Qinhuangdao power station (京能秦皇岛热电) is an operating power station of at least 700-megawatts (MW) in Xiaxvgezhuang, Funing District, Qinhuangdao, Hebei, China with multiple units, some of which are not currently operating. It is also known as 中煤能秦皇岛热电二期.

Location

Table 1: Project-level location details

Plant name Location Coordinates (WGS 84)
Qinhuangdao power station Xiaxvgezhuang, Funing District, Qinhuangdao, Hebei, China 39.925144, 119.378781 (exact)[1]
Loading map...

Unit-level coordinates (WGS 84):

  • Phase I Unit 1, Phase I Unit 2, Phase II Unit 3, Phase II Unit 4: 39.925144, 119.378781

Project Details

Table 2: Unit-level details

Unit name Status Fuel(s) Capacity (MW) Technology CHP Start year Emergency/Backup
Phase I Unit 1 Operating coal: unknown[2] 350 supercritical yes 2019 False
Phase I Unit 2 Operating coal: unknown[2] 350 supercritical yes 2020 False
Phase II Unit 3 Construction[3] coal: unknown[1][2] 660[1] ultra-supercritical[1] yes[1] – False
Phase II Unit 4 Construction[3] coal: unknown[1][2] 660[1] ultra-supercritical[1] yes[1] – False

Table 3: Unit-level ownership and operator details

Unit name Owner Parent
Phase I Unit 1 Jingneng Qinhuangdao Thermal Power Co Ltd [100%][1] Beijing Jingneng Power Co Ltd [100.0%]
Phase I Unit 2 Jingneng Qinhuangdao Thermal Power Co Ltd [100%][1] Beijing Jingneng Power Co Ltd [100.0%]
Phase II Unit 3 Jingneng Qinhuangdao Thermal Power Co Ltd [100%][1] Beijing Jingneng Power Co Ltd [100.0%]
Phase II Unit 4 Jingneng Qinhuangdao Thermal Power Co Ltd [100%][1] Beijing Jingneng Power Co Ltd [100.0%]

Project-level coal details

  • Coal source(s): domestic

Ownership Tree

This ownership tree is part of the Global Energy Ownership Tracker, a project of Global Energy Monitor.

Background on Project

In April 2015 the Hebei Development Commission approved a request by Jingneng Power to begin preparatory work on a 700 MW cogeneration coal plant for the city of Qinhuangdao.[4]

The project was permitted in December 2016.[5] It is started construction in the end of 2017.[6][7]

Satellite photos from Planet show construction progress from July 2017 to April 2018, and from December 2017 to October 2019.

Unit 1 was commissioned in December 2019.[8]

Unit 2 was commissioned in April 2020.[9]

In June 2023, a 2 x 660 MW Phase II expansion was approved at the power station. The units would use ultra-supercritical technology.[10][11]

Construction for Phase II Units 3 and 4 has progressed. In 2024, the project was included in Hebei's key projects list and in August, an ownership agreement was announced between Jingneng Power and Zhongmei Power.[12][13]

In 2025, major equipment contracts were awarded, and the project’s EPC contract saw progress.[14] A groundbreaking ceremony was held in March, and the first concrete pour occurred in June.[15][16] Throughout the year, various milestones were met, including boiler steel framing and board beam lifting.[17]

In 2026, roof sealing and other final construction activities continued.[18] Phase I Units 1 and 2 were commissioned earlier.[19]

Articles and Resources

References

  1. ↑ 1.00 1.01 1.02 1.03 1.04 1.05 1.06 1.07 1.08 1.09 1.10 1.11 1.12 https://news.bjx.com.cn/html/20230704/1316886.shtml. {{cite web}}: Missing or empty |title= (help)
  2. ↑ 2.0 2.1 2.2 2.3 https://www.gem.wiki/Coal_source_methodology_for_the_Global_Coal_Plant_Tracker. {{cite web}}: Missing or empty |title= (help)
  3. ↑ 3.0 3.1 https://news.bjx.com.cn/html/20250626/1448139.shtml. {{cite web}}: Missing or empty |title= (help)
  4. ↑ "河北秦皇岛京能热电联产项目获省发改委支持开展前期工作," 北极星电力网新闻中心, 2015/4/3
  5. ↑ "京能秦皇岛热电联产项目获得核准," 12-12-2016
  6. ↑ "Jing Qin Thermal Power get together to start the construction of documents to achieve the goal of compliance with laws and regulations," Jingneng Power, 11-14
  7. ↑ "京能秦皇岛开发区2X35万千瓦热电联产工程主体工程Ⅰ标段正式开工," CEEC,2017-12-07
  8. ↑ "河北秦皇岛环保型热电联产项目投产," CN Energy, 2019-12-30
  9. ↑ "京能秦皇岛热电超临界2号机组投产移交," 北极星电力网新闻中心, 2020/4/26
  10. ↑ "京能秦皇岛热电二期2x660MW工程获核准!," news.bjx.com, 2023-07-04
  11. ↑ "京能2×660MW超超临界燃煤机组核准," mp.weixin.qq.com, 2023-07-05
  12. ↑ "河北省2024年省重点建设项目名单". 北极星电力网. 2024-04-02. Retrieved 2026-07-30.{{cite web}}: CS1 maint: url-status (link)
  13. ↑ "京能电力拟与中煤电力共同投资建设京能秦皇岛热电二期2×660MW工程项目". 北极星电力网. 2024-08-26. Retrieved 2026-07-30.{{cite web}}: CS1 maint: url-status (link)
  14. ↑ "中煤京能秦皇岛热电二期2×660MW工程新建工程EPC总承包项目中标候选人公示". 北极星电力网. 2025-01-02. Retrieved 2026-07-30.{{cite web}}: CS1 maint: url-status (link)
  15. ↑ "中煤京能秦皇岛热电二期2×66万千瓦项目开工活动顺利举行". 北极星电力网. 2025-03-17. Retrieved 2026-07-30.{{cite web}}: CS1 maint: url-status (link)
  16. ↑ "中煤京能秦皇岛热电二期2×660MW工程第一罐混凝土浇筑". 北极星电力网. 2025-06-26. Retrieved 2026-07-30.{{cite web}}: CS1 maint: url-status (link)
  17. ↑ "中煤京能秦皇岛热电二期2×660MW工程#1锅炉首根钢架平稳起吊". 微信公众号. 2025-08-27. Retrieved 2026-07-30.{{cite web}}: CS1 maint: url-status (link)
  18. ↑ "中煤京能秦皇岛热电二期2×660MW工程1号锅炉首根大板梁吊装顺利完成". 微信公众号. 2026-02-04. Retrieved 2026-07-30.{{cite web}}: CS1 maint: url-status (link)
  19. ↑ "京能秦皇岛热电2×350MW工程1号机组投产". 中国能源网. 2019-12-30. Retrieved 2026-07-30.{{cite web}}: CS1 maint: url-status (link)

Additional data