Jubail Phase 3 power station is a proposed 3,000-megawatt (MW) gas-fired power plant in Ash Sharqiyah Region, Saudi Arabia.[1]
Location
The map below shows the approximate location of the proposed power station in Al-Jubail, Ash Sharqiyah Region, Saudi Arabia.
Background
Announced in 2018, the power plant project includes water desalination facilities.[1]
In August 2019, Saudi Water Partnership Company announced ten qualified bidders for the project, which had been revised from "an integrated water desalination and power plant of 1,170,000 m3/day of potable water capacity and 3,000 MW of power" to "two IWPs of 600,000 m3/day potable water capacity for Jubail-3A and 570,000 m3/day potable water capacity for Jubail-3B"[2] that will also "produce 3,000 MW of electricity with their related facilities".[3]
Project Details
- Sponsor: Saline Water Conversion Corporation (SWCC)[4]
- Parent company: Saline Water Conversion Corporation (SWCC)[5]
- Location: 18 km south of the Jubail Industrial City at the Arabian Gulf Coast, Al-Jubail, Ash Sharqiyah Region, Saudi Arabia
- Coordinates: 26.9598, 49.5687 (approximate)
- Gross capacity (proposed): 3,000 MW[1]
- Combined-cycle unit: 3,000 MW (no start-up date)
Articles and Resources
References
- ↑ 1.0 1.1 1.2 Developers invited for Jubail Phase 3 IWPP, Trade Arabia, Mar 13, 2018
- ↑ Cristina Novo , Qualified bidders for Jubail-3 IWPs announced, Smart Water Magazine, Aug 13, 2019
- ↑ SWCC - Jubail Desalination Plant Phase 3, ZAWYA, Apr 17 2019
- ↑ Jubail Phase 3 Independent Water & Power Project, Zawya, accessed August 3, 2020