Dinskaya power station (Кубанская ТЭС, Динская ТЭС) is a power station in pre-construction in Dinskoy, Krasnodar, Russia. It is also known as Kubanskaya CHP.

Location

Table 1: Project-level location details

Plant name Location Coordinates (WGS 84)
Dinskaya power station Dinskoy, Krasnodar, Russia 45.237836, 39.194857 (approximate)[1][2][3][4]
Loading map...

Project Details

Table 2: Unit-level details

Unit name Status Fuel(s) Capacity (MW) Technology CHP Start year Equipment Emergency/Backup
1 Pre-construction[5][6][4][3][7][8][2] fossil gas: natural gas[2][4] 235[5][7][2][4] combined cycle[5][2][4] not found 2029 (planned)[5][2][4] Power Machines: GTE-170[9][10] no
2 Pre-construction[5][6][4][3][7][8][2] fossil gas: natural gas[2][4] 235[5][7][2][4] combined cycle[5][2][4] not found 2029 (planned)[5][2][4] Power Machines: GTE-170[9][10] no

CHP is an abbreviation for Combined Heat and Power. It is a technology that produces electricity and thermal energy at high efficiencies. Coal units track this information in the Captive Use section when known.

Table 3: Unit-level ownership and operator details

Unit name Owner Parent
1 OGK-2 PJSC [100%][2] OGK-2 PJSC [100.0%]
2 OGK-2 PJSC [100%][2] OGK-2 PJSC [100.0%]

Ownership Tree

This ownership tree is part of the Global Energy Ownership Tracker, a project of Global Energy Monitor.

Background

Construction of the Kuban power plant on the territory of the Dinskoy district of the Krasndar Territory was included into the "General Layout of Power Infrastructure Placement until 2042", released by the Russian Ministry of Energy in December 2024, and the "Draft Schemes and Programs for Development of Power Systems of Russia for 2026-2031", published by the Russian Ministry of Energy in August 2025.[11][12] In August 2025, it was reported that design and approval stages of the project would take place in 2025, while the main construction phase is scheduled for 2026–2028.[13] According to the Directive of the Government of the Russian Federation No. 4131-r, released in December 2025, the power plant will consist of two combined-cycle units of 235 MW, both of which be commissioned by January 2030. [14]

Articles and Resources

References

  1. ↑ https://krasnodar.bz/news/6575-na-yuge-rossii-postrojat-tes-moschnostyu-2-25-gvt.html. {{cite web}}: Missing or empty |title= (help)
  2. ↑ 2.00 2.01 2.02 2.03 2.04 2.05 2.06 2.07 2.08 2.09 2.10 2.11 2.12 http://publication.pravo.gov.ru/document/0001202512290115?index=10. {{cite web}}: Missing or empty |title= (help)
  3. ↑ 3.0 3.1 3.2 https://gazeta-rvs.ru/v-dinskom-rajone-postroyat-tes-moshhnostyu-470-mvt/. {{cite web}}: Missing or empty |title= (help)
  4. ↑ 4.00 4.01 4.02 4.03 4.04 4.05 4.06 4.07 4.08 4.09 4.10 "ГЕНЕРАЛЬНАЯ СХЕМА размещения объектов электроэнергетики до 2042 года" (PDF). SO UPS of Russia. 2024-12-30. Archived from the original (PDF) on 2025-07-13. Retrieved 2025-03-10.
  5. ↑ 5.0 5.1 5.2 5.3 5.4 5.5 5.6 5.7 https://www.so-ups.ru/future-planning/public-discussion-sipr/public-discussion-sipr-2026-2031/. {{cite web}}: Missing or empty |title= (help)
  6. ↑ 6.0 6.1 https://neftegaz.ru/news/energy/880134-odk-prodvigaet-gtd-al-41st-25-kak-zamenu-inostrannym-dvigatelyam-pri-rekonstruktsii-elektrogeneratsi/. {{cite web}}: Missing or empty |title= (help)
  7. ↑ 7.0 7.1 7.2 7.3 https://kuban.rbc.ru/krasnodar/freenews/673c66f39a7947540e322002. {{cite web}}: Missing or empty |title= (help)
  8. ↑ 8.0 8.1 https://kuban.rbc.ru/krasnodar/freenews/6989d7889a7947bd43564274. {{cite web}}: Missing or empty |title= (help)
  9. ↑ 9.0 9.1 https://web.archive.org/web/20241206002014/https://www.rbc.ru/business/05/11/2024/672634f99a7947a12d4e49fe. Archived from the original on 2024-12-06. {{cite web}}: Missing or empty |title= (help)
  10. ↑ 10.0 10.1 "Правкомиссия по энергетике одобрила строительство новых энергоблоков в ОЭС Юга и не только Источник: https://neftegaz.ru/news/energy/887830-pravkomissiya-po-energetike-odobrila-stroitelstvo-novykh-energoblokov-v-oes-yuga-i-ne-tolko/". neftegaz.ru. 2025-04-30. Archived from the original on 2025-10-17. Retrieved 2025-10-08. {{cite web}}: External link in |title= (help)
  11. ↑ "ГЕНЕРАЛЬНАЯ СХЕМА размещения объектов электроэнергетики до 2042 года" (PDF). SDO UPS of Russia. December 30, 2024. Retrieved March 10, 2025.{{cite web}}: CS1 maint: url-status (link)
  12. ↑ "Проект СиПР ЭЭС России на 2026–2031 годы". SO UPS of Russia. August 31, 2025. Retrieved October 8, 2025.{{cite web}}: CS1 maint: url-status (link)
  13. ↑ "В Динском районе построят ТЭС мощностью 470 МВт". gazeta-rvs.ru. August 1, 2025. Retrieved October 8, 2025.{{cite web}}: CS1 maint: url-status (link)
  14. ↑ "Распоряжение Правительства Российской Федерации от 27.12.2025 № 4131-р". publication.pravo.gov.ru. 2025-12-27. Retrieved 2026-03-24.{{cite web}}: CS1 maint: url-status (link)

Additional data

To access additional data, including an interactive map of gas-fired power stations, a downloadable dataset, and summary data, please visit the Global Oil and Gas Plant Tracker on the Global Energy Monitor website.