ltd [46.0%]; unknown [1.2%]
Phase II Unit 4 Anhui Huainan Luoneng Power Generation Co Ltd [100%] Datang International Power Generation Co Ltd [52.8%]; An Hui Wenergy Co Ltd [46.0%]; unknown [1.2%]
Phase III Unit 5 Anhui Huainan Luoneng Power Generation Co Ltd [100%][6][7] Datang International Power Generation Co Ltd [52.8%]; An Hui Wenergy Co Ltd [46.0%]; unknown [1.2%]
Phase III Unit 6 Anhui Huainan Luoneng Power Generation Co Ltd [100%] Datang International Power Generation Co Ltd [52.8%]; An Hui Wenergy Co Ltd [46.0%]; unknown [1.2%]
Phase IV Unit 7 Anhui Huainan Luoneng Power Generation Co Ltd [100%][3] Datang International Power Generation Co Ltd [52.8%]; An Hui Wenergy Co Ltd [46.0%]; unknown [1.2%]
Phase IV Unit 8 Anhui Huainan Luoneng Power Generation Co Ltd [100%][3] Datang International Power Generation Co Ltd [52.8%]; An Hui Wenergy Co Ltd [46.0%]; unknown [1.2%]
Phase V Unit 10 Anhui Huainan Luoneng Power Generation Co Ltd [100%][5] Datang International Power Generation Co Ltd [52.8%]; An Hui Wenergy Co Ltd [46.0%]; unknown [1.2%]
Phase V Unit 9 Anhui Huainan Luoneng Power Generation Co Ltd [100%][5] Datang International Power Generation Co Ltd [52.8%]; An Hui Wenergy Co Ltd [46.0%]; unknown [1.2%]

Project-level coal details

  • Permit(s): 皖发改能源〔2023〕517号[3][4]

Background

The six existing coal-fired units of Huainan Luohe power station, totaling 2,500 MW, were brought online between 1985 and 2010 in three phases. The plant is owned by China Datang.[8][9][10][11]

In 2010, two 600 MW units were upgraded to 630 MW each.[12] As of 2014, the configuration of the plant was as follows:[13][14]

  • Unit 1 - 300 MW - operating 1985 (subcritical)
  • Unit 2 - 300 MW - operating 1986 (subcritical)
  • Unit 3 - 300 MW - operating 1998 (subcritical)
  • Unit 4 - 300 MW - operating 1999 (subcritical)
  • Unit 5 - 600 MW - operating 2007 (supercritical) - upgraded to 630 MW in 2010
  • Unit 6 - 600 MW - operating 2007 (supercritical) - upgraded to 630 MW in 2010


On June 11, 2025, Huaihe Energy released the award announcement for the technical proposal and feasibility study report preparation services, as well as preliminary technical consulting and review services for the Luohe Power Plant Phase V (Unit 9 & Unit 10) 2×1000MW ultra-supercritical coal-fired power generation expansion project.[15]

On October 15, 2025, the left wall of the vertical section water-cooled wall for Unit 8 boiler at Luohe Power Station was successfully lifted into position.[16]

On October 28, 2025, the chimney structure of Huainan Luohe Power Plant Phase IV 2×1000MW coal-fired power project (Unit 7 & Unit 8) successfully topped out.[17]

Description of Phase IV Expansion

As of November 2012, Datang was planning to build an additional 1,000-MW coal-fired unit.[8] A feasibility study was carried out in 2011.[18][18][19][19][20]

However, there had been no news on the project since its 2011 feasibility study, and it appeared to be deferred or abandoned.

In August 2023, the Phase IV proposal was revived, now with 2 x 1,000 MW units. The announcement stated that when the Phase IV units were operational, the 2 x 320 MW Phase I would be retired.[21]

In November 2023, Phase IV was approved by the Provincial Development and Reform Commission.[22]

Articles and Resources

References

  1. 1.0 1.1 1.2 1.3 https://hdj.nea.gov.cn/dtyw/jgdt/202409/t20240912_269294.html. {{cite web}}: Missing or empty |title= (help)
  2. 2.0 2.1 https://news.bjx.com.cn/html/20241226/1419363.shtml. {{cite web}}: Missing or empty |title= (help)
  3. 3.0 3.1 3.2 3.3 3.4 3.5 3.6 "我市洛河电厂四期2×1000MW煤电项目获省发展改革委批复_淮南市发展和改革委员会". fgw.huainan.gov.cn. 023-11-14. Archived from the original on 2024-01-25. Retrieved 2023-12-15. {{cite web}}: Check date values in: |date= (help)
  4. 4.0 4.1 4.2 https://fzggw.ah.gov.cn/public/7011/148796261.html. {{cite web}}: Missing or empty |title= (help)
  5. 5.0 5.1 5.2 5.3 5.4 5.5 5.6 5.7 5.8 5.9 https://news.bjx.com.cn/html/20250224/1428544.shtml. {{cite web}}: Missing or empty |title= (help)
  6. "洛河电厂联合重组圆满收官!". Weixin Official Accounts Platform. Archived from the original on 2024-02-19. Retrieved 2024-01-26.
  7. "大唐发电:子公司拟3.55亿元转让淮南洛河发电100%股权". Weixin Official Accounts Platform. Archived from the original on 2024-02-19. Retrieved 2024-01-26.
  8. 8.0 8.1 Ailun Yang and Yiyun Cui, "Global Coal Risk Assessment: Data Analysis and Market Research," World Resources Institute working paper, November 2012
  9. Datang Huainan Luohe Power Plant China, Global Energy Observatory, accessed 2014-11.
  10. Huainan Luohe Powerplant, Enipedia, accessed 2014-11.
  11. Datang Huainan Luohe Power Plant (大唐淮南洛河发电厂), EMIS, accessed 2014-11.
  12. "大唐淮南洛河发电厂简介," China Datang, accessed November 2014
  13. “大唐淮南洛河电厂三期2×600MW机组举行开工仪式,” 安徽新闻 2005-09-09
  14. “大唐洛河发电厂三期工程通过竣工环境保护验收,” 中国电力 2009-12-25
  15. "淮河能源发布洛河电厂五期2×1000MW超超临界燃煤发电改扩建项目技术方案及可行性研究报告编制服务、前期技术咨询与评审服务成交公告" 北极星电力网, 2025-06-12
  16. "洛河电厂四期项目8号锅炉垂直段水冷壁左侧墙顺利吊装就位" 火电之声, 2025-10-20
  17. "淮南洛河电厂四期2×1000MW煤电项目烟囱工程顺利实现结构封顶" 中能建建筑集团, 2025-11-4
  18. 18.0 18.1 “大唐淮南洛河发电厂四期扩建1×100万千瓦机组工程,” 中国淮南 accessed September 2014
  19. 19.0 19.1 “大唐淮南洛河发电厂四期1×1000MW机组工程项目,” 安徽招标网 2011-10-18
  20. “大唐淮南洛河发电厂四期扩建1×100万千瓦机组工程,” 中国淮南 accessed September 2014
  21. “安徽淮南洛能发电有限责任公司淮南洛河电厂四期2×1000MW煤电项目环境影响评价第一次公示,” sthjj.huainan.gov, August 15, 2023
  22. “我市洛河电厂四期2×1000MW煤电项目获省发展改革委批复,” fgw.huainan.gov, November 14, 2023