Yingkou Xianrendao power station (华能国际仙人岛热电) is an operating power station of at least 100-megawatts (MW) in Xianrendao, Gaizhou, Yingkou, Liaoning, China.
Location
Table 1: Project-level location details
| Plant name | Location | Coordinates (WGS 84) |
|---|---|---|
| Yingkou Xianrendao power station | Xianrendao, Gaizhou, Yingkou, Liaoning, China | 40.158213, 122.042592 (exact) |
Unit-level coordinates (WGS 84):
- Unit 1, Unit 2: 40.158213, 122.042592
Project Details
Table 2: Unit-level details
| Unit name | Status | Fuel(s) | Capacity (MW) | Technology | CHP | Start year | Emergency/Backup |
|---|---|---|---|---|---|---|---|
| Unit 1 | Operating | coal: unknown[1] | 50 | subcritical | yes | 2017 | False |
| Unit 2 | Operating | coal: unknown[1] | 50 | subcritical | yes | 2017 | False |
Table 3: Unit-level ownership and operator details
| Unit name | Owner | Parent |
|---|---|---|
| Unit 1 | Huaneng Yingkou Xianrendao Thermal Power Co Ltd [100%] | Huaneng Power International Inc [100.0%] |
| Unit 2 | Huaneng Yingkou Xianrendao Thermal Power Co Ltd [100%] | Huaneng Power International Inc [100.0%] |
Project-level coal details
- Coal source(s): imported
Ownership Tree
This ownership tree is part of the Global Energy Ownership Tracker, a project of Global Energy Monitor.
Background on Project
China Huaneng was planning to build a two-unit coal-fired power plant with a total planned capacity of 100 MW in Liaoning Province. The plant was scheduled to be completed in 2016.[2][3]
The project was permitted in January 2014,[4] and began construction in October 2014.[5]
Unit 1 was commissioned on March 6, 2017.[6] Unit 2 was commissioned on March 27, 2017.[7]
Articles and Resources
References
- ↑ 1.0 1.1 https://www.gem.wiki/Coal_source_methodology_for_the_Global_Coal_Plant_Tracker.
{{cite web}}: Missing or empty|title=(help) - ↑ "华能国际仙人岛热电及六合风电场项目获核准", 新浪财经, 2014-01-16
- ↑ "关于华能营口仙人岛热电新建工程环境影响报告书的批复", 辽宁省环境保护厅, 2013-10-09
- ↑ "华能国际仙人岛热电及六合风电场项目获核准," 证券时报网, 2014年01月16日
- ↑ "总投资15.8亿元的华能营口仙人岛热电项目进展顺利," 来源:营口日报, 2015/7/10
- ↑ "盖州工业靠“仙人岛效应”提质进级," Jan 16, 2017
- ↑ 华能仙人岛热电项目建成投产, March 29, 2017