| Part of the Global Gas Infrastructure Tracker, a Global Energy Monitor project. |
Jinzhou FLNG Terminal, also known as 锦州LNG接收站, is a cancelled (confirmed) LNG import terminal in China.
Location
Table 1: Location details
| Name | Location | Coordinates (WGS 84) |
|---|---|---|
| Jinzhou FLNG Terminal | Jinzhou Port, Jinzhou, Liaoning, China[1] | 40.79672, 121.074382 (approximate) |
The map below shows the approximate location of the terminal:
Project Details
Table 2: Infrastructure details
| Name | Facility type | Status | Capacity | Total terminal capacity | Offshore | Associated infrastructure |
|---|---|---|---|---|---|---|
| Jinzhou FLNG Terminal | import[1] | cancelled (confirmed) | 2.8 mtpa | 2.8 mtpa | True | – |
Table 3: Cost
| Name | Facility type | Cost | Total known terminal costs |
|---|---|---|---|
| Jinzhou FLNG Terminal | import[1] | US$640,000,000 (4,000,000,000 RMB) | US$640,000,000 |
Financing
No financing data available.
Table 4: Project timeline
| Name | Facility type | Status | Proposal year | FID year | Construction year | Operating year | Inactive year |
|---|---|---|---|---|---|---|---|
| Jinzhou FLNG Terminal | import[1] | cancelled (confirmed) | 2019[2] | – | – | – | 2023 (cancelled) |
Ownership
Table 5: Ownership
| Name | Facility type | Status | Owners | Parent companies | Operator |
|---|---|---|---|---|---|
| Jinzhou FLNG Terminal | import[1] | cancelled (confirmed) | Trafigura Ltd; Jinzhou Port Co Ltd; Dongfang Group; United Energy Group Ltd[2][2][2][2] | Dongfang Group; Farringford Foundation; Jinzhou Port Co Ltd; United Energy Group Ltd | – |
Background
On April 24, 2019, the signing ceremony for the 2.8 million tons per year LNG receiving terminal project was held at Jinzhou Port in Liaoning Province. The total investment of the project is estimated about 4 billion yuan ($611.2 million). The first phase of the project includes a floating storage regasification unit (FSRU), supporting wharf and auxiliary facilities. The second phase plans to build a shore-based LNG receiving terminal.[3][4][5]
As of June 2022, there had been not evidence of development in over three years, and the project is considered shelved.
By January 2024, the project has no further news and is considered cancelled.
Owner: Dongfang Group 东方集团; Jinzhou Port Co., Ltd.,锦州港股份有限公司; United Energy Group 联合能源集团; Trafigura Group 托克集团.
Articles and Resources
Additional data
To access additional data, including an interactive map of LNG terminals, a downloadable dataset, and summary data, please visit the Global Gas Infrastructure Tracker on the Global Energy Monitor website.
References
- ↑ 1.0 1.1 1.2 1.3 1.4 https://www.jinzhouport.com/news/414.html.
{{cite web}}: Missing or empty|title=(help) - ↑ 2.0 2.1 2.2 2.3 2.4 https://ln.cri.cn/2019-04-26/f6b0f8f1-b304-2e39-a396-f73aa8935522.html.
{{cite web}}: Missing or empty|title=(help) - ↑ "辽宁锦州港股份公司出资建设两重点项目". www.xyshjj.cn. 2019-05-02.
{{cite web}}: CS1 maint: url-status (link) - ↑ "[锦州港]市政府组织召开关于加快推进锦州港液化天然气接收站项目专题会". 金融界. 2019-04-17.
{{cite web}}: CS1 maint: url-status (link) - ↑ "40个亿!280万吨/年!锦州港LNG接收站项目举行签约仪式!-国际燃气网". gas.in-en.com. 2019-04-28.
{{cite web}}: CS1 maint: url-status (link)
