Qinhuangdao power station
| Part of the Global Coal Plant Tracker, a Global Energy Monitor project. |
| Related coal trackers: |
Qinhuangdao power station (京能秦皇岛热电) is an operating power station of at least 700-megawatts (MW) in Xiaxvgezhuang, Funing District, Qinhuangdao, Hebei, China with multiple units, some of which are not currently operating. It is also known as 中煤能秦皇岛热电二期.
Location
Table 1: Project-level location details
| Plant name | Location | Coordinates (WGS 84) |
|---|---|---|
| Qinhuangdao power station | Xiaxvgezhuang, Funing District, Qinhuangdao, Hebei, China | 39.925144, 119.378781 (exact)[1] |
Unit-level coordinates (WGS 84):
- Phase I Unit 1, Phase I Unit 2, Phase II Unit 3, Phase II Unit 4: 39.925144, 119.378781
Project Details
Table 2: Unit-level details
| Unit name | Status | Fuel(s) | Capacity (MW) | Technology | CHP | Start year | Emergency/Backup |
|---|---|---|---|---|---|---|---|
| Phase I Unit 1 | Operating | coal: unknown[2] | 350 | supercritical | yes | 2019 | False |
| Phase I Unit 2 | Operating | coal: unknown[2] | 350 | supercritical | yes | 2020 | False |
| Phase II Unit 3 | Construction[3] | coal: unknown[1][2] | 660[1] | ultra-supercritical[1] | yes[1] | – | False |
| Phase II Unit 4 | Construction[3] | coal: unknown[1][2] | 660[1] | ultra-supercritical[1] | yes[1] | – | False |
Table 3: Unit-level ownership and operator details
| Unit name | Owner | Parent |
|---|---|---|
| Phase I Unit 1 | Jingneng Qinhuangdao Thermal Power Co Ltd [100%][1] | Beijing Jingneng Power Co Ltd [100.0%] |
| Phase I Unit 2 | Jingneng Qinhuangdao Thermal Power Co Ltd [100%][1] | Beijing Jingneng Power Co Ltd [100.0%] |
| Phase II Unit 3 | Jingneng Qinhuangdao Thermal Power Co Ltd [100%][1] | Beijing Jingneng Power Co Ltd [100.0%] |
| Phase II Unit 4 | Jingneng Qinhuangdao Thermal Power Co Ltd [100%][1] | Beijing Jingneng Power Co Ltd [100.0%] |
Project-level coal details
- Coal source(s): domestic
Ownership Tree
This ownership tree is part of the Global Energy Ownership Tracker, a project of Global Energy Monitor.
Background on Project
In April 2015 the Hebei Development Commission approved a request by Jingneng Power to begin preparatory work on a 700 MW cogeneration coal plant for the city of Qinhuangdao.[4]
The project was permitted in December 2016.[5] It is started construction in the end of 2017.[6][7]
Satellite photos from Planet show construction progress from July 2017 to April 2018, and from December 2017 to October 2019.
Unit 1 was commissioned in December 2019.[8]
Unit 2 was commissioned in April 2020.[9]
In June 2023, a 2 x 660 MW Phase II expansion was approved at the power station. The units would use ultra-supercritical technology.[10][11]
Construction for Phase II Units 3 and 4 has progressed. In 2024, the project was included in Hebei's key projects list and in August, an ownership agreement was announced between Jingneng Power and Zhongmei Power.[12][13]
In 2025, major equipment contracts were awarded, and the project’s EPC contract saw progress.[14] A groundbreaking ceremony was held in March, and the first concrete pour occurred in June.[15][16] Throughout the year, various milestones were met, including boiler steel framing and board beam lifting.[17]
In 2026, roof sealing and other final construction activities continued.[18] Phase I Units 1 and 2 were commissioned earlier.[19]
Articles and Resources
References
- ↑ 1.00 1.01 1.02 1.03 1.04 1.05 1.06 1.07 1.08 1.09 1.10 1.11 1.12 https://news.bjx.com.cn/html/20230704/1316886.shtml.
{{cite web}}: Missing or empty|title=(help) - ↑ 2.0 2.1 2.2 2.3 https://www.gem.wiki/Coal_source_methodology_for_the_Global_Coal_Plant_Tracker.
{{cite web}}: Missing or empty|title=(help) - ↑ 3.0 3.1 https://news.bjx.com.cn/html/20250626/1448139.shtml.
{{cite web}}: Missing or empty|title=(help) - ↑ "河北秦皇岛京能热电联产项目获省发改委支持开展前期工作," 北极星电力网新闻中心, 2015/4/3
- ↑ "京能秦皇岛热电联产项目获得核准," 12-12-2016
- ↑ "Jing Qin Thermal Power get together to start the construction of documents to achieve the goal of compliance with laws and regulations," Jingneng Power, 11-14
- ↑ "京能秦皇岛开发区2X35万千瓦热电联产工程主体工程Ⅰ标段正式开工," CEEC,2017-12-07
- ↑ "河北秦皇岛环保型热电联产项目投产," CN Energy, 2019-12-30
- ↑ "京能秦皇岛热电超临界2号机组投产移交," 北极星电力网新闻中心, 2020/4/26
- ↑ "京能秦皇岛热电二期2x660MW工程获核准!," news.bjx.com, 2023-07-04
- ↑ "京能2×660MW超超临界燃煤机组核准," mp.weixin.qq.com, 2023-07-05
- ↑ "河北省2024年省重点建设项目名单". 北极星电力网. 2024-04-02. Retrieved 2026-07-30.
{{cite web}}: CS1 maint: url-status (link) - ↑ "京能电力拟与中煤电力共同投资建设京能秦皇岛热电二期2×660MW工程项目". 北极星电力网. 2024-08-26. Retrieved 2026-07-30.
{{cite web}}: CS1 maint: url-status (link) - ↑ "中煤京能秦皇岛热电二期2×660MW工程新建工程EPC总承包项目中标候选人公示". 北极星电力网. 2025-01-02. Retrieved 2026-07-30.
{{cite web}}: CS1 maint: url-status (link) - ↑ "中煤京能秦皇岛热电二期2×66万千瓦项目开工活动顺利举行". 北极星电力网. 2025-03-17. Retrieved 2026-07-30.
{{cite web}}: CS1 maint: url-status (link) - ↑ "中煤京能秦皇岛热电二期2×660MW工程第一罐混凝土浇筑". 北极星电力网. 2025-06-26. Retrieved 2026-07-30.
{{cite web}}: CS1 maint: url-status (link) - ↑ "中煤京能秦皇岛热电二期2×660MW工程#1锅炉首根钢架平稳起吊". 微信公众号. 2025-08-27. Retrieved 2026-07-30.
{{cite web}}: CS1 maint: url-status (link) - ↑ "中煤京能秦皇岛热电二期2×660MW工程1号锅炉首根大板梁吊装顺利完成". 微信公众号. 2026-02-04. Retrieved 2026-07-30.
{{cite web}}: CS1 maint: url-status (link) - ↑ "京能秦皇岛热电2×350MW工程1号机组投产". 中国能源网. 2019-12-30. Retrieved 2026-07-30.
{{cite web}}: CS1 maint: url-status (link)
Additional data
To access additional data, including an interactive map of coal-fired power stations, a downloadable dataset, and summary data, please visit the Global Coal Plant Tracker on the Global Energy Monitor website.