Jieyang LNG Terminal (PipeChina), also known as 国家管网粤东LNG接收站 and 国家管网揭阳LNG接收站, is an LNG import terminal in China with units that are proposed and operating.

Location

Table 1: Location details

Name Location Coordinates (WGS 84)
Phase 1 Jieyang, Guangdong, China[1] 22.934479, 116.371427 (exact)
Phase 2 Jieyang, Guangdong, China[1] 22.934479, 116.371427 (exact)

The map below shows the exact location of the terminal:

Loading map...

Project Details

Table 2: Infrastructure details

mtpa = million tonnes per year
Name Facility type Status Capacity Total terminal capacity Offshore Associated infrastructure
Phase 1 import[1] operating[2] 5.04 mtpa[1][3][4] 10.04 mtpa False –
Phase 2 import proposed[5] 5 mtpa[5] 10.04 mtpa False –

Table 3: Cost

Name Facility type Cost Total known terminal costs
Phase 1 import[1] US$1,632,000,000 (10,200,000,000 RMB)[6] US$1,632,000,000
Phase 2 import – US$1,632,000,000

Financing

No financing data available.

Table 4: Project timeline

FID = Final Investment Decision, used by some developers to indicate a project will move forward
Name Facility type Status Proposal year FID year Construction year Operating year Inactive year
Phase 1 import[1] operating[2] – – 2013[6][7] 2017[2] –
Phase 2 import proposed[5] 2025[5] – – – –

Ownership

Table 5: Ownership

Name Facility type Status Owners Parent companies Operator
Phase 1 import[1] operating[2] Pipechina Yuedong LNG Co Ltd [100%][8] National Petroleum and Natural Gas Pipeline Network Group Co Ltd [100.0%] –
Phase 2 import proposed[5] Pipechina Yuedong LNG Co Ltd [100%][8] National Petroleum and Natural Gas Pipeline Network Group Co Ltd [100.0%] –

Background

Jieyang LNG Terminal (PipeChina) is an operating LNG terminal in Guangdong, China.[9]

Phase 1

The Jieyang LNG Terminal project was approved in 2013 and was completed in 2015. However, a lack in demand postponed commissioning of the project.[10][11] The terminal has three tanks and a receiving capacity of 2 mtpa.[12]

The first cargo delivery was received in 2017 by Qatargas.[13][14]

Phase 2

On February 18, 2013, the project was approved by the National Development and Reform Commission.[15]

On July 24, 2025, the Guangdong Development and Reform Commission approved the project. [16]

On December 30, 2025, construction officially commenced.[17]

Ownership change

In February 9, 2019, the National Petroleum and Natural Gas Pipeline Group Co., Ltd. (PipeChina) was established with a major focus on the investment and construction of the long-distance oil and gas pipeline network and storage & peaking facilities, offering fair and open oil and gas pipeline transmission services.[18] 10 existing and under-construction LNG terminals were reportedly transferred or are going to transfer their ownerships to PipeChina.[19] Jieyang LNG terminal is one of them.

Articles and Resources

Additional data

To access additional data, including an interactive map of LNG terminals, a downloadable dataset, and summary data, please visit the Global Gas Infrastructure Tracker on the Global Energy Monitor website.

References

  1. ↑ 1.0 1.1 1.2 1.3 1.4 1.5 1.6 https://www.pipechina.com.cn/gywm/jtjj.html. {{cite web}}: Missing or empty |title= (help)
  2. ↑ 2.0 2.1 2.2 2.3 https://finance.sina.com.cn/money/future/nyzx/2017-05-27/doc-ifyfqvmh9215194.shtml. {{cite web}}: Missing or empty |title= (help)
  3. ↑ http://www.huilai.gov.cn/hjbh/sthjxxgk/content/post_445136.html. {{cite web}}: Missing or empty |title= (help)
  4. ↑ (PDF) http://www.huilai.gov.cn/attachment/0/75/75089/445136.pdf. {{cite web}}: Missing or empty |title= (help)
  5. ↑ 5.0 5.1 5.2 5.3 5.4 https://bendi.news.163.com/guangdong/25/0407/12/JSHT4JL404179HUU.html. {{cite web}}: Missing or empty |title= (help)
  6. ↑ 6.0 6.1 http://cpc.people.com.cn/n/2013/0210/c87228-20476018.html. {{cite web}}: Missing or empty |title= (help)
  7. ↑ http://www.sasac.gov.cn/n2588025/n2588124/c4052116/content.html. {{cite web}}: Missing or empty |title= (help)
  8. ↑ 8.0 8.1 https://www.qcc.com/weblogin?back=%2Ffirm%2Fea4e0967ec4ddfbf88aba47796331ffe.html. {{cite web}}: Missing or empty |title= (help)
  9. ↑ Jieyang LNG Terminal, A Barrel Full, accessed April 2017
  10. ↑ CNOOC to commission LNG terminal in S. China's Jieyang in Nov., Evie Feng, Shanxi Fenwei Energy Information Services Co., Ltd., February 9, 2017
  11. ↑ Chinese LNG demand falls for the first time on record, Stephen Letts, Australia Broadcasting Corporation, February 4, 2016
  12. ↑ Yuedong (Jieyang) LNG Terminal China, GEO, accessed June, 2017
  13. ↑ Qatargas delivers commissioning cargo to Yuedong LNG terminal LNG World News, May 3, 2017
  14. ↑ "中海油粤东LNG接收站5月26日正式投产"新华网 2017-5-27
  15. ↑ "揭阳大南海石化工业园项目暨中海油项目简介". 2013-03-10. Retrieved 2026-03-23.{{cite web}}: CS1 maint: url-status (link)
  16. ↑ "关于粤东LNG接收站储气工程项目核准的批复". 2025-07-28. Retrieved 2026-04-09.{{cite web}}: CS1 maint: url-status (link)
  17. ↑ "粤东LNG接收站储气工程开工". 2025-12-31. Retrieved 2026-04-09.{{cite web}}: CS1 maint: url-status (link)
  18. ↑ "集团简介--国家管网公司". www.pipechina.com.cn. Retrieved 2021-04-16.{{cite web}}: CS1 maint: url-status (link)
  19. ↑ ""三桶油"的这十座LNG接收站,或划入国家管网公司". finance.sina.com.cn. Retrieved 2021-04-16.