Kisarazu Rinkai Gas Pipeline

From Global Energy Monitor
Part of the
Global Gas Infrastructure Tracker,
a Global Energy Monitor project.
Download full dataset
Report an error

Kisarazu Rinkai Gas Pipeline is an operating natural gas pipeline in Japan.[1]

Location

The first phase of the pipeline runs between Sodegaura city and Kisarazu city.[1][2] The second phase runs from Kisarazu to Kimitsu City, Japan. [3]

Loading map...

Project Details

  • Operator: Tokyo Gas
  • Owner: Tokyo Gas
  • Parent Company: Tokyo Gas
  • Capacity:
  • Length: 10.5 miles / 16.9 km
    • Phase one: 5.2 miles / 8.3 km[1]
    • Phase two: 5.3 miles / 8.6 km[3]
  • Diamater: 300 mm[1][3]
  • Status: Operating[4]
  • Start Year:
    • Phase one: 2008[1]
    • Phase two: 2015[3]
  • Cost:
  • Financing:
  • Associated Infrastructure:

Background

The first phase of the pipeline operates at a pressure of 7.0 MPa and has a diameter of 300 mm.[1] The second phase has a diameter of 300 mm.[3]

Articles and resources

References

  1. ↑ 1.0 1.1 1.2 1.3 1.4 1.5 Outline of Supply Plans, Tokyo Gas, March 2008
  2. ↑ Tokyo Gas (March 2016). "Outline of Supply Plans for FY2016" (PDF). Tokyo Gas. Retrieved 11 February 2020.{{cite web}}: CS1 maint: url-status (link)
  3. ↑ 3.0 3.1 3.2 3.3 3.4 Tokyo Gas Co., Ltd. (March 2014). "Outline of Supply Plans for FY2014" (PDF). Tokyo-Gas. Retrieved 11 February 2020.{{cite web}}: CS1 maint: url-status (link)
  4. ↑ "Integrated Report 2023" (PDF). TOKYO GAS (in 日本語). Retrieved 2024-08-06.{{cite web}}: CS1 maint: url-status (link)

Related GEM.wiki articles

External resources

External articles