Lumut LNG Terminal is a proposed LNG import terminal in Malaysia.

Location

Table 1: Location details

Name Location Coordinates (WGS 84)
Lumut LNG Terminal Malaysia[1] 4.240434, 100.603086 (approximate)

The map below shows the approximate location of the terminal:

Loading map...

Project Details

Table 2: Infrastructure details

mtpa = million tonnes per year
Name Facility type Status Capacity Total terminal capacity Offshore Associated infrastructure
Lumut LNG Terminal import[2] proposed[2][3] – – False –

Table 3: Cost

Name Facility type Cost Total known terminal costs
Lumut LNG Terminal import[2] – –

Financing

No financing data available.

Table 4: Project timeline

FID = Final Investment Decision, used by some developers to indicate a project will move forward
Name Facility type Status Proposal year FID year Construction year Operating year Inactive year
Lumut LNG Terminal import[2] proposed[2][3] 2025[2][3] – – – –

Ownership

Table 5: Ownership

Name Facility type Status Owners Parent companies Operator
Lumut LNG Terminal import[2] proposed[2][3] Petroliam Nasional Bhd[2] Petroliam Nasional Bhd –

Background

In March 2025, The Edge Malaysia reported that Malaysia's government had given Petronas Gas a mandate to develop an LNG terminal in Lumut, Perak, with a capacity at least as large as those of Pengerang Johor LNG Terminal and Melaka FSRU, which have capacities of 3.5 and 3.8 mtpa respectively. Tenaga Nasional Bhd was reportedly interested in taking a stake in the project.[4]

In June 2025, Petronas's chief executive confirmed the company's intention to develop the project.[5] In June 2026, it was confirmed that Petronas GAs Bhd and a unit of Tenaga Nasional Bhd, Integrax, had partnered to jointly develop Malaysia's first FSRU-based project in Lumut.[6][7] The project, also known as RGT-3, will have a regasification capacity of 500 million standard cubic feet (MMscf), and is expected to begin operating by the second quarter of 2029.[6][7][8] MISC Bhd was also reported to sign a contract for the "supply, and operation and maintenance of the FSRU."[9]

Articles and Resources

Additional data

To access additional data, including an interactive map of LNG terminals, a downloadable dataset, and summary data, please visit the Global Gas Infrastructure Tracker on the Global Energy Monitor website.

References

  1. ↑ https://www.google.com/maps/place/4%C2%B014'25.6%22N+100%C2%B036'11.1%22E/@4.2392329,100.6017063,1376m/data=!3m1!1e3!4m4!3m3!8m2!3d4.2404338!4d100.6030856?entry=ttu&g_ep=EgoyMDI1MTAwNC4wIKXMDSoASAFQAw%3D%3D. {{cite web}}: Missing or empty |title= (help)
  2. ↑ 2.0 2.1 2.2 2.3 2.4 2.5 2.6 2.7 2.8 https://www.argusmedia.com/en/news-and-insights/latest-market-news/2700241-malaysia-s-petronas-to-build-third-lng-import-terminal. {{cite web}}: Missing or empty |title= (help)
  3. ↑ 3.0 3.1 3.2 3.3 https://theedgemalaysia.com/node/749913. {{cite web}}: Missing or empty |title= (help)
  4. ↑ "Petronas to build regasification terminal in Lumut, third in Malaysia, say sources". theedgemalaysia.com. Retrieved 2025-10-07.
  5. ↑ "Malaysia's Petronas to build third LNG import terminal | Latest Market News". www.argusmedia.com. Retrieved 2025-10-07.
  6. ↑ 6.0 6.1 "PETRONAS Gas, TNB team up for Lumut LNG regas terminal, confirms The Edge report". theedgemalaysia.com. Retrieved 2026-06-05.
  7. ↑ 7.0 7.1 "Petronas Gas and Integrax ink pact for new LNG import terminal". www.giignl.org. Retrieved 2026-06-05.