Huazhou power station (京能河南京煤滑州热电厂) is an operating power station of at least 700-megawatts (MW) in Lijiang Road, Hua, Anyang, Henan, China. It is also known as Henan Huaxian, 滑俊热电.

Location

Table 1: Project-level location details

Plant name Location Coordinates (WGS 84)
Huazhou power station Lijiang Road, Hua, Anyang, Henan, China 35.528319, 114.575647 (exact)

The map below shows the exact location of the power station.

Loading map...


Unit-level coordinates (WGS 84):

  • Unit 1, Unit 2: 35.528319, 114.575647

Project Details

Table 2: Unit-level details

Unit name Status Fuel(s) Capacity (MW) Technology Start year Retired year
Unit 1 operating coal - unknown 350 supercritical 2020
Unit 2 operating coal - unknown 350 supercritical 2021

Table 3: Unit-level ownership and operator details

Unit name Owner
Unit 1 Henan Jingneng Huazhou Thermal Power Co Ltd [100.0%]
Unit 2 Henan Jingneng Huazhou Thermal Power Co Ltd [100.0%]

Project-level coal details

  • Permit(s): November 23, 2016

Background on Project

Beijing Coal Group has proposed a 2 x 350 MW coal plant in Anyang, a prefecture-level city in Henan province.[1][2]

The project was permitted by the Henan Provincial Development and Reform Commission in December 2016.[3]

It is planned to begin construction in July 2018 and the two units will be put into operation in 2020. This project will serve as the main source of central heating for Huaxian County and Jingxian County.[4]

Construction was reported in November 2018.[5]

Unit 1 was commissioned on November 11, 2020.[6] Unit 2 was commissioned in February 2021.[7]

Articles and Resources

References

  1. "河南京煤滑州热电有限责任公司现场促进会暨奠基仪式隆重举行," 京煤集团, 2015年11月20日
  2. "中南院公司签订河南2台35万千瓦火电机组总承包合同," 中南电力设计院有限公司, 2015-11-11
  3. "京煤集团热电联产项目获批," Dec 16, 2016
  4. "河南京煤滑州热电有限责任公司招聘- 北极星火电招聘网," hdjob.bjx.com, accessed May 2018
  5. "河南京煤滑州热电联产项目正式开工建设," Sohu, 2018-11-14
  6. "滑州热电1号机组168小时试运行圆满成功_能源杂志". www.inengyuan.com. 2020-11-23. Retrieved 2021-01-05.{{cite web}}: CS1 maint: url-status (link)
  7. "京能滑州热电2X350MW热电联产项目2号机组168小时试运圆满成功," 京能电力, 2021-02-07