Mallavaram-Bhopal-Bhilwara-Vijaipur Gas Pipeline

From Global Energy Monitor
This article is part of the Global Fossil Infrastructure Tracker, a project of Global Energy Monitor.
Sub-articles:

The Mallavaram-Bhopal-Bhilwara-Vijaipur Gas Pipeline is natural gas pipeline in India with phases that are operating and under construction.[1]

Location

The pipeline would run from Mallavaram, Andhra Pradesh, to Bhilwara, Rajasthan, while passing through Andhra Pradesh, Maharashtra, Madhya Pradesh.[2][3][4]

Loading map...

Project details

The entire pipeline is expected to be 1811 kilometers in length, and built in two phases.

Phase I

Phase I was built first, transporting gas from Kunchanapalli, Andhra Pradesh, to Ramagundam, Telangana, India.

Loading map...
  • Operator: GSPL India Transco Limited (GITL)[1]
  • Owner: GSPL India Transco Limited (GITL)[1]
  • Parent company: GSPL India Transco Limited (GITL)[1]
  • Capacity: 78.25 MMSCMD[1]
  • Length: 365 kilometers[1][5]
  • Diameter:
  • Status: Operating[1]
  • Start year: 2021[1]
  • Cost:
  • Financing:
  • Associated infrastructure:

Phase II

Loading map...
  • Operator: GSPL India Transco Limited (GITL)[1]
  • Owner: GSPL India Transco Limited (GITL)[1]
  • Parent company: GSPL India Transco Limited (GITL)[1]
  • Capacity: 78.25 MMSCMD[1]
  • Length: 1446 kilometers[1]
  • Diameter:
  • Status: Construction[1]
  • Start year: 2024[6]
  • Cost:
  • Financing:
  • Associated infrastructure:

Background

The pipeline would be owned and operated by GSPL India Transco Limited (GITL). The Petroleum and Natural Gas Regulatory Board (PNGRB) authorized GITL to build the pipeline in July 2011.[7] The pipeline would transport 27.8 billion cubic meters of gas per year from the D6 gas fields in Krishna Godavari basin on the east coast of Andhra Pradesh to Bhilwara, Rajasthan, crossing 27 districts in four states: Andhra Pradesh, Maharashtra, Madhya Pradesh, and Rajasthan.[2]

In June 2019 GITL was granted an extension until March 2020 to finish construction of the pipeline by the Petroleum & Natural Gas Regulatory Board (PNGRB).[8] As of March 2021, the project was listed as "partially commissioned" by PNGRB, with 365-kilometer Phase I in operation.[1]

Phase I was originally slated to become operational in 2020[1] but experienced delays.

Phase II is currently under construction with an expected start year of 2024.[6]

Articles and resources

References

  1. 1.00 1.01 1.02 1.03 1.04 1.05 1.06 1.07 1.08 1.09 1.10 1.11 1.12 1.13 1.14 1.15 "Partially Commissioned Common Carrier Natural Gas Pipelines". www.pngrb.gov.in. PNGRB. March 31, 2021. Retrieved 2021-09-03.{{cite web}}: CS1 maint: url-status (link)
  2. 2.0 2.1 Christopher E. Smith, "GSPL India lets engineering contract for 2,000-km natural gas pipeline," Oil and Gas Journal, 6 August 2012
  3. GSPC Ltd. "Full MBBVPL Map". Retrieved September 7, 2021.{{cite web}}: CS1 maint: url-status (link)
  4. "Regulatory Requirements | Mallavaram Bhopal Bhilwara Vijaipur Natural Gas Pipeline - Request for Connection". www.gspcgroup.com. Retrieved 2021-09-03.{{cite web}}: CS1 maint: url-status (link)
  5. "PNGRB Phase I schedule" (PDF). PNGRB. Retrieved 2021-12-10.{{cite web}}: CS1 maint: url-status (link)
  6. 6.0 6.1 "Mallavaram–Bhopal–Bhilwara–Vijaipur Phase II, India". Offshore Technology. Retrieved 2021-12-10.{{cite web}}: CS1 maint: url-status (link)
  7. Natural Gas Pipelines Under Construction, PNGRB, Jan. 15, 2016
  8. Implementation of Mallavaram-Bhopal-Bhilwara-Vijaipur Natural Gas Pipeline (MBBVPL), PNGRB, Jun. 21, 2019