Huaneng Yueyang power station

From Global Energy Monitor
(Redirected from Huaneng Yuezhou Power Plant)
Part of the
Global Coal Plant Tracker,
a Global Energy Monitor project.
Download full dataset
Report an error
Related coal trackers:

Huaneng Yueyang power station (华能岳阳发电厂) is an operating power station of at least 2525-megawatts (MW) in Chenglingji, Yueyanglou District, Yueyang, Hunan, China with multiple units, some of which are not currently operating. It is also known as Huaneng Yuezhou power station.

Location

Table 1: Project-level location details

Plant name Location Coordinates (WGS 84)
Huaneng Yueyang power station Chenglingji, Yueyanglou District, Yueyang, Hunan, China 29.4497908, 113.1623018 (exact)

The map below shows the exact location of the power station.

Loading map...


Unit-level coordinates (WGS 84):

  • Phase I Unit 1, Phase I Unit 2, Phase II Unit 3, Phase II Unit 4, Phase III Unit 5, Phase III Unit 6, Phase IV Unit 7, Phase IV Unit 8: 29.4497908, 113.1623018

Project Details

Table 2: Unit-level details

Unit name Status Fuel(s) Capacity (MW) Technology Start year Retired year
Phase I Unit 1 operating coal - anthracite 362.5 subcritical 1992
Phase I Unit 2 operating coal - anthracite 362.5 subcritical 1992
Phase II Unit 3 operating coal - anthracite 300 subcritical 2006
Phase II Unit 4 operating coal - anthracite 300 subcritical 2006
Phase III Unit 5 operating coal - anthracite 600 ultra-supercritical 2011
Phase III Unit 6 operating coal - anthracite 600 ultra-supercritical 2012
Phase IV Unit 7 cancelled coal - anthracite 1000 ultra-supercritical
Phase IV Unit 8 cancelled coal - anthracite 1000 ultra-supercritical

Table 3: Unit-level ownership and operator details

Unit name Owner
Phase I Unit 1 Huaneng Hunan Yueyang Power Generation Co Ltd [100.0%]
Phase I Unit 2 Huaneng Hunan Yueyang Power Generation Co Ltd [100.0%]
Phase II Unit 3 Huaneng International Power Co Ltd Yueyang Power Plant [100.0%]
Phase II Unit 4 Huaneng International Power Co Ltd Yueyang Power Plant [100.0%]
Phase III Unit 5 Huaneng Hunan Yueyang Power Generation Co Ltd [100.0%]
Phase III Unit 6 Huaneng Hunan Yueyang Power Generation Co Ltd [100.0%]
Phase IV Unit 7 Huaneng Hunan Yueyang Power Generation Co Ltd [100.0%]
Phase IV Unit 8 Huaneng Hunan Yueyang Power Generation Co Ltd [100.0%]

Project-level coal details

  • Permit(s): November 18, 2009

Background

The plant is majority owned by China Huaneng. The six existing coal-fired units of Huaneng Yueyang power station, totaling 2,525 MW, were brought online between 1992 and 2011:[1]

Description of Expansion

Units 7-8

Huaneng was planning to build at least two additional coal-fired units of 1,000 MW, units 7 & 8, at this plant.[2][3]

The units were scheduled to be completed in 2017.[4][5][6]

However, with no developments since 2014, units 7-8 appear to be shelved.

Units 9-10

China Huaneng has also proposed an additional 2,000 MW of capacity at the power station - units 9 & 10 of 1,000 MW each.[7]

However, there have been no developments on units 9-10 since 2012, and plans appear to be abandoned.

Plant Details for Existing Units 1-6

  • Operator: Huaneng Hunan Yueyang Power Generation Co., Ltd. 华能湖南岳阳发电有限责任公司[8]
  • Sponsor: China Huaneng (55%), Hunan Xiangtou International Investment (45%)
  • Parent: China Huaneng
  • Location: Chenglingji, Yueyanglou District, Yueyang Prefecture, Hunan Province, China
  • Coordinates: 29.4497908, 113.1623018 (exact)
  • Status: Operating
  • Gross capacity: 2,525 MW (Units 1 & 2: 363 MW; Units 3 & 4: 300 MW; Units 5 & 6: 600 MW)
  • Type: Subcritical
  • In service: 1992 (Units 1 & 2); 2006 (Units 3 & 4); 2011 (Unit 5); 2012 (Unit 6)
  • Coal type:
  • Coal source:
  • Source of financing:

Articles and Resources

References

  1. "Huaneng Yueyang Coal Power Plant China," Global Energy Observatory, accessed October 2014
  2. Ailun Yang and Yiyun Cui, "Global Coal Risk Assessment: Data Analysis and Market Research," World Resources Institute working paper, November 2012
  3. “华能国际电力股份有限公司湖南分公司关于“新建华能湖南岳州电厂一期(2X1000MW)建设工程”的公示", 岳阳市人民政府,发改委办公室, 2014-06-11
  4. "湖南公示大型火电项目优选评议结果 华电平江电厂等上榜", 凤凰网资讯,滚动新闻, 2014-07-17
  5. "华能集团将在岳阳新建火电厂" accessed June 2013
  6. "蒙华铁路沿线煤电项目密集部署", 人民网,《中国能源报》第15版, 2014-04-14
  7. "Huaneng Yueyang Power Plant Phase IV expansion and siting new projects held in South Lake Hotel preliminary Matchmaking," yueyang.gov, 2012-05-16
  8. "华能湖南岳阳发电有限责任公司 - 企查查". www.qcc.com. Retrieved 2021-11-02.

Additional data

To access additional data, including an interactive map of coal-fired power stations, a downloadable dataset, and summary data, please visit the Global Coal Plant Tracker on the Global Energy Monitor website.