LafargeHolcim Bangladesh Chhatak Cement Plant

From Global Energy Monitor
This article is part of the
Global Cement and Concrete Tracker, a project of Global Energy Monitor.
Download full dataset
Report an error
Sub-articles:

LafargeHolcim Bangladesh Chhatak Cement Plant (লাফার্জহোলসিম সুনামগঞ্জ সিমেন্ট প্ল্যান্ট (Bangla)), also known as Surma Cement Plant, is an integrated cement plant operating in Chhatak, Sylhet, Bangladesh.

Location

The map below shows the exact location of the cement plant in Chhatak, Sylhet, Bangladesh[1]:

Loading map...


Coordinates (WGS 84): 25.035495, 91.647603 (exact)[2]

Background

LafargeHolcim Bangladesh Limited, the only cross border commercial venture between Bangladesh and India, was incorporated in Bangladesh on November 11, 1997. In February 2017, the Company has changed its name to “LafargeHolcim Bangladesh Limited (LHBL)” from “Lafarge Surma Cement Limited” following the merger of Lafarge Surma Cement (Bangladesh) Ltd. and Holcim Cement (Bangladesh) Ltd. In January 2018, the Company completed the acquisition of 100% shares of Holcim Cement (Bangladesh) Limited (HBL) with the remittance of BDT 5,047.82 million.[3][4]

The company operates manufacturing plants at Sunamganj, Narayangong and Mongla in Bangladesh. These include this fully integrated cement plant at Sunamganj in Chhatak, and three grinding plants: Meghnaghat 1, Meghnaghat 2 and Mongla Plants.[4] All the mills are closed circuit ball mills.[3]

The Chhatak cement plant is notable as one of the only integrated cement plants in Bangladesh, which produces millions of tonnes per year of cement using imported clinker, but has less than two million tonnes of clinker production capacity. Of that, 1.3 million tonnes of clinker capacity are at the Chhatak plant.[5]

The Chhatak plant benefits from the world's longest cross-border conveyor belt, stretching 17 kilometers from India, which supplies the limestone needed for clinker production.[6]

Ownership Tree

This ownership tree is part of the Global Energy Ownership Tracker, a project of Global Energy Monitor.

Cement Plant Details

Table 1: General Plant Details

Plant type Plant status Start date
integrated[1] operating[7] 2006[1]

Table 2: Ownership Details

Additional information including parent company references and full ownership trees available at the Global Energy Ownership Tracker.
Parent company Parent company GEM ID Owner name Owner company GEM ID
LafargeHolcim Bangladesh PLC [100.0%] E100002007068 [100.0%] LafargeHolcim Bangladesh PLC [100.0%] (লাফার্জহোলসিম বাংলাদেশ লি (Bangla) [100.0%])[8] E100002007068 [100.0%]

Table 3: Capacities (million metric tonnes per annum)

Cement capacity Clinker capacity
1.45[9] 1.30[10]

Table 4: Cement Production (million metric tonnes per annum)

Primary cement color Primary cement type Clinker substitution rate 2024 -2025 Cement production
grey[11] blended[11][12] B[11][12] 1.14[10]

Table 5: Clinker Production

Clinker production method Number of operating kilns (accuracy) Number of developing kilns (accuracy) Kiln technology - preheater Kiln technology - precalciner Kiln technology - waste heat recovery
dry[1] 1 (exact)[13] unknown yes[13] unknown unknown

Table 6: Green Cement Technology

CCS/CCUS Alternative fuel Clay calcination
no[14] yes; refuse derived fuel (RDF)[10] no[14]

Articles and Resources

Additional data

To access additional data, including an interactive map of Cement plants, a downloadable dataset, and summary data, please visit the Global Cement and Concrete Tracker on the Global Energy Monitor website.

References

  1. 1.0 1.1 1.2 1.3 https://www.cemnet.com/News/story/140708/lafarge-surma-plant-starts-cement-production-bangladesh.html. {{cite web}}: Missing or empty |title= (help)
  2. https://www.google.com/maps/place/LafargeHolcim+Bangladesh+Ltd.+Surma+Plant/@25.035495;91.6450281;752m/data=!3m1!1e3!4m12!1m5!3m4!2zMjXCsDAyJzA3LjgiTiA5McKwMzgnNTEuNCJF!8m2!3d25.035495!4d91.647603!3m5!1s0x3750e4e2e15e2987:0xa5a98e0aec2a3b28!8m2!3d25.0342513!4d91.647456!16s%2Fg%2F1tdmhv9d?entry=ttu. {{cite web}}: Missing or empty |title= (help)
  3. 3.0 3.1 "Notice of an extraordinary general meeting of the shareholders" (PDF). LafargeHolcim. 2017. Retrieved 2025-01-30.{{cite web}}: CS1 maint: url-status (link)
  4. 4.0 4.1 "LafargeHolcim Bangladesh Limited" (PDF). ILSL Bangladesh. 2021-06. Retrieved 2025-01-30. {{cite web}}: Check date values in: |date= (help)CS1 maint: url-status (link)
  5. "Board of Directors Report 2025" (PDF). LafargeHolcim Bangladesh.{{cite web}}: CS1 maint: url-status (link)
  6. "Replacing the world's longest trans-border conveyor belt | Engineer Live". www.engineerlive.com. Retrieved 2026-05-28.
  7. https://in.investing.com/equities/lafarge-surma-cement-ltd-company-profile. {{cite web}}: Missing or empty |title= (help)
  8. https://www.lafargeholcim.com.bd/company-profile. {{cite web}}: Missing or empty |title= (help)
  9. (PDF) https://www.ilslbd.com/research_reports/Equity%20note%20-%20LafargeHolcim%20Bangladesh%20Limited.%20-%20June%202021.pdf. {{cite web}}: Missing or empty |title= (help)
  10. 10.0 10.1 10.2 (PDF) https://www.lafargeholcim.com.bd/sites/bangladesh/files/docs/board-of-directors-report-2025.pdf. {{cite web}}: Missing or empty |title= (help)
  11. 11.0 11.1 11.2 https://www.lafargeholcim.com.bd/cement-solutions. {{cite web}}: Missing or empty |title= (help)
  12. 12.0 12.1 (PDF) https://www.lafargeholcim.com.bd/sites/bangladesh/files/documents/egm-report-2017.pdf. {{cite web}}: Missing or empty |title= (help)
  13. 13.0 13.1 https://www.slideshare.net/slideshow/plant-overview-lafargeholcim-bangladesh-ltd-220112591/220112591. {{cite web}}: Missing or empty |title= (help)
  14. 14.0 14.1 https://www.lafargeholcim.com.bd/Sustainability. {{cite web}}: Missing or empty |title= (help)